-
1
-
-
0035426460
-
Optimal material control in an assembly system with component commonality
-
DOI 10.1002/nav.1026
-
Agrawal, M., M. Cohen,. 2001. Optimal material control and performance evaluation in an assembly environment with component commonality. Naval Res. Logist. 48 (5): 409-429. (Pubitemid 32693934)
-
(2001)
Naval Research Logistics
, vol.48
, Issue.5
, pp. 409-429
-
-
Agrawal, N.1
Cohen, M.A.2
-
2
-
-
0031501731
-
Stochastic inventory models with limited production capacity and periodically varying parameters
-
Aviv, Y., A. Federgruen,. 1997. Stochastic inventory models with limited production capacity and periodically varying parameters. Probab. Eng. Inf. Sci. 11: 107-135.
-
(1997)
Probab. Eng. Inf. Sci.
, vol.11
, pp. 107-135
-
-
Aviv, Y.1
Federgruen, A.2
-
3
-
-
0035322377
-
Capacitated multi-item inventory systems with random and seasonally fluctuating demands: Implications for postponement strategies
-
Aviv, Y., A. Federgruen,. 2001. Capacitated multi-item inventory systems with random and seasonally fluctuating demands: Implications for postponement strategies. Manage. Sci. 47 (4): 512-531. (Pubitemid 34192779)
-
(2001)
Management Science
, vol.47
, Issue.4
, pp. 512-531
-
-
Aviv, Y.1
Federgruen, A.2
-
4
-
-
0033325198
-
Simultaneous planning of production, capacity, and inventory in seasonal demand environments
-
Bradley, J. R., B. C. Arntzen,. 1999. The simultaneous planning of production, capacity, and inventory in seasonal demand environments. Oper. Res. 47 (6): 795-806. (Pubitemid 30594279)
-
(1999)
Operations Research
, vol.47
, Issue.6
, pp. 795-806
-
-
Bradley, J.R.1
Arntzen, B.C.2
-
5
-
-
0036520077
-
Inventory-service optimization in configure-to-order systems
-
Cheng, F., M. Ettl, G. Y. Lin, D. D. Yao,. 2002. Inventory-service optimization in configure-to-order systems. Manu. Ser. Oper. Manag. 4 (2): 114-132.
-
(2002)
Manu. Ser. Oper. Manag.
, vol.4
, Issue.2
, pp. 114-132
-
-
Cheng, F.1
Ettl, M.2
Lin, G.Y.3
Yao, D.D.4
-
6
-
-
17744371900
-
-
Proceedings of the 45th Annual IEEE Symposium on Foundations of Computer Science, Rome, Italy
-
Dean, B., M. X. Goemans, J. Vondrak,. 2004. Approximating the Stochastic Knapsack Problem: The Benefit of Adaptivity. Proceedings of the 45th Annual IEEE Symposium on Foundations of Computer Science, Rome, Italy, pp. 208-217.
-
(2004)
Approximating the Stochastic Knapsack Problem: The Benefit of Adaptivity
, pp. 208-217
-
-
Dean, B.1
Goemans, M.X.2
Vondrak, J.3
-
8
-
-
84892233015
-
Applications of implosion in manufacturing
-
D. Connors, T. Ervolina, J. P. Fasano, R. Lougee-Heimer, R. Wittrock. An, C. H. Fromm eds. Springer, Heidelberg
-
Dietrich, B., D. Connors, T. Ervolina, J. P. Fasano, R. Lougee-Heimer, R. Wittrock. 2005. Applications of implosion in manufacturing., An, C., H. Fromm, eds. Advances in Supply Chain Management, Springer, Heidelberg, 97-115.
-
(2005)
Advances in Supply Chain Management
, pp. 97-115
-
-
Dietrich, B.1
-
9
-
-
0022721357
-
An inventory model with limited production capacity and uncertain demands I. The average-cost criterion
-
Federgruen, A., P. Zipkin,. 1986a. An inventory model with limited production capacity and uncertain demands I. The average-cost criterion. Math. Oper. Res. 11 (2): 193-207. (Pubitemid 16566991)
-
(1986)
Mathematics of Operations Research
, vol.11
, Issue.2
, pp. 193-207
-
-
Federgruen, A.1
Zipkin, P.2
-
10
-
-
0022722532
-
An inventory model with limited production capacity and uncertain demands II. The discounted-cost criterion
-
Federgruen, A., P. Zipkin,. 1986b. An inventory model with limited production capacity and uncertain demands II. The discounted-cost criterion. Math. Oper. Res. 11 (2): 208-215. (Pubitemid 16566992)
-
(1986)
Mathematics of Operations Research
, vol.11
, Issue.2
, pp. 208-215
-
-
Federgruen, A.1
Zipkin, P.2
-
11
-
-
0000085786
-
Mass customization at Hewlett Packard: The power of postponement
-
Feitzinger, E., and, H. Lee,. 1997. Mass customization at Hewlett Packard: The power of postponement. Harvard Bus. Rev. 75 (1): 116-121.
-
(1997)
Harvard Bus. Rev.
, vol.75
, Issue.1
, pp. 116-121
-
-
Feitzinger, E.1
Lee, H.2
-
12
-
-
0000588430
-
Discrete optimization via marginal analysis
-
Fox, B., 1966. Discrete optimization via marginal analysis. Manage. Sci. 13 (1): 210-216.
-
(1966)
Manage. Sci.
, vol.13
, Issue.1
, pp. 210-216
-
-
Fox, B.1
-
13
-
-
0029254553
-
Sensitivity analysis for base-stock levels in multi-echelon production-inventory systems
-
Glasserman, P., S. Tayur,. 1995. Sensitivity analysis for base-stock levels in multi-echelon production-inventory systems. Manage. Sci. 42 (5): 263-281.
-
(1995)
Manage. Sci.
, vol.42
, Issue.5
, pp. 263-281
-
-
Glasserman, P.1
Tayur, S.2
-
14
-
-
0032169180
-
Order response time reliability in a multi-item inventory system
-
Hausman, W. H., H. L. Lee, A. X. Zhang,. 1998. Order response time reliability in a multi-item inventory system. Eur. J. Oper. Res. 109 (3): 646-659.
-
(1998)
Eur. J. Oper. Res.
, vol.109
, Issue.3
, pp. 646-659
-
-
Hausman, W.H.1
Lee, H.L.2
Zhang, A.X.3
-
15
-
-
0000519910
-
Multiproduct production scheduling for style goods with limited capacity, forecast revisions and terminal delivery
-
Hausman, W. H., R. Peterson,. 1972. Multiproduct production scheduling for style goods with limited capacity, forecast revisions and terminal delivery. Manage. Sci. 18 (7): 370-383.
-
(1972)
Manage. Sci.
, vol.18
, Issue.7
, pp. 370-383
-
-
Hausman, W.H.1
Peterson, R.2
-
17
-
-
25144475949
-
Effective heuristics for capacitated production planning with multiperiod production and demand with forecast band refinement
-
DOI 10.1287/msom.1030.0032
-
Kaminsky, P., J. M. Swaminathan,. 2004. Effective heuristics for capacitated production planning with multiperiod production and demand with forecast band refinement. Manu. Ser. Oper. Manag. 6 (2): 184-194. (Pubitemid 41342342)
-
(2004)
Manufacturing and Service Operations Management
, vol.6
, Issue.2
, pp. 184-194
-
-
Kaminsky, P.1
Swaminathan, J.M.2
-
18
-
-
0017109409
-
On incremental analysis in resource allocations
-
Kao, E. P., 1976. On incremental analysis in resource allocations. Oper. Res. Quart. 27 (3): 759-763.
-
(1976)
Oper. Res. Quart.
, vol.27
, Issue.3
, pp. 759-763
-
-
Kao, E.P.1
-
19
-
-
0032201894
-
A capacitated production-inventory model with periodic demand
-
Kapuscinski, R., S. Tayur,. 1998. A capacitated production-inventory model with periodic demand. Oper. Res. 46 (6): 899-911. (Pubitemid 128665750)
-
(1998)
Operations Research
, vol.46
, Issue.6
, pp. 899-911
-
-
Kapuscinski, R.1
Tayur, S.2
-
20
-
-
0036680991
-
Integrating advance order information in make-to-stock production systems
-
DOI 10.1023/A:1014925525185
-
Karaesman, F., J. A. Buzzacott, Y. Dallery,. 2002. Integrating advance order information in make-to-stock production systems. IIE Tran. 34 (8): 649-662. (Pubitemid 34515113)
-
(2002)
IIE Transactions (Institute of Industrial Engineers)
, vol.34
, Issue.8
, pp. 649-662
-
-
Karaesmen, F.1
Buzacott, J.A.2
Dallery, Y.3
-
21
-
-
61349148679
-
Approximation algorithms for capacitated stochastic inventory control model
-
Levi, R., R. Roundy, D. Shmoys, V. Truong,. 2008. Approximation algorithms for capacitated stochastic inventory control model. Oper. Res. 56 (5): 1186-1199.
-
(2008)
Oper. Res.
, vol.56
, Issue.5
, pp. 1186-1199
-
-
Levi, R.1
Roundy, R.2
Shmoys, D.3
Truong, V.4
-
22
-
-
33847046790
-
Inventory planning with forecast updates: Approximation solutions and cost error bounds
-
Lu, X., J. S. Song, A. C. Regan,. 2006. Inventory planning with forecast updates: Approximation solutions and cost error bounds. Oper. Res. 54 (6): 1079-1097.
-
(2006)
Oper. Res.
, vol.54
, Issue.6
, pp. 1079-1097
-
-
Lu, X.1
Song, J.S.2
Regan, A.C.3
-
23
-
-
4344612887
-
Order fill rate, leadtime variability, and advance demand information in an assemble-to-order system
-
Lu, Y., J. S. Song, D. D. Yao,. 2003. Order fill rate, leadtime variability, and advance demand information in an assemble-to-order system. Oper. Res. 51 (2): 292-308.
-
(2003)
Oper. Res.
, vol.51
, Issue.2
, pp. 292-308
-
-
Lu, Y.1
Song, J.S.2
Yao, D.D.3
-
24
-
-
22944485991
-
Backorder minimization in multiproduct assemble-to-order systems
-
DOI 10.1080/07408170590961139
-
Lu, Y., J. S. Song, D. D. Yao,. 2005. Backorder minimization in multiproduct assemble-to-order systems. IIE Trans. 37 (8): 763-774. (Pubitemid 41046662)
-
(2005)
IIE Transactions (Institute of Industrial Engineers)
, vol.37
, Issue.8
, pp. 763-774
-
-
Lu, Y.1
Song, J.-S.2
Yao, D.D.3
-
25
-
-
79953874722
-
The impact of demand uncertainty and capacity configuration on performance in a configure-to-order environment
-
Nyaga, G. N., D. J. Closs, A. M. Rodrigues, R. J. Calantone,. 2007. The impact of demand uncertainty and capacity configuration on performance in a configure-to-order environment. J. Bus. Logis. 28 (2): 83-104.
-
(2007)
J. Bus. Logis.
, vol.28
, Issue.2
, pp. 83-104
-
-
Nyaga, G.N.1
Closs, D.J.2
Rodrigues, A.M.3
Calantone, R.J.4
-
27
-
-
0036758161
-
Performance analysis and optimization of assemble-to-order systems with random leadtimes
-
Song, J. S., D. D. Yao,. 2002. Performance analysis and optimization of assemble-to-order systems with random leadtimes. Oper. Res. 50 (5): 889-903.
-
(2002)
Oper. Res.
, vol.50
, Issue.5
, pp. 889-903
-
-
Song, J.S.1
Yao, D.D.2
-
28
-
-
0242604660
-
-
Kluwer, Boston
-
Song, J. S., D. D. Yao,. (eds.) 2001. Supply Chain Structures: Coordination, Information, and Optimization. Kluwer, Boston.
-
(2001)
Supply Chain Structures: Coordination, Information, and Optimization
-
-
Song, J.S.1
Yao, D.D.2
-
29
-
-
77950476024
-
Assemble-to-order systems
-
de Kok A. G. S. Graves, eds. Elsevier, Amsterdam
-
Song, J. S., P. Zipkin,. 2003. Assemble-to-order systems. In:, de Kok A. G., S. Graves, eds. Handbooks in Operations Research and Management Science, Vol. 11. Supply Chain Management: Design, Coordination and Operation. Elsevier, Amsterdam, 561-596.
-
(2003)
Handbooks in Operations Research and Management Science, Vol. 11. Supply Chain Management: Design, Coordination and Operation
, vol.11
, pp. 561-596
-
-
Song, J.S.1
Zipkin, P.2
-
30
-
-
0032292446
-
Managing broader product lines through delayed differentiation using vanilla boxes
-
Swaminathan, J. M., S. R. Tayur,. 1998. Managing broader product lines through delayed differentiation using vanilla boxes. Manage. Sci. 44 (12): 161-172.
-
(1998)
Manage. Sci.
, vol.44
, Issue.12
, pp. 161-172
-
-
Swaminathan, J.M.1
Tayur, S.R.2
-
31
-
-
29144523061
-
On the implementation of an interior-point filter line-search algorithm for large-scale nonlinear programming
-
DOI 10.1007/s10107-004-0559-y
-
Waechter, A., L. T. Biegler,. 2006. On the implementation of a primal-dual interior point filter line search algorithm for large-scale nonlinear programming. Math. Prog. 106 (1): 25-57. (Pubitemid 41813168)
-
(2006)
Mathematical Programming
, vol.106
, Issue.1
, pp. 25-57
-
-
Wachter, A.1
Biegler, L.T.2
|