-
1
-
-
55549099953
-
Partially and fully constrained ant algorithms for the optimal solution of large scale reservoir operation problems
-
WRMAEJ, 0920-4741, 10.1007/s11269-008-9256-6.
-
Afshar M.H. Moeini R. Partially and fully constrained ant algorithms for the optimal solution of large scale reservoir operation problems. Water Resour. Manage. 2008, 22(12):1835-1857. WRMAEJ, 0920-4741, 10.1007/s11269-008-9256-6.
-
(2008)
Water Resour. Manage.
, vol.22
, Issue.12
, pp. 1835-1857
-
-
Afshar, M.H.1
Moeini, R.2
-
2
-
-
0022525962
-
Dynamic programming in hydropower scheduling
-
JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(1986)112:3(339).
-
Allen R.B. Bridgeman S.G. Dynamic programming in hydropower scheduling. J. Water Resour. Plann. Manage. 1986, 112(3):339-353. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(1986)112:3(339).
-
(1986)
J. Water Resour. Plann. Manage.
, vol.112
, Issue.3
, pp. 339-353
-
-
Allen, R.B.1
Bridgeman, S.G.2
-
3
-
-
0037687647
-
Optimization of large-scale hydropower system operations
-
JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2003)129:3(178).
-
Barros M.T. L. Tsai F.T.-C. Yang S.-L. Lopes J.E. G. Yeh W.W.-G. Optimization of large-scale hydropower system operations. J. Water Resour. Plann. Manage. 2003, 129(3):178-188. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2003)129:3(178).
-
(2003)
J. Water Resour. Plann. Manage.
, vol.129
, Issue.3
, pp. 178-188
-
-
Barros, M.T.L.1
Tsai, F.T.-C.2
Yang, S.-L.3
Lopes, J.E.G.4
Yeh, W.W.-G.5
-
4
-
-
49249094152
-
An MILP approach for short-term hydro scheduling and unit commitment with head-dependent reservoir
-
ITPSEG, 0885-8950, 10.1109/TPWRS.2008.926704.
-
Borghetti A. Ambrosio C.D. An MILP approach for short-term hydro scheduling and unit commitment with head-dependent reservoir. IEEE Trans. Power Syst. 2008, 23(3):1115-1124. ITPSEG, 0885-8950, 10.1109/TPWRS.2008.926704.
-
(2008)
IEEE Trans. Power Syst.
, vol.23
, Issue.3
, pp. 1115-1124
-
-
Borghetti, A.1
Ambrosio, C.D.2
-
5
-
-
0035367618
-
Solving nonlinear water management models using a combined genetic algorithm and linear programming approach
-
AWREDI, 0309-1708, 10.1016/S0309-1708(00)00069-5.
-
Cai X. McKinney D.C. Lasdon L.S. Solving nonlinear water management models using combined genetic algorithm and linear programming approach. Adv. Water Resour. 2001, 24(6):667-676. AWREDI, 0309-1708, 10.1016/S0309-1708(00)00069-5.
-
(2001)
Adv. Water Resour.
, vol.24
, Issue.6
, pp. 667-676
-
-
Cai, X.1
McKinney, D.C.2
Lasdon, L.S.3
-
6
-
-
0035507082
-
Experiences with mixed integer linear programming based approaches on short-term hydro scheduling
-
ITPSEG, 0885-8950, 10.1109/59.962421.
-
Chang G.W. Experiences with mixed integer linear programming based approaches on short-term hydro scheduling. IEEE Trans. Power Syst. 2001, 16(4):743-749. ITPSEG, 0885-8950, 10.1109/59.962421.
-
(2001)
IEEE Trans. Power Syst.
, vol.16
, Issue.4
, pp. 743-749
-
-
Chang, G.W.1
-
7
-
-
0036872146
-
Self-scheduling of a hydro producer in a pool-based electricity market
-
ITPSEG, 0885-8950, 10.1109/TPWRS.2002.804951.
-
Conejo A.J. Arroyo J.M. Contreras J. Villamor F.A. Self-scheduling of hydro producer in pool-based electricity market. IEEE Trans. Power Syst. 2002, 17(4):1265-1272. ITPSEG, 0885-8950, 10.1109/TPWRS.2002.804951.
-
(2002)
IEEE Trans. Power Syst.
, vol.17
, Issue.4
, pp. 1265-1272
-
-
Conejo, A.J.1
Arroyo, J.M.2
Contreras, J.3
Villamor, F.A.4
-
8
-
-
0028425029
-
A network flow model for short-term hydro-dominated hydrothermal scheduling problems
-
ITPSEG, 0885-8950, 10.1109/59.317642.
-
Franco P.E. C. Carvalho M.F. Soares S. network flow model for short-term hydro-dominated hydrothermal scheduling problems. IEEE Trans. Power Syst. 1994, 9(2):1016-1022. ITPSEG, 0885-8950, 10.1109/59.317642.
-
(1994)
IEEE Trans. Power Syst.
, vol.9
, Issue.2
, pp. 1016-1022
-
-
Franco, P.E.C.1
Carvalho, M.F.2
Soares, S.3
-
9
-
-
57649181867
-
Short-term hydropower optimal scheduling of multireservoir system using a decomposition approach
-
IEEE, Jinan, China.
-
Liu S. Wang J. Liu Z. Short-term hydropower optimal scheduling of multireservoir system using decomposition approach. 4th Int. Conf. on Natural Computation 2008, 6:565-570. IEEE, Jinan, China.
-
(2008)
4th Int. Conf. on Natural Computation
, vol.6
, pp. 565-570
-
-
Liu, S.1
Wang, J.2
Liu, Z.3
-
10
-
-
0029105187
-
Optimal reservoir control for hydropower on Colorado River, Texas
-
JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(1995)121:6(438).
-
Martin Q.W. Optimal reservoir control for hydropower on Colorado River, Texas. J. Water Resour. Plann. Manage. 1995, 121(6):438-446. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(1995)121:6(438).
-
(1995)
J. Water Resour. Plann. Manage.
, vol.121
, Issue.6
, pp. 438-446
-
-
Martin, Q.W.1
-
11
-
-
0036778841
-
Short term hydro scheduling using two-phase neural network
-
IEPSDC, 0142-0615, 10.1016/S0142-0615(01)00069-2.
-
Naresh R. Sharma J. Short term hydro scheduling using two-phase neural network. Electr. Pow Energy Syst. 2002, 24(7):583-590. IEPSDC, 0142-0615, 10.1016/S0142-0615(01)00069-2.
-
(2002)
Electr. Pow Energy Syst.
, vol.24
, Issue.7
, pp. 583-590
-
-
Naresh, R.1
Sharma, J.2
-
12
-
-
0028428070
-
Optimal short-term scheduling for a large-scale cascaded hydro system
-
ITPSEG, 0885-8950, 10.1109/59.317636.
-
Piekutowski M.R. Litwinowicz T. Frowd R.J. Optimal short-term scheduling for large-scale cascaded hydro system. IEEE Trans. Power Syst. 1994, 9(2):805-811. ITPSEG, 0885-8950, 10.1109/59.317636.
-
(1994)
IEEE Trans. Power Syst.
, vol.9
, Issue.2
, pp. 805-811
-
-
Piekutowski, M.R.1
Litwinowicz, T.2
Frowd, R.J.3
-
13
-
-
0034243270
-
The, B. C. Hydro short term hydro scheduling optimization model
-
ITPSEG, 0885-8950, 10.1109/59.871743.
-
Shawwash Z.K. Siu T.K. Russel S.O. D. The, B. C. Hydro short term hydro scheduling optimization model. IEEE Trans. Power Syst. 2000, 15(3):1125-1131. ITPSEG, 0885-8950, 10.1109/59.871743.
-
(2000)
IEEE Trans. Power Syst.
, vol.15
, Issue.3
, pp. 1125-1131
-
-
Shawwash, Z.K.1
Siu, T.K.2
Russel, S.O.D.3
-
14
-
-
0034161326
-
Short-term operation model for coupled hydropower reservoirs
-
JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2000)126:2(98).
-
Teegavarapu R.S. V. Simonovic S.P. Short-term operation model for coupled hydropower reservoirs. J. Water Resour. Plann. Manage. 2000, 126(2):98-105. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2000)126:2(98).
-
(2000)
J. Water Resour. Plann. Manage.
, vol.126
, Issue.2
, pp. 98-105
-
-
Teegavarapu, R.S.V.1
Simonovic, S.P.2
-
15
-
-
0036826262
-
Optimal operation of reservoir systems using simulated annealing
-
WRMAEJ, 0920-4741, 10.1023/A:1021993222371.
-
Teegavarapu R.S. V. Simonovic S.P. Optimal operation of reservoir systems using simulated annealing. Water Resour. Manage. 2002, 16(5):401-428. WRMAEJ, 0920-4741, 10.1023/A:1021993222371.
-
(2002)
Water Resour. Manage.
, vol.16
, Issue.5
, pp. 401-428
-
-
Teegavarapu, R.S.V.1
Simonovic, S.P.2
-
16
-
-
0030286795
-
A coordinated approach for real-time short term hydro scheduling
-
ITPSEG, 0885-8950, 10.1109/59.544630.
-
Tufegdzic N. Frowd R.J. Stadlin W.O. coordinated approach for real-time short term hydro scheduling. IEEE Trans. Power Syst. 1996, 11(4):1698-1704. ITPSEG, 0885-8950, 10.1109/59.544630.
-
(1996)
IEEE Trans. Power Syst.
, vol.11
, Issue.4
, pp. 1698-1704
-
-
Tufegdzic, N.1
Frowd, R.J.2
Stadlin, W.O.3
-
17
-
-
61449143284
-
Simplex-like method and its applications to short-term generation scheduling of hydro systems
-
Ph.D. thesis, Huazhong Univ. of Science and Technology, Wuhan, China.
-
Wang J. Simplex-like method and its applications to short-term generation scheduling of hydro systems. 2003 Ph.D. thesis, Huazhong Univ. of Science and Technology, Wuhan, China.
-
(2003)
-
-
Wang, J.1
-
18
-
-
77249130724
-
A new stochastic control approach to multireservoir operation problem with uncertain forecasts
-
WRERAQ, 0043-1397, 10.1029/2008WR007217
-
Wang J. new stochastic control approach to multireservoir operation problem with uncertain forecasts. Water Resour. Res. 2010, 46(2):W02504. WRERAQ, 0043-1397, 10.1029/2008WR007217.
-
(2010)
Water Resour. Res.
, vol.46
, Issue.2
-
-
Wang, J.1
-
19
-
-
2342526058
-
Short-term scheduling of large-scale hydropower systems for energy maximization
-
JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2004)130:3(198)..
-
Wang J. Yuan X. Zhang Y. Short-term scheduling of large-scale hydropower systems for energy maximization. J. Water Resour. Plann. Manage. 2004, 130(3):198-205. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2004)130:3(198) ..
-
(2004)
J. Water Resour. Plann. Manage.
, vol.130
, Issue.3
, pp. 198-205
-
-
Wang, J.1
Yuan, X.2
Zhang, Y.3
-
20
-
-
0141744797
-
Dynamic optimal unit commitment and loading in hydropower systems
-
JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2003)129:5(388).
-
Yi J. Labadie J.W. Stitt S. Dynamic optimal unit commitment and loading in hydropower systems. J. Water Resour. Plann. Manage. 2003, 129(5):388-398. JWRMD5, 0733-9496, 10.1061/(ASCE)0733-9496(2003)129:5(388).
-
(2003)
J. Water Resour. Plann. Manage.
, vol.129
, Issue.5
, pp. 388-398
-
-
Yi, J.1
Labadie, J.W.2
Stitt, S.3
|