메뉴 건너뛰기




Volumn 26, Issue 3, 2012, Pages 529-538

A process simulation based method for scheduling product design change propagation

Author keywords

"And Or" graph; Change propagation; Scheduling; Simulation

Indexed keywords

AND/OR GRAPHS; CHANGE PROPAGATION; COMPLETION TIME; COMPLEX PRODUCTS; CUSTOMER REQUIREMENTS; CYCLE ENGINES; DESIGN CHANGE; DESIGN PROCESS; DESIGN TASKS; INPUT AND OUTPUTS; MATHEMATIC MODEL; MONTE CARLO; OBJECTIVE FUNCTIONS; OPTIMIZATION PACKAGES; ORIGINAL DESIGN; PROCESS SIMULATIONS; PROCESS TIME; PROPAGATION PATHS; REGRESSION MODEL; SIMULATION; SIMULATION ALGORITHMS; WHOLE PROCESS;

EID: 84863779636     PISSN: 14740346     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.aei.2012.04.006     Document Type: Article
Times cited : (57)

References (35)
  • 2
    • 0001501655 scopus 로고
    • Application of a technique for research and development program evaluation
    • D. Malcolm, J. Roseboom, C. Clark, and W. Fazar Application of a technique for research and development program evaluation Operations Research 7 5 1959 646 669
    • (1959) Operations Research , vol.7 , Issue.5 , pp. 646-669
    • Malcolm, D.1    Roseboom, J.2    Clark, C.3    Fazar, W.4
  • 5
    • 0001215033 scopus 로고
    • The analysis of activity networks under generalized precedence relations
    • S. Elmaghraby, and J. Kamburowski The analysis of activity networks under generalized precedence relations Management Science 38 9 1992 1245 1263
    • (1992) Management Science , vol.38 , Issue.9 , pp. 1245-1263
    • Elmaghraby, S.1    Kamburowski, J.2
  • 6
    • 70350704887 scopus 로고    scopus 로고
    • From DSM-based planning to design process simulation: A review of process scheme logic verification issues
    • A. Karnie, and Y. Reich From DSM-based planning to design process simulation: a review of process scheme logic verification issues IEEE Transactions on Engineering Management 56 4 2009 636 649
    • (2009) IEEE Transactions on Engineering Management , vol.56 , Issue.4 , pp. 636-649
    • Karnie, A.1    Reich, Y.2
  • 11
    • 0000611747 scopus 로고    scopus 로고
    • A multilevel optimization approach considering product realization process alternatives and parameters for improving manufacturability
    • D. Xue A multilevel optimization approach considering product realization process alternatives and parameters for improving manufacturability Journal of Manufacturing Systems 16 5 1997 337 351
    • (1997) Journal of Manufacturing Systems , vol.16 , Issue.5 , pp. 337-351
    • Xue, D.1
  • 13
    • 0031084622 scopus 로고    scopus 로고
    • Identifying control features of engineering design iteration
    • R.P. Smith, and S.D. Eppinger Identifying control features of engineering design iteration Management Science 43 3 1997 276 293
    • (1997) Management Science , vol.43 , Issue.3 , pp. 276-293
    • Smith, R.P.1    Eppinger, S.D.2
  • 14
    • 0031199079 scopus 로고    scopus 로고
    • A predictive model of predicting iteration in engineering design
    • R.P. Smith, and S.D. Eppinger A predictive model of predicting iteration in engineering design Management Science 43 8 1997 1104 1120
    • (1997) Management Science , vol.43 , Issue.8 , pp. 1104-1120
    • Smith, R.P.1    Eppinger, S.D.2
  • 16
    • 0030147006 scopus 로고    scopus 로고
    • Managing the simultaneous execution of coupled phases in concurrent product development
    • V. Krishnan Managing the simultaneous execution of coupled phases in concurrent product development IEEE Transactions on Engineering Management 43 2 1996 210 217
    • (1996) IEEE Transactions on Engineering Management , vol.43 , Issue.2 , pp. 210-217
    • Krishnan, V.1
  • 17
    • 0031108561 scopus 로고    scopus 로고
    • A model based framework to overlap product development activities
    • V. Krishnan, S.D. Eppinger, and D.E. Whitney A model based framework to overlap product development activities Management Science 43 4 1997 437 451
    • (1997) Management Science , vol.43 , Issue.4 , pp. 437-451
    • Krishnan, V.1    Eppinger, S.D.2    Whitney, D.E.3
  • 19
    • 0037352301 scopus 로고    scopus 로고
    • Decomposition of interdependent task group for concurrent engineering
    • S.J. Chen, and L. Lin Decomposition of interdependent task group for concurrent engineering Computers and Industrial Engineering 44 3 2003 435 459
    • (2003) Computers and Industrial Engineering , vol.44 , Issue.3 , pp. 435-459
    • Chen, S.J.1    Lin, L.2
  • 20
    • 18144409122 scopus 로고    scopus 로고
    • A formal two-phase method for decomposition of complex design problems
    • L. Chen, Z. Ding, and S. Li A formal two-phase method for decomposition of complex design problems Transactions of ASME Journal of Mechanical Design 127 2 2005 184 195
    • (2005) Transactions of ASME Journal of Mechanical Design , vol.127 , Issue.2 , pp. 184-195
    • Chen, L.1    Ding, Z.2    Li, S.3
  • 22
    • 0029309888 scopus 로고
    • Resource constrained scheduling of hierarchically structured design activity networks
    • U. Belhe, and A. Kusiak Resource constrained scheduling of hierarchically structured design activity networks IEEE Transactions on Engineering Management 42 2 1995 150 158
    • (1995) IEEE Transactions on Engineering Management , vol.42 , Issue.2 , pp. 150-158
    • Belhe, U.1    Kusiak, A.2
  • 24
    • 77955199335 scopus 로고    scopus 로고
    • Evaluation of acceleration effect of dynamic sequencing of design process in a multiproject environment
    • C. Kang, and Y.S. Hong Evaluation of acceleration effect of dynamic sequencing of design process in a multiproject environment Transactions of the ASME Journal of Mechanical Design 131 2 2009 021008
    • (2009) Transactions of the ASME Journal of Mechanical Design , vol.131 , Issue.2 , pp. 021008
    • Kang, C.1    Hong, Y.S.2
  • 25
    • 23344432043 scopus 로고    scopus 로고
    • A simulation-based process model for managing complex design projects
    • S. Cho, and S.D. Eppinger A simulation-based process model for managing complex design projects IEEE Transactions on Engineering Management 52 3 2005 316 328
    • (2005) IEEE Transactions on Engineering Management , vol.52 , Issue.3 , pp. 316-328
    • Cho, S.1    Eppinger, S.D.2
  • 26
    • 0036881796 scopus 로고    scopus 로고
    • Modeling impact of process architecture on cost and schedule risk in product development
    • T. Browning, and S.D. Eppinger Modeling impact of process architecture on cost and schedule risk in product development IEEE Transaction on Engineering Management 49 4 2002 443 458
    • (2002) IEEE Transaction on Engineering Management , vol.49 , Issue.4 , pp. 443-458
    • Browning, T.1    Eppinger, S.D.2
  • 27
    • 31744434154 scopus 로고    scopus 로고
    • A simulation-based optimization framework for product development cycle time reduction
    • H.M.E. Abdelsalam, and H.P. Bao A simulation-based optimization framework for product development cycle time reduction IEEE Transaction on Engineering Management 53 1 2006 69 85
    • (2006) IEEE Transaction on Engineering Management , vol.53 , Issue.1 , pp. 69-85
    • Abdelsalam, H.M.E.1    Bao, H.P.2
  • 28
    • 34248386115 scopus 로고    scopus 로고
    • Re-sequencing of design processes with activity stochastic time and cost: An optimization-simulation approach
    • H.M.E. Abdelsalam, and H.P. Bao Re-sequencing of design processes with activity stochastic time and cost: an optimization-simulation approach Transactions of ASME Journal of Mechanical Design 129 2 2007 150 157
    • (2007) Transactions of ASME Journal of Mechanical Design , vol.129 , Issue.2 , pp. 150-157
    • Abdelsalam, H.M.E.1    Bao, H.P.2
  • 30
    • 0026837875 scopus 로고
    • Practical use of distributions in network analysis
    • T. Williams Practical use of distributions in network analysis Journal of Operation Research Society 43 3 1992 265 270
    • (1992) Journal of Operation Research Society , vol.43 , Issue.3 , pp. 265-270
    • Williams, T.1
  • 31
    • 0033676587 scopus 로고    scopus 로고
    • 'Signposting', a parameter-driven task-based model of the design process
    • P.J. Clarkson, and J.R. Hamilton 'Signposting', a parameter-driven task-based model of the design process Research in Engineering Design 12 1 2000 18 38
    • (2000) Research in Engineering Design , vol.12 , Issue.1 , pp. 18-38
    • Clarkson, P.J.1    Hamilton, J.R.2
  • 32
    • 70449434719 scopus 로고    scopus 로고
    • An adaptive process model to support product development project management
    • V. Levardy, and T.R. Browning An adaptive process model to support product development project management IEEE Transaction on Engineering Management 56 4 2009 600 620
    • (2009) IEEE Transaction on Engineering Management , vol.56 , Issue.4 , pp. 600-620
    • Levardy, V.1    Browning, T.R.2
  • 33
    • 78650621974 scopus 로고    scopus 로고
    • Process template based flexible resource integration for product innovative reuse design
    • Y.L. Li, and W. Zhao Process template based flexible resource integration for product innovative reuse design International Journal of Computer Integrated Manufacturing 24 1 2011 53 73
    • (2011) International Journal of Computer Integrated Manufacturing , vol.24 , Issue.1 , pp. 53-73
    • Li, Y.L.1    Zhao, W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.