메뉴 건너뛰기




Volumn 53, Issue 2, 2006, Pages 312-322

Electric power generation planning for interrelated projects: A real options approach

Author keywords

Dynamic programming; Electric power; Generation planning; Lattice process; Project interrelation; Real options; Strategic decision

Indexed keywords

DECISION MAKING; DYNAMIC PROGRAMMING; ECONOMICS; ELECTRIC POWER GENERATION; ELECTRIC POWER SYSTEMS; PROJECT MANAGEMENT;

EID: 33646047398     PISSN: 00189391     EISSN: None     Source Type: Journal    
DOI: 10.1109/TEM.2006.872249     Document Type: Article
Times cited : (41)

References (25)
  • 1
    • 0022025492 scopus 로고
    • "A generation expansion planning model for electric utilities"
    • J. C. Ammons and L. F. McGinnis, "A generation expansion planning model for electric utilities," Eng. Economist, vol. 30, pp. 205-225, 1985.
    • (1985) Eng. Economist , vol.30 , pp. 205-225
    • Ammons, J.C.1    McGinnis, L.F.2
  • 2
    • 18544388379 scopus 로고    scopus 로고
    • "Management of R&D projects under uncertainty: A multidimensional approach to managerial flexibility"
    • May
    • L. P. Santiago and T. G. Bifano, "Management of R&D projects under uncertainty: A multidimensional approach to managerial flexibility," IEEE Trans. Eng. Manage., vol. 52, no. 2, pp. 269-280, May 2005.
    • (2005) IEEE Trans. Eng. Manage. , vol.52 , Issue.2 , pp. 269-280
    • Santiago, L.P.1    Bifano, T.G.2
  • 3
    • 13844275988 scopus 로고    scopus 로고
    • "Technology competition and optimal investment timing: A real options perspective"
    • Feb
    • R. J. Kauffman and X. Li, "Technology competition and optimal investment timing: A real options perspective," IEEE Trans. Eng. Manage., vol. 52, no. 1, pp. 15-29, Feb. 2005.
    • (2005) IEEE Trans. Eng. Manage. , vol.52 , Issue.1 , pp. 15-29
    • Kauffman, R.J.1    Li, X.2
  • 4
    • 18544365530 scopus 로고    scopus 로고
    • "Adapting real options to new product development by modeling the second Toyota paradox"
    • May
    • D. N. Ford and D. K. Sobek II, "Adapting real options to new product development by modeling the second Toyota paradox," IEEE Trans. Eng. Manage., vol. 52, no. 2, pp. 175-185, May 2005.
    • (2005) IEEE Trans. Eng. Manage. , vol.52 , Issue.2 , pp. 175-185
    • Ford, D.N.1    Sobek II, D.K.2
  • 5
    • 0000576599 scopus 로고
    • "An option valuation analysis of investment choices by a regulated firm"
    • E. O. Teisberg, "An option valuation analysis of investment choices by a regulated firm," Manage. Sci., vol. 40, pp. 535-548, 1994.
    • (1994) Manage. Sci. , vol.40 , pp. 535-548
    • Teisberg, E.O.1
  • 6
    • 13944282202 scopus 로고    scopus 로고
    • "Optimal investments in power generation under centralized and decentralized decision making"
    • A. Botterrud, M. D. Ilic, and I. Wangensteen, "Optimal investments in power generation under centralized and decentralized decision making," IEEE Trans. Power Syst., vol. 20, no. 1, pp. 254-263, 2005.
    • (2005) IEEE Trans. Power Syst. , vol.20 , Issue.1 , pp. 254-263
    • Botterrud, A.1    Ilic, M.D.2    Wangensteen, I.3
  • 7
    • 4944240403 scopus 로고    scopus 로고
    • "Option pricing: Valuation models and applications"
    • M. Broadie and J. B. Detemple, "Option pricing: Valuation models and applications," Manage. Sci., vol. 50, no. 9, pp. 1145-1177, 2004.
    • (2004) Manage. Sci. , vol.50 , Issue.9 , pp. 1145-1177
    • Broadie, M.1    Detemple, J.B.2
  • 8
    • 0033207561 scopus 로고    scopus 로고
    • "Dynamic R&D investment policies"
    • P. D. Childs and A. J. Triantis, "Dynamic R&D investment policies," Manage. Sci., vol. 45, pp. 1359-1377, 1999.
    • (1999) Manage. Sci. , vol.45 , pp. 1359-1377
    • Childs, P.D.1    Triantis, A.J.2
  • 9
    • 0038492371 scopus 로고    scopus 로고
    • "Generation planning for interrelated generation units: A real options approach"
    • K. J. Min and C. H. Wang, "Generation planning for interrelated generation units: A real options approach," in Proc. IEEE Power Engineering Soc. Summer Meeting, 2000, pp. 2261-2265.
    • (2000) Proc. IEEE Power Engineering Soc. Summer Meeting , pp. 2261-2265
    • Min, K.J.1    Wang, C.H.2
  • 10
    • 0036508482 scopus 로고    scopus 로고
    • "Short-term generation asset valuation: A real options approach"
    • C. L. Tseng and G. Barz, "Short-term generation asset valuation: A real options approach," Oper. Res., vol. 50, pp. 297-310, 2002.
    • (2002) Oper. Res. , vol.50 , pp. 297-310
    • Tseng, C.L.1    Barz, G.2
  • 11
    • 0000281418 scopus 로고
    • "Irreversibility, uncertainty, and investment"
    • R. S. Pindyck, "Irreversibility, uncertainty, and investment," J. Economic Literature, vol. XXIX, pp. 1110-1148, 1991.
    • (1991) J. Economic Literature , vol.29 , pp. 1110-1148
    • Pindyck, R.S.1
  • 12
    • 38249037059 scopus 로고
    • "Time to build, option value, and investment decisions"
    • S. Majd and R. S. Pindyck, "Time to build, option value, and investment decisions," J. Financial Econom., vol. 18, pp. 7-27, 1987.
    • (1987) J. Financial Econom. , vol.18 , pp. 7-27
    • Majd, S.1    Pindyck, R.S.2
  • 13
    • 0035269003 scopus 로고    scopus 로고
    • "Capital budgeting under uncertainty - An integrated approach using contingent claims analysis and integer programming"
    • H. Meier, N. Christofides, and G. Salkin, "Capital budgeting under uncertainty - An integrated approach using contingent claims analysis and integer programming," Oper. Res., vol. 49, pp. 196-206, 2001.
    • (2001) Oper. Res. , vol.49 , pp. 196-206
    • Meier, H.1    Christofides, N.2    Salkin, G.3
  • 15
    • 0032070191 scopus 로고    scopus 로고
    • "Production, operating risk and market uncertainty: A valuation perspective on controlled policies"
    • B. Kamrad and S. Lele, "Production, operating risk and market uncertainty: A valuation perspective on controlled policies," IIE Trans., vol. 30, pp. 455-468, 1998.
    • (1998) IIE Trans. , vol.30 , pp. 455-468
    • Kamrad, B.1    Lele, S.2
  • 16
    • 0002177196 scopus 로고
    • "Numerical procedures for implementing term structure models II: Two-factor models"
    • J. Hull and A. White, "Numerical procedures for implementing term structure models II: Two-factor models," J. Derivatives, pp. 37-48, 1994.
    • (1994) J. Derivatives , pp. 37-48
    • Hull, J.1    White, A.2
  • 17
    • 33646047202 scopus 로고    scopus 로고
    • "Did power plant buyers pay too much"
    • Nov
    • A. Holland, "Did power plant buyers pay too much," Public Utilities Fortnightly, pp. 26-36, Nov. 1999.
    • (1999) Public Utilities Fortnightly , pp. 26-36
    • Holland, A.1
  • 18
    • 33646068141 scopus 로고    scopus 로고
    • "Financial players and load-serving utilities are looking for power asset deals"
    • Feb
    • D. Haarmeyer, M. Griffith, and G. Thain, "Financial players and load-serving utilities are looking for power asset deals," Public Utilities Fortnightly, pp. 47-50, Feb. 2004.
    • (2004) Public Utilities Fortnightly , pp. 47-50
    • Haarmeyer, D.1    Griffith, M.2    Thain, G.3
  • 19
    • 0029306371 scopus 로고
    • "A lattice claims model for capital budgeting"
    • May
    • B. Kamrad, "A lattice claims model for capital budgeting," IEEE Trans. Eng. Manage., vol. 42, no. 2, pp. 140-149, May 1995.
    • (1995) IEEE Trans. Eng. Manage. , vol.42 , Issue.2 , pp. 140-149
    • Kamrad, B.1
  • 20
  • 21
    • 0000532793 scopus 로고
    • "Numerical evaluation of multivariate contingent claims"
    • P. P. Boyle, J. Evnine, and S. Gibbs, "Numerical evaluation of multivariate contingent claims," Rev. Financial Studies, vol. 2, pp. 241-250, 1989.
    • (1989) Rev. Financial Studies , vol.2 , pp. 241-250
    • Boyle, P.P.1    Evnine, J.2    Gibbs, S.3
  • 25
    • 0000980885 scopus 로고
    • "Multinomial approximating models for options with k state variables"
    • B. Kamrad and P. Ritchken, "Multinomial approximating models for options with k state variables," Manage. Sci., vol. 37, pp. 1640-1652, 1991.
    • (1991) Manage. Sci. , vol.37 , pp. 1640-1652
    • Kamrad, B.1    Ritchken, P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.