메뉴 건너뛰기




Volumn 36, Issue 4, 2012, Pages 471-480

Quality self-control and co-supervision mechanism of construction agent in public investment project in China

Author keywords

Agent construction system; China; Public investment project; Quality supervision; Rough set; Self control system

Indexed keywords

GOVERNMENT; INVESTMENT; NATIONAL ECONOMY; PROJECT MANAGEMENT; QUALITY CONTROL;

EID: 84862891361     PISSN: 01973975     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.habitatint.2012.05.002     Document Type: Article
Times cited : (18)

References (23)
  • 1
    • 33751180559 scopus 로고    scopus 로고
    • Development of quality matrix to measure the effectiveness of quality management systems in Turkish construction industry
    • Ahmet O., Serra S.G., Mehmet T. Development of quality matrix to measure the effectiveness of quality management systems in Turkish construction industry. Building and Environment 2007, 42(3):1219-1228.
    • (2007) Building and Environment , vol.42 , Issue.3 , pp. 1219-1228
    • Ahmet, O.1    Serra, S.G.2    Mehmet, T.3
  • 2
    • 0347269132 scopus 로고    scopus 로고
    • A process-based quality management information system
    • Chin S., Kim K., Kim Y.S. A process-based quality management information system. Automation in Construction 2004, 13(2):241-259.
    • (2004) Automation in Construction , vol.13 , Issue.2 , pp. 241-259
    • Chin, S.1    Kim, K.2    Kim, Y.S.3
  • 5
    • 85006089429 scopus 로고    scopus 로고
    • Process evaluation of construction project based on dominance rough set approach
    • Jian L.R., Tang X.W., Liu S.F., Fang Z.G. Process evaluation of construction project based on dominance rough set approach. Journal of Systems & Management 2009, 18(5):577-582.
    • (2009) Journal of Systems & Management , vol.18 , Issue.5 , pp. 577-582
    • Jian, L.R.1    Tang, X.W.2    Liu, S.F.3    Fang, Z.G.4
  • 6
    • 48549088841 scopus 로고    scopus 로고
    • A study on owner's project delivery system and innovation of agent-construction institution
    • (in Chinese)
    • Lan D.J., Li S.R., He W.Z. A study on owner's project delivery system and innovation of agent-construction institution. China Civil Engineering Journal 2008, 41(7):82-86. (in Chinese).
    • (2008) China Civil Engineering Journal , vol.41 , Issue.7 , pp. 82-86
    • Lan, D.J.1    Li, S.R.2    He, W.Z.3
  • 7
    • 2442471669 scopus 로고    scopus 로고
    • How project managers can better control the performance of design-build projects
    • Ling F.Y.Y. How project managers can better control the performance of design-build projects. International Journal of Project Management 2004, 22(6):477-488.
    • (2004) International Journal of Project Management , vol.22 , Issue.6 , pp. 477-488
    • Ling, F.Y.Y.1
  • 8
    • 33747036725 scopus 로고    scopus 로고
    • Credit assessment of contractors: a rough set method
    • Liu G.J., Zhu Y. Credit assessment of contractors: a rough set method. Tsinghua Science and Technology 2006, 11(3):357-362.
    • (2006) Tsinghua Science and Technology , vol.11 , Issue.3 , pp. 357-362
    • Liu, G.J.1    Zhu, Y.2
  • 9
    • 84055213084 scopus 로고    scopus 로고
    • Feasibility evaluation for wind power generation based on rough set theory
    • Niu D.X., Fang F., Zhou K., Liu J.P. Feasibility evaluation for wind power generation based on rough set theory. Procedia Engineering 2011, 15:5046-5050.
    • (2011) Procedia Engineering , vol.15 , pp. 5046-5050
    • Niu, D.X.1    Fang, F.2    Zhou, K.3    Liu, J.P.4
  • 10
    • 0001035369 scopus 로고    scopus 로고
    • Mechanisms of governance in the project-based organization roles of the broker and steward
    • Turner J.R., Keegan A. Mechanisms of governance in the project-based organization roles of the broker and steward. European Management Journal 2001, 19(3):254-267.
    • (2001) European Management Journal , vol.19 , Issue.3 , pp. 254-267
    • Turner, J.R.1    Keegan, A.2
  • 11
    • 0035576569 scopus 로고    scopus 로고
    • Governing the project process a conceptual framework
    • Winch G.M. Governing the project process a conceptual framework. Construction Management and Economics 2001, 19(8):799-808.
    • (2001) Construction Management and Economics , vol.19 , Issue.8 , pp. 799-808
    • Winch, G.M.1
  • 14
    • 84862871813 scopus 로고    scopus 로고
    • Quality evaluation of the project construction process
    • (in Chinese)
    • Xiao Y., Cai M.Q. Quality evaluation of the project construction process. China Harbour Engineering 2005, 3:53-58. (in Chinese).
    • (2005) China Harbour Engineering , vol.3 , pp. 53-58
    • Xiao, Y.1    Cai, M.Q.2
  • 15
    • 77953871904 scopus 로고    scopus 로고
    • Dynamic risk management in petroleum project investment based on a variable precision rough set model
    • Xie G., Yue W.Y., Wang S.Y., Lai K.K. Dynamic risk management in petroleum project investment based on a variable precision rough set model. Technological Forecasting & Social Change 2010, 77:891-901.
    • (2010) Technological Forecasting & Social Change , vol.77 , pp. 891-901
    • Xie, G.1    Yue, W.Y.2    Wang, S.Y.3    Lai, K.K.4
  • 17
    • 84862851148 scopus 로고    scopus 로고
    • The group decision-making rules based on rough sets on large scare engineering emergency
    • Xiong W., Su Q.Y., Li J.L. The group decision-making rules based on rough sets on large scare engineering emergency. Systems Engineering Procedia 2012, 4:331-337.
    • (2012) Systems Engineering Procedia , vol.4 , pp. 331-337
    • Xiong, W.1    Su, Q.Y.2    Li, J.L.3
  • 18
    • 34347259136 scopus 로고    scopus 로고
    • The research of agent construction model of public investment projects
    • (in Chinese)
    • Xu Y. The research of agent construction model of public investment projects. Construction Economy 2004, 6:15-18. (in Chinese).
    • (2004) Construction Economy , vol.6 , pp. 15-18
    • Xu, Y.1
  • 20
    • 77949516395 scopus 로고    scopus 로고
    • Research frame for incentive mechanism of the construction agent in public investment project: from the perspective of project governance.
    • 2009 IEEE International Conference on Industrial Engineering and Engineering Management
    • Yan, L., Yang, L. G. & Zhao, H. (2009). Research frame for incentive mechanism of the construction agent in public investment project: from the perspective of project governance. 2009 IEEE International Conference on Industrial Engineering and Engineering Management, 1513-1517.
    • (2009) , pp. 1513-1517
    • Yan, L.1    Yang, L.G.2    Zhao, H.3
  • 21
    • 77958122487 scopus 로고    scopus 로고
    • Current situation and problem analysis of agent construction system of public investment projects in China
    • (in Chinese)
    • Yan L., Zhou G.D. Current situation and problem analysis of agent construction system of public investment projects in China. Transactions of Beijing Institute of Technology 2009, 11(5):31-37. (in Chinese).
    • (2009) Transactions of Beijing Institute of Technology , vol.11 , Issue.5 , pp. 31-37
    • Yan, L.1    Zhou, G.D.2
  • 22
    • 84862845916 scopus 로고    scopus 로고
    • Principle and application of multi-level and comprehensive fuzzy evaluation method for quality of building engineering
    • (in Chinese)
    • Yang L., Jiang F., Pang L.F. Principle and application of multi-level and comprehensive fuzzy evaluation method for quality of building engineering. Journal of Water Resources and Architectural Engineering 2009, 1:87-89. (in Chinese).
    • (2009) Journal of Water Resources and Architectural Engineering , vol.1 , pp. 87-89
    • Yang, L.1    Jiang, F.2    Pang, L.F.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.