-
1
-
-
0026251398
-
Model and optimization of multi-reservoir hydro-thermal power system for medium-term scheduling
-
in Chinese
-
Zuo Changchun, Chen Xueqing, Xiang Niande, et al. Model and optimization of multi-reservoir hydro-thermal power system for medium-term scheduling[J]. Proceedings of the CSEE, 1991, 11(6): 57-63(in Chinese).
-
(1991)
Proceedings of the CSEE
, vol.11
, Issue.6
, pp. 57-63
-
-
Zuo, C.1
Chen, X.2
Xiang, N.3
-
2
-
-
68349148324
-
Simulation of optimal medium-term hydro-thermal system operation by grid computing
-
Baslis C G, Papadakis S E, Bakirtzis A G. Simulation of optimal medium-term hydro-thermal system operation by grid computing[J]. IEEE Transactions on Power Systems, 2009, 24(3): 1208-1217.
-
(2009)
IEEE Transactions on Power Systems
, vol.24
, Issue.3
, pp. 1208-1217
-
-
Baslis, C.G.1
Papadakis, S.E.2
Bakirtzis, A.G.3
-
3
-
-
0037176348
-
Long-term optimal generation scheduling for the energy maximization of hydropower systems
-
in Chinese
-
Wang Jinwen, Dan Qi, Wu Yonggang, et al. Long-term optimal generation scheduling for the energy maximization of hydropower systems[J]. Automation of Electric Power Systems, 2002, 26(24): 22-2530(in Chinese).
-
(2002)
Automation of Electric Power Systems
, vol.26
, Issue.24
, pp. 22-2530
-
-
Wang, J.1
Dan, Q.2
Wu, Y.3
-
4
-
-
74849139562
-
Long-term optimization scheduling based on maximal storage energy exploitation of cascaded hydro-plant reservoirs
-
in Chinese
-
Guo Zhuangzhi, Wu Jiekang, Kong Fannie, et al. Long-term optimization scheduling based on maximal storage energy exploitation of cascaded hydro-plant reservoirs[J]. Proceedings of the CSEE, 2010, 30(1): 20-26(in Chinese).
-
(2010)
Proceedings of the CSEE
, vol.30
, Issue.1
, pp. 20-26
-
-
Guo, Z.1
Wu, J.2
Kong, F.3
-
5
-
-
0023454589
-
A new method of hydro thermal interconnected system economic operation
-
in Chinese
-
Bai Xiaomin, Li Chaoan, Yu Erkeng. A new method of hydro thermal interconnected system economic operation[J]. Proceedings of the CSEE, 1987, 7(6): 1-8(in Chinese).
-
(1987)
Proceedings of the CSEE
, vol.7
, Issue.6
, pp. 1-8
-
-
Bai, X.1
Li, C.2
Yu, E.3
-
6
-
-
0010414171
-
Long, medium and short-term energy management systems of large power systems
-
in Chinese
-
Chen Xueqing, Chen Gang, Zhang Wei, et al. Long, medium and short-term energy management systems of large power systems[J]. Proceedings of the CSEE, 1994, 14(6): 41-48(in Chinese).
-
(1994)
Proceedings of the CSEE
, vol.14
, Issue.6
, pp. 41-48
-
-
Chen, X.1
Chen, G.2
Zhang, W.3
-
7
-
-
77953266510
-
Optimal determination of long-term and mid-term contracts for a hydropower producer based on stochastic programming
-
in Chinese
-
Liu Hongling, Jiang Chuanwen, Zhang Yan. Optimal determination of long-term and mid-term contracts for a hydropower producer based on stochastic programming[J]. Proceedings of the CSEE, 2010, 30(13): 101-108(in Chinese).
-
(2010)
Proceedings of the CSEE
, vol.30
, Issue.13
, pp. 101-108
-
-
Liu, H.1
Jiang, C.2
Zhang, Y.3
-
8
-
-
0032203397
-
A dynamic programming two-stage algorithm for long-term hydrothermal scheduling of multireservoir systems
-
Ferrero R W, Rivera J F, Shahidehpour S M. A dynamic programming two-stage algorithm for long-term hydrothermal scheduling of multireservoir systems[J]. IEEE Transactions on Power Systems, 1998, 13(4): 1534-1540.
-
(1998)
IEEE Transactions on Power Systems
, vol.13
, Issue.4
, pp. 1534-1540
-
-
Ferrero, R.W.1
Rivera, J.F.2
Shahidehpour, S.M.3
-
9
-
-
0037292136
-
Optimal reliable operation of hydrothermal power systems with random unit outages
-
Amjady N, Farrokhzad D, Modarres M. Optimal reliable operation of hydrothermal power systems with random unit outages[J]. IEEE Transactions on Power Systems, 2003, 18(1): 279-289.
-
(2003)
IEEE Transactions on Power Systems
, vol.18
, Issue.1
, pp. 279-289
-
-
Amjady, N.1
Farrokhzad, D.2
Modarres, M.3
-
10
-
-
85009303101
-
Research on medium-term economic scheduling system for hydro-thermal power system
-
in Chinese
-
Zhang Wei, He Guangyu, Wang Zhen, et al. Research on medium-term economic scheduling system for hydro-thermal power system[J]. Power System Technology, 2002, 26(10): 6-9(in Chinese).
-
(2002)
Power System Technology
, vol.26
, Issue.10
, pp. 6-9
-
-
Zhang, W.1
He, G.2
Wang, Z.3
-
11
-
-
0035717451
-
The new method about electric power and energy balance
-
in Chinese
-
Pang Feng. The new method about electric power and energy balance[J]. Journal of Hydroelectric Engineering, 2001(4): 117-122(in Chinese).
-
(2001)
Journal of Hydroelectric Engineering
, Issue.4
, pp. 117-122
-
-
Pang, F.1
-
12
-
-
0033079912
-
A clipping-off interior-point technique for medium-term hydro-thermal coordination
-
Medina J, Quintana V H, Conejo A J. A clipping-off interior-point technique for medium-term hydro-thermal coordination[J]. IEEE Transactions on Power Systems, 1999, 14(1): 266-273.
-
(1999)
IEEE Transactions on Power Systems
, vol.14
, Issue.1
, pp. 266-273
-
-
Medina, J.1
Quintana, V.H.2
Conejo, A.J.3
-
13
-
-
18944383053
-
Medium term power planning with bilateral contracts
-
Shrestha G B, Pokharel B K, Lie T T, et al. Medium term power planning with bilateral contracts[J]. IEEE Transactions on Power Systems, 2005, 20(2): 627-633.
-
(2005)
IEEE Transactions on Power Systems
, vol.20
, Issue.2
, pp. 627-633
-
-
Shrestha, G.B.1
Pokharel, B.K.2
Lie, T.T.3
-
14
-
-
70350786570
-
On BFC-MSMIP strategies for scenario cluster partitioning, and twin node family branching selection and bounding for multistage stochastic mixed integer programming
-
Anon. On BFC-MSMIP strategies for scenario cluster partitioning, and twin node family branching selection and bounding for multistage stochastic mixed integer programming[J]. Computers & Operations Research, 2010, 37(4): 738-753.
-
(2010)
Computers & Operations Research
, vol.37
, Issue.4
, pp. 738-753
-
-
Anon1
-
15
-
-
33947322521
-
Risk-constrained bidding strategy with stochastic unit commitment
-
Li T, Shahidehpour M, Li Z. Risk-constrained bidding strategy with stochastic unit commitment[J]. IEEE Transactions on Power Systems, 2007, 22(1): 449-458.
-
(2007)
IEEE Transactions on Power Systems
, vol.22
, Issue.1
, pp. 449-458
-
-
Li, T.1
Shahidehpour, M.2
Li, Z.3
|