-
2
-
-
0001501655
-
Application of a technique for research and development program evaluation
-
D. Malcolm, J. Roseboom, C. Clark, and W. Fazar Application of a technique for research and development program evaluation Operations Research 7 5 1959 646 669
-
(1959)
Operations Research
, vol.7
, Issue.5
, pp. 646-669
-
-
Malcolm, D.1
Roseboom, J.2
Clark, C.3
Fazar, W.4
-
3
-
-
85044160449
-
Critical-path planning and scheduling
-
Boston, Dec 1-3
-
J. Kelly, M. Walker, Critical-path planning and scheduling, in: Proceedings of the Eastern Joint Computer Conference, 160-173, Boston, Dec 1-3, 1959.
-
(1959)
Proceedings of the Eastern Joint Computer Conference
, pp. 160-173
-
-
Kelly, J.1
Walker, M.2
-
5
-
-
0001215033
-
The analysis of activity networks under generalized precedence relations
-
S. Elmaghraby, and J. Kamburowski The analysis of activity networks under generalized precedence relations Management Science 38 9 1992 1245 1263
-
(1992)
Management Science
, vol.38
, Issue.9
, pp. 1245-1263
-
-
Elmaghraby, S.1
Kamburowski, J.2
-
6
-
-
70350704887
-
From DSM-based planning to design process simulation: A review of process scheme logic verification issues
-
A. Karnie, and Y. Reich From DSM-based planning to design process simulation: a review of process scheme logic verification issues IEEE Transactions on Engineering Management 56 4 2009 636 649
-
(2009)
IEEE Transactions on Engineering Management
, vol.56
, Issue.4
, pp. 636-649
-
-
Karnie, A.1
Reich, Y.2
-
8
-
-
11144299339
-
A model-based method for organizing tasks in product development
-
S.D. Eppinger, D.E. Whitney, R. Smith, and D. Gebala A model-based method for organizing tasks in product development Research in Engineering Design 6 1 1994 1 13
-
(1994)
Research in Engineering Design
, vol.6
, Issue.1
, pp. 1-13
-
-
Eppinger, S.D.1
Whitney, D.E.2
Smith, R.3
Gebala, D.4
-
11
-
-
0000611747
-
A multilevel optimization approach considering product realization process alternatives and parameters for improving manufacturability
-
D. Xue A multilevel optimization approach considering product realization process alternatives and parameters for improving manufacturability Journal of Manufacturing Systems 16 5 1997 337 351
-
(1997)
Journal of Manufacturing Systems
, vol.16
, Issue.5
, pp. 337-351
-
-
Xue, D.1
-
13
-
-
0031084622
-
Identifying control features of engineering design iteration
-
R.P. Smith, and S.D. Eppinger Identifying control features of engineering design iteration Management Science 43 3 1997 276 293
-
(1997)
Management Science
, vol.43
, Issue.3
, pp. 276-293
-
-
Smith, R.P.1
Eppinger, S.D.2
-
14
-
-
0031199079
-
A predictive model of predicting iteration in engineering design
-
R.P. Smith, and S.D. Eppinger A predictive model of predicting iteration in engineering design Management Science 43 8 1997 1104 1120
-
(1997)
Management Science
, vol.43
, Issue.8
, pp. 1104-1120
-
-
Smith, R.P.1
Eppinger, S.D.2
-
16
-
-
0030147006
-
Managing the simultaneous execution of coupled phases in concurrent product development
-
V. Krishnan Managing the simultaneous execution of coupled phases in concurrent product development IEEE Transactions on Engineering Management 43 2 1996 210 217
-
(1996)
IEEE Transactions on Engineering Management
, vol.43
, Issue.2
, pp. 210-217
-
-
Krishnan, V.1
-
17
-
-
0031108561
-
A model based framework to overlap product development activities
-
V. Krishnan, S.D. Eppinger, and D.E. Whitney A model based framework to overlap product development activities Management Science 43 4 1997 437 451
-
(1997)
Management Science
, vol.43
, Issue.4
, pp. 437-451
-
-
Krishnan, V.1
Eppinger, S.D.2
Whitney, D.E.3
-
19
-
-
0037352301
-
Decomposition of interdependent task group for concurrent engineering
-
S.J. Chen, and L. Lin Decomposition of interdependent task group for concurrent engineering Computers and Industrial Engineering 44 3 2003 435 459
-
(2003)
Computers and Industrial Engineering
, vol.44
, Issue.3
, pp. 435-459
-
-
Chen, S.J.1
Lin, L.2
-
22
-
-
0029309888
-
Resource constrained scheduling of hierarchically structured design activity networks
-
U. Belhe, and A. Kusiak Resource constrained scheduling of hierarchically structured design activity networks IEEE Transactions on Engineering Management 42 2 1995 150 158
-
(1995)
IEEE Transactions on Engineering Management
, vol.42
, Issue.2
, pp. 150-158
-
-
Belhe, U.1
Kusiak, A.2
-
24
-
-
77955199335
-
Evaluation of acceleration effect of dynamic sequencing of design process in a multiproject environment
-
C. Kang, and Y.S. Hong Evaluation of acceleration effect of dynamic sequencing of design process in a multiproject environment Transactions of the ASME Journal of Mechanical Design 131 2 2009 021008
-
(2009)
Transactions of the ASME Journal of Mechanical Design
, vol.131
, Issue.2
, pp. 021008
-
-
Kang, C.1
Hong, Y.S.2
-
25
-
-
23344432043
-
A simulation-based process model for managing complex design projects
-
S. Cho, and S.D. Eppinger A simulation-based process model for managing complex design projects IEEE Transactions on Engineering Management 52 3 2005 316 328
-
(2005)
IEEE Transactions on Engineering Management
, vol.52
, Issue.3
, pp. 316-328
-
-
Cho, S.1
Eppinger, S.D.2
-
26
-
-
0036881796
-
Modeling impact of process architecture on cost and schedule risk in product development
-
T. Browning, and S.D. Eppinger Modeling impact of process architecture on cost and schedule risk in product development IEEE Transaction on Engineering Management 49 4 2002 443 458
-
(2002)
IEEE Transaction on Engineering Management
, vol.49
, Issue.4
, pp. 443-458
-
-
Browning, T.1
Eppinger, S.D.2
-
27
-
-
31744434154
-
A simulation-based optimization framework for product development cycle time reduction
-
H.M.E. Abdelsalam, and H.P. Bao A simulation-based optimization framework for product development cycle time reduction IEEE Transaction on Engineering Management 53 1 2006 69 85
-
(2006)
IEEE Transaction on Engineering Management
, vol.53
, Issue.1
, pp. 69-85
-
-
Abdelsalam, H.M.E.1
Bao, H.P.2
-
28
-
-
34248386115
-
Re-sequencing of design processes with activity stochastic time and cost: An optimization-simulation approach
-
H.M.E. Abdelsalam, and H.P. Bao Re-sequencing of design processes with activity stochastic time and cost: an optimization-simulation approach Transactions of ASME Journal of Mechanical Design 129 2 2007 150 157
-
(2007)
Transactions of ASME Journal of Mechanical Design
, vol.129
, Issue.2
, pp. 150-157
-
-
Abdelsalam, H.M.E.1
Bao, H.P.2
-
30
-
-
0026837875
-
Practical use of distributions in network analysis
-
T. Williams Practical use of distributions in network analysis Journal of Operation Research Society 43 3 1992 265 270
-
(1992)
Journal of Operation Research Society
, vol.43
, Issue.3
, pp. 265-270
-
-
Williams, T.1
-
31
-
-
0033676587
-
'Signposting', a parameter-driven task-based model of the design process
-
P.J. Clarkson, and J.R. Hamilton 'Signposting', a parameter-driven task-based model of the design process Research in Engineering Design 12 1 2000 18 38
-
(2000)
Research in Engineering Design
, vol.12
, Issue.1
, pp. 18-38
-
-
Clarkson, P.J.1
Hamilton, J.R.2
-
32
-
-
70449434719
-
An adaptive process model to support product development project management
-
V. Levardy, and T.R. Browning An adaptive process model to support product development project management IEEE Transaction on Engineering Management 56 4 2009 600 620
-
(2009)
IEEE Transaction on Engineering Management
, vol.56
, Issue.4
, pp. 600-620
-
-
Levardy, V.1
Browning, T.R.2
-
33
-
-
78650621974
-
Process template based flexible resource integration for product innovative reuse design
-
Y.L. Li, and W. Zhao Process template based flexible resource integration for product innovative reuse design International Journal of Computer Integrated Manufacturing 24 1 2011 53 73
-
(2011)
International Journal of Computer Integrated Manufacturing
, vol.24
, Issue.1
, pp. 53-73
-
-
Li, Y.L.1
Zhao, W.2
|