-
1
-
-
0004032661
-
-
3rd ed. Prentice Hall, Inc., Upper Saddle River, NJ.
-
Agresti, A.; Finlay, B. 1999. Statistical methods for the social sciences. 3rd ed. Prentice Hall, Inc., Upper Saddle River, NJ. 706 p.
-
(1999)
Statistical Methods for the Social Sciences
, pp. 706
-
-
Agresti, A.1
Finlay, B.2
-
2
-
-
77952943394
-
A new solution to restore productivity of gas wells with condensate and water blocks
-
Bang, V. S. S.; Pope, G.; Sharma, M. M.; Baran, J.; Ahmadi, M. 2010. A new solution to restore productivity of gas wells with condensate and water blocks, SPE Reservoir Evaluation & Engineering 13(2): 323-331. http://dx.doi.org/10.2118/116711-PA
-
(2010)
SPE Reservoir Evaluation & Engineering
, vol.13
, Issue.2
, pp. 323-331
-
-
Bang, V.S.S.1
Pope, G.2
Sharma, M.M.3
Baran, J.4
Ahmadi, M.5
-
3
-
-
74549178674
-
Are we more productive now? Analyzing change tasks to assess productivity trends during software evolution
-
9-10 May, 2009, Milan, Italy. INSTICC Press
-
Benestad, H. C.; Anda, B.; Arisholm, E. 2009. Are we more productive now? Analyzing change tasks to assess productivity trends during software evolution, in The 4th International Conference on Evaluation of Novel Approaches to Software Engineering (ENASE 2009), 9-10 May, 2009, Milan, Italy. INSTICC Press, 161-176.
-
(2009)
The 4th International Conference on Evaluation of Novel Approaches to Software Engineering (ENASE 2009)
, pp. 161-176
-
-
Benestad, H.C.1
Anda, B.2
Arisholm, E.3
-
4
-
-
0027883457
-
The productivity paradox of information technology: Review and assessment
-
Brynjolfsson, E. 1993. The productivity paradox of information technology: Review and assessment, Communications of the ACM36(12): 67-77.
-
(1993)
Communications of the ACM
, vol.36
, Issue.12
, pp. 67-77
-
-
Brynjolfsson, E.1
-
6
-
-
33646581663
-
System model for analyzing design productivity
-
Chang, A. S.; Ibbs, W. 2006. System model for analyzing design productivity, Journal of Management in Engineering ASCE 22(1): 27-34. http://dx.doi.org/10.1061/(ASCE) 0742-597X(2006)22:1(27)
-
(2006)
Journal of Management in Engineering ASCE
, vol.22
, Issue.1
, pp. 27-34
-
-
Chang, A.S.1
Ibbs, W.2
-
7
-
-
15844399634
-
-
Construction Industry Institute (CII). Austin: Construction Industry Institute, The University of Texas at Austin
-
Construction Industry Institute (CII). 2001. Engineering productivity measurement. RR156-11. Austin: Construction Industry Institute, The University of Texas at Austin. 356 p.
-
(2001)
Engineering Productivity Measurement. RR156-11
, pp. 356
-
-
-
8
-
-
84862876008
-
-
Construction Industry Institute (CII). Austin: Construction Industry Institute, The University of Texas at Austin
-
Construction Industry Institute (CII). 2004. Engineering productivity measurement II. RR192-11. Austin: Construction Industry Institute, The University of Texas at Austin. 27 p.
-
(2004)
Engineering Productivity Measurement II. RR192-11
, pp. 27
-
-
-
10
-
-
77950616563
-
An approach to measure value-based productivity in software projects
-
24-25 August, 2009, Jeju, Republic of Korea, IEEE Computer Society
-
De Aquino, G. S.; de Lemos Meira, S. R. 2009. An approach to measure value-based productivity in software projects, in The 9th International Conference on Quality Software (QSIC 2009), 24-25 August, 2009, Jeju, Republic of Korea. IEEE Computer Society, 383-389.
-
(2009)
The 9th International Conference on Quality Software (QSIC 2009)
, pp. 383-389
-
-
De Aquino, G.S.1
De Lemos Meira, S.R.2
-
11
-
-
32944455521
-
Measuring project level productivity on transportation projects
-
DOI 10.1061/(ASCE)0733-9364(2006)132:3(314)
-
Ellis, R. D.; Lee, S.-H. 2006. Measuring project level productivity on transportation projects, Journal of Construction Engineering and Management ASCE 132(3): 314-320. http://dx.doi.org/10.1061/(ASCE)0733-9364(2006)132:3(314) (Pubitemid 43260131)
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.3
, pp. 314-320
-
-
Ellis Jr., R.D.1
Lee, S.-H.2
-
12
-
-
77957964153
-
Squeeze related well productivity impairment mechanisms preventative/ remedial measures utilised: Norwegian continental shelf
-
26-27 May, 2010, Aberdeen, United Kingdom, Society of Petroleum Engineers
-
Fleming, N.; Ramstad, K.; Mathisen, A. M.; Selle, O. M.; Tjomsland, T.; Fadnes, F. H. 2010. Squeeze related well productivity impairment mechanisms preventative/ remedial measures utilised: Norwegian continental shelf, in The 10th SPE International Conference on Oilfield Scale 2010, 26-27 May, 2010, Aberdeen, United Kingdom. Society of Petroleum Engineers, 1-16.
-
(2010)
The 10th SPE International Conference on Oilfield Scale 2010
, pp. 1-16
-
-
Fleming, N.1
Ramstad, K.2
Mathisen, A.M.3
Selle, O.M.4
Tjomsland, T.5
Fadnes, F.H.6
-
13
-
-
27744590179
-
Impact of change's timing on labor productivity
-
DOI 10.1061/(ASCE)0733-9364(2005)131:11(1219)
-
Ibbs, W. 2005. Impact of change's timing on labor productivity, Journal of Construction Engineering and Management ASCE 131(11): 1219-1223. http://dx.doi.org/10.1061/(ASCE)0733-9364(2005)131:11(1219) (Pubitemid 41596029)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.11
, pp. 1219-1223
-
-
Ibbs, W.1
-
14
-
-
72949119579
-
A methodology to assess the costs and financial benefits of green buildings from an industry perspective
-
27-30 May, 2009, Canada Canadian Society for Civil Engineering, Canada
-
Issa, M. H.; Rankin, J. H.; Christian, A. J. 2009. A methodology to assess the costs and financial benefits of green buildings from an industry perspective, in The Canadian Society for Civil Engineering Annual Conference 2009, 27-30 May, 2009, Canada. Canadian Society for Civil Engineering, Canada, 1111-1120.
-
(2009)
The Canadian Society for Civil Engineering Annual Conference 2009
, pp. 1111-1120
-
-
Issa, M.H.1
Rankin, J.H.2
Christian, A.J.3
-
19
-
-
77954267971
-
Using the fuzzy method to evaluate manufacturing productivity
-
13-19 November, 2009, Lake Buena Vista, FL, United States, American Society of Mechanical Engineers
-
Niu, J.; Dartnall, J. 2010. Using the fuzzy method to evaluate manufacturing productivity, in The ASME International Mechanical Engineering Congress and Exposition (IMECE2009), 13-19 November, 2009, Lake Buena Vista, FL, United States. American Society of Mechanical Engineers, 115-121.
-
(2010)
The ASME International Mechanical Engineering Congress and Exposition (IMECE2009)
, pp. 115-121
-
-
Niu, J.1
Dartnall, J.2
-
20
-
-
77649321098
-
Productivity evaluation to Chinese agriculture based on SBM model
-
26-27 December, 2009, Xi'an, China, IEEE Computer Society
-
Ren, L. 2009. Productivity evaluation to Chinese agriculture based on SBM model, in The International Conference on Information Management, Innovation Management and Industrial Engineering (ICIII 2009), 26-27 December, 2009, Xi'an, China. IEEE Computer Society, 505-508.
-
(2009)
The International Conference on Information Management, Innovation Management and Industrial Engineering (ICIII 2009)
, pp. 505-508
-
-
Ren, L.1
-
21
-
-
77955517187
-
Comprehensive evaluation for construction performance in concurrent engineering environment
-
Shouke, C.; Zhuobin, W.; Jie, L. 2010. Comprehensive evaluation for construction performance in concurrent engineering environment, International Journal of Project Management 28(7): 708-718. http://dx.doi.org/10.1016/j. ijproman.2009.11.004
-
(2010)
International Journal of Project Management
, vol.28
, Issue.7
, pp. 708-718
-
-
Shouke, C.1
Zhuobin, W.2
Jie, L.3
-
23
-
-
14544298864
-
Quantifying engineering project scope for productivity modeling
-
DOI 10.1061/(ASCE)0733-9364(2005)131:3(360)
-
Song, L.; AbouRizk, S. M. 2005. Quantifying engineering project scope for productivity modeling, Journal of Construction Engineering and Management ASCE 131(3): 360- 367. http://dx.doi.org/10.1061/(ASCE)0733-9364(2005)131:3(360) (Pubitemid 40303944)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.3
, pp. 360-367
-
-
Song, L.1
AbouRizk, S.M.2
-
24
-
-
0005153711
-
Conceptual model for measuring productivity of design and engineering
-
Thomas, H. R.; Korte, Q. C.; Sanvido, V. E.; Parfitt, M. K. 1999. Conceptual model for measuring productivity of design and engineering, Journal of Architectural Engineering ASCE 5(1): 1-7. http://dx.doi.org/10.1061/(ASCE) 1076-0431(1999)5:1(1) (Pubitemid 129591172)
-
(1999)
Journal of Architectural Engineering
, vol.5
, Issue.1
, pp. 1-7
-
-
Thomas, H.R.1
Korte, Q.C.2
Sanvido, V.E.3
Parfitt, M.K.4
-
26
-
-
77949519770
-
A DEA evaluation of software project efficiency
-
8-11 December, 2009, Hong Kong, China. IEEE Computer Society
-
Yang, Z.; Paradi, J. C. 2009. A DEA evaluation of software project efficiency, in The IEEE International Conference on Industrial Engineering and Engineering Management (IEEM 2009), 8-11 December, 2009, Hong Kong, China. IEEE Computer Society, 1723-1727.
-
(2009)
The IEEE International Conference on Industrial Engineering and Engineering Management (IEEM 2009)
, pp. 1723-1727
-
-
Yang, Z.1
Paradi, J.C.2
|