-
1
-
-
0001247217
-
What is lean construction
-
University of California, Berkeley, CA, USA, July 26-28
-
th Annual Conference of the International Group for Lean Construction, IGLC-7, University of California, Berkeley, CA, USA, July 26-28, 1-10.
-
(1999)
th Annual Conference of the International Group for Lean Construction, IGLC-7
, pp. 1-10
-
-
Howell, G.A.1
-
2
-
-
33847222202
-
Assessing research issues in Automated Project Performance
-
Navon, R. and Sacks, R. (2007) Assessing research issues in Automated Project Performance, Automation in Construction, Vol. 16, Iss. 4, 474-484.
-
(2007)
Automation in Construction
, vol.16
, Issue.4
, pp. 474-484
-
-
Navon, R.1
Sacks, R.2
-
3
-
-
14544283775
-
Report of the NIST workshop on data exchange standards at the construction job site
-
September 21-25, Eindhoven, The Netherlands
-
th International Symposium on Automation and Robotics in Construction (ISARC), September 21-25, Eindhoven, The Netherlands, 612-622.
-
(2003)
th International Symposium on Automation and Robotics in Construction (ISARC)
, pp. 612-622
-
-
Saidi, K.1
Lytle, A.2
Stone, C.W.3
-
4
-
-
33845966046
-
Research in automated measurement of project performance indicators
-
DOI 10.1016/j.autcon.2006.03.003, PII S0926580506000136
-
Navon R. (2007) Research in automated measurement of project performance indicators, Journal of Automation in Construction, Vol. 16, Iss. 2, 176-188. (Pubitemid 46053760)
-
(2007)
Automation in Construction
, vol.16
, Issue.2
, pp. 176-188
-
-
Navon, R.1
-
5
-
-
63049083431
-
Field trial of automated material tracking in construction
-
Québec, QC, Canada, June 10-13 submitted
-
Razavi, S. N., Young, D. A., Nasir, H., Haas C. T., Caldas C. H., Goodrum, P., and Murray, P. (2008) Field Trial of Automated Material Tracking in Construction, CSCE 2008 Annual Conference, Québec, QC, Canada, June 10-13 submitted.
-
(2008)
CSCE 2008 Annual Conference
-
-
Razavi, S.N.1
Young, D.A.2
Nasir, H.3
Haas, C.T.4
Caldas, C.H.5
Goodrum, P.6
Murray, P.7
-
6
-
-
0037332784
-
Monitoring labor inputs: Automated-data-collection model and enabling technologies
-
DOI 10.1016/S0926-5805(02)00043-2, PII S0926580502000432
-
Navon R. and Goldschmidt, E. (2002) Monitoring labor inputs: automated-data-collection model and enabling technologies, Journal of Automation in Construction, Vol. 12, Iss. 2, 185-199. (Pubitemid 35349801)
-
(2003)
Automation in Construction
, vol.12
, Issue.2
, pp. 185-199
-
-
Navon, R.1
Goldschmidt, E.2
-
7
-
-
37249050826
-
Shape-based retrieval of construction site photographs
-
DOI 10.1061/(ASCE)0887-3801(2008)22:1(14)
-
Brilakis, I. and Soibelman, L. (2008) Shape-Based Retrieval of Construction Site Photographs, Journal of Computing in Civil Engineering, American Society of Civil Engineers, Vol. 22, Iss. 1, 14-20 (Pubitemid 350265398)
-
(2008)
Journal of Computing in Civil Engineering
, vol.22
, Issue.1
, pp. 14-20
-
-
Brilakis, I.K.1
Soibelman, L.2
-
8
-
-
13944250699
-
Design of piezoresistive MEMS-based accelerometer for integration with wireless sensing unit for structural monitoring
-
DOI 10.1061/(ASCE)0893-1321(2003)16:3(108)
-
Lynch, J. P., Partridge, A., Law, K. H., Kenny, T. W., Kiremidjian, A. S. and Carryer E. (2003) Design of Piezoresistive MEMS-Based Accelerometer for Integration with Wireless Sensing Unit for Structural Monitoring, Journal of Aerospace Engineering, Vol. 16, Iss. 3, 108-114. (Pubitemid 40265221)
-
(2003)
Journal of Aerospace Engineering
, vol.16
, Issue.3
, pp. 108-114
-
-
Lynch, J.P.1
Partridge, A.2
Law, K.H.3
Kenny, T.W.4
Kiremidjian, A.S.5
Carryer, E.6
-
9
-
-
38649103110
-
Automated retrieval of 3D CAD model objects in construction range images
-
DOI 10.1016/j.autcon.2007.09.001, PII S0926580507001148
-
Bosche, F. and Haas, C. T. (2008) Automated Retrieval of 3D CAD Model Objects in Construction Range Images, Journal of Automation in Construction, Vol. 17, Iss. 4, 499-512. (Pubitemid 351173673)
-
(2008)
Automation in Construction
, vol.17
, Issue.4
, pp. 499-512
-
-
Bosche, F.1
Haas, C.T.2
-
10
-
-
63049114208
-
Performance of a new approach for automated 3D project performance tracking
-
submitted
-
Bosche, F., Haas, C. T. and Akinci, B. (2008) Performance of a New Approach for Automated 3D Project Performance Tracking, ASCE Journal of Computing in Civil Engineering, Special Issue on 3D Visualization, submitted.
-
(2008)
ASCE Journal of Computing in Civil Engineering, Special Issue on 3D Visualization
-
-
Bosche, F.1
Haas, C.T.2
Akinci, B.3
-
11
-
-
27644553296
-
Monitoring construction equipment for automated project performance control
-
National Institute of Standards and Technology, Gaithersburg, MD, USA, September 23-25
-
th International Symposium on Automation and Robotics in Construction (ISARC), National Institute of Standards and Technology, Gaithersburg, MD, USA, September 23-25, 161-166.
-
(2002)
th International Symposium on Automation and Robotics in Construction (ISARC)
, pp. 161-166
-
-
Sacks, R.1
Navon, R.2
Shapira, A.3
Brodetsky, I.4
-
12
-
-
0347411213
-
Fitting range data to primitives for rapid local 3D modeling using sparse range point clouds
-
Kwon, S.-W., Bosche, F., Kim, C., Haas, C. T. and Liapi, K. A. (2004) Fitting Range Data to Primitives for Rapid Local 3D Modeling Using Sparse Range Point Clouds, Journal of Automation in Construction, Vol. 13, Iss. 1, 67-81.
-
(2004)
Journal of Automation in Construction
, vol.13
, Issue.1
, pp. 67-81
-
-
Kwon, S.-W.1
Bosche, F.2
Kim, C.3
Haas, C.T.4
Liapi, K.A.5
|