메뉴 건너뛰기




Volumn 41, Issue 3, 2009, Pages 259-273

Risk-based optimization of large flood-diversion systems using genetic algorithms

Author keywords

Flood diversion system; Genetic algorithms; Risk based design; Uncertainty analysis

Indexed keywords

DESIGN; EMBANKMENT DAMS; GENETIC ALGORITHMS; MONTE CARLO METHODS; OPTIMIZATION; RISK ANALYSIS; ROUTING ALGORITHMS; SENSITIVITY ANALYSIS; TIME SERIES;

EID: 61449152197     PISSN: 0305215X     EISSN: 10290273     Source Type: Journal    
DOI: 10.1080/03052150802433213     Document Type: Article
Times cited : (40)

References (27)
  • 1
    • 34547471922 scopus 로고    scopus 로고
    • Spillway capacity optimization under hydrologic uncertainties and flood routing
    • Abrishamchi, A., Afshar, A., and Kerachian, R., 2003. Spillway capacity optimization under hydrologic uncertainties and flood routing. Iranian Journal of Science and Technology, 27 (B1), 111-121.
    • (2003) Iranian Journal of Science and Technology , vol.27 , Issue.B1 , pp. 111-121
    • Abrishamchi, A.1    Afshar, A.2    Kerachian, R.3
  • 5
    • 84978549605 scopus 로고
    • Fitting Gamma distribution over a synthetic unit hydrograph
    • Aron, G. and White, E., 1982. Fitting Gamma distribution over a synthetic unit hydrograph. Water Resources Bulletin, 18 (1), 95-78.
    • (1982) Water Resources Bulletin , vol.18 , Issue.1 , pp. 95-78
    • Aron, G.1    White, E.2
  • 6
    • 0023523115 scopus 로고
    • Evaluation of uncertainty in flood magnitude estimator on annual expected damage costs of hydraulic structures
    • Bao, Y., Tung, Y.K., and Hasfurther, V.R., 1987. Evaluation of uncertainty in flood magnitude estimator on annual expected damage costs of hydraulic structures. Water Resources Research, 23 (11), 2023-2029.
    • (1987) Water Resources Research , vol.23 , Issue.11 , pp. 2023-2029
    • Bao, Y.1    Tung, Y.K.2    Hasfurther, V.R.3
  • 7
    • 0343941864 scopus 로고    scopus 로고
    • Bobee, B., 1979. Discussion of Fitting the Pearson type 3 distribution in practice by J. Bucket and FR. Oliver. Water Resources Research, 15 (3), 730.
    • Bobee, B., 1979. Discussion of "Fitting the Pearson type 3 distribution in practice" by J. Bucket and FR. Oliver. Water Resources Research, 15 (3), 730.
  • 8
    • 0031537979 scopus 로고    scopus 로고
    • A globally convergent augmented Lagrangian barrier algorithm for optimization with general inequality constraints and simple bounds
    • Conn, A.R., Gould, N., and Toint, Ph. L., 1997. A globally convergent augmented Lagrangian barrier algorithm for optimization with general inequality constraints and simple bounds. Mathematics of Computation, 66 (217), 261-288.
    • (1997) Mathematics of Computation , vol.66 , Issue.217 , pp. 261-288
    • Conn, A.R.1    Gould, N.2    Toint, P.L.3
  • 9
    • 0026188607 scopus 로고
    • Confidence interval for design floods with estimated skew coefficient
    • Chowdhury, J.U. and Stedinger, J.R., 1991. Confidence interval for design floods with estimated skew coefficient. Journal of Hydraulic Engineering, 117 (7), 811-831.
    • (1991) Journal of Hydraulic Engineering , vol.117 , Issue.7 , pp. 811-831
    • Chowdhury, J.U.1    Stedinger, J.R.2
  • 10
    • 0032682780 scopus 로고    scopus 로고
    • Spillway design floods and dam safety
    • Fahlbusch, F. E., 1999. Spillway design floods and dam safety. Hydropower and Dams, 6 (4), 120-127.
    • (1999) Hydropower and Dams , vol.6 , Issue.4 , pp. 120-127
    • Fahlbusch, F.E.1
  • 11
    • 0016470436 scopus 로고
    • Confidence limit for design events
    • Kite, G. W., 1975. Confidence limit for design events. Water Resources Research, 11 (1), 48-53.
    • (1975) Water Resources Research , vol.11 , Issue.1 , pp. 48-53
    • Kite, G.W.1
  • 13
    • 34547138953 scopus 로고    scopus 로고
    • Risk analysis for dam overtopping-Feitsui reservoir as a case study
    • Kou, J.T., Yen, B.C., Hsu, Y.C., and Lin, H.F., 2007. Risk analysis for dam overtopping-Feitsui reservoir as a case study. Journal of Hydraulic Engineering, 133 (8), 955-963.
    • (2007) Journal of Hydraulic Engineering , vol.133 , Issue.8 , pp. 955-963
    • Kou, J.T.1    Yen, B.C.2    Hsu, Y.C.3    Lin, H.F.4
  • 14
    • 33947581401 scopus 로고    scopus 로고
    • Mixed interval-fuzzy two-stage integer programming and its application to flood-diversion planning
    • Li, Y.P., Huang, G.H., and Nie, S.L., 2007. Mixed interval-fuzzy two-stage integer programming and its application to flood-diversion planning. Engineering Optimization, 39 (2), 163-183.
    • (2007) Engineering Optimization , vol.39 , Issue.2 , pp. 163-183
    • Li, Y.P.1    Huang, G.H.2    Nie, S.L.3
  • 15
    • 85047696144 scopus 로고
    • Random variables versus uncertain values: Stochastic modeling and design
    • Lund, J.R., 1991. Random variables versus uncertain values: stochastic modeling and design. Journal of Water Resources Planning and Management, 117 (2), 179-194.
    • (1991) Journal of Water Resources Planning and Management , vol.117 , Issue.2 , pp. 179-194
    • Lund, J.R.1
  • 17
    • 61449096162 scopus 로고
    • Mahab Ghodds Consulting Engineers, Tehran, Iran
    • Mahab Ghodds Consulting Engineers, 1990. Karoon III reservoir reports. Tehran, Iran.
    • (1990) Karoon III reservoir reports
  • 18
    • 33750126661 scopus 로고    scopus 로고
    • Case study: Dam safety during construction, lessons of the overtopping diversion works at Aguamilpa dam
    • Marengo, H., 2006. Case study: dam safety during construction, lessons of the overtopping diversion works at Aguamilpa dam. Journal of Hydraulic Engineering, 132(11), 1121-1127.
    • (2006) Journal of Hydraulic Engineering , vol.132 , Issue.11 , pp. 1121-1127
    • Marengo, H.1
  • 22
    • 0020549890 scopus 로고
    • Confidence intervals for design events
    • Stedinger, J.R., 1983. Confidence intervals for design events. Journal of Hydraulic Engineering, 109 (1), 13-27.
    • (1983) Journal of Hydraulic Engineering , vol.109 , Issue.1 , pp. 13-27
    • Stedinger, J.R.1
  • 23
    • 0023421456 scopus 로고
    • Effects of uncertainties on optimal risk-based design of hydraulic structures
    • Tung, Y.K., 1987. Effects of uncertainties on optimal risk-based design of hydraulic structures. Journal of Water Resources Planning and Management, 113 (5), 709-722.
    • (1987) Journal of Water Resources Planning and Management , vol.113 , Issue.5 , pp. 709-722
    • Tung, Y.K.1
  • 26
    • 2142783934 scopus 로고    scopus 로고
    • Risk-based analysis for flood damage reduction studies
    • United States Army Corps of Engineers, Washington, DC
    • United States Army Corps of Engineers., 1996. Risk-based analysis for flood damage reduction studies. Engineer Manual EM 1110-2-1619, Washington, DC.
    • (1996) Engineer Manual EM 1110-2-1619
  • 27
    • 0003553976 scopus 로고
    • United States Bureau of Reclamation, USA: Water Resources Technical Publications
    • United States Bureau of Reclamation., 1987. Design of small dams. USA: Water Resources Technical Publications.
    • (1987) Design of small dams


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.