메뉴 건너뛰기




Volumn 30, Issue 13, 2010, Pages 101-108

Optimal determination of long-term and mid-term contracts for a hydropower producer based on stochastic programming

Author keywords

Electricity market; Forward contract; Hydro scheduling; Scenario tree model; Stochastic linear programming

Indexed keywords

COMMERCE; DECISION TREES; ELECTRIC INDUSTRY; FUZZY CONTROL; HYDROELECTRIC POWER; LINEAR PROGRAMMING; LINEARIZATION; OPTIMIZATION; PROFITABILITY; SCHEDULING; STOCHASTIC PROGRAMMING; STOCHASTIC SYSTEMS;

EID: 77953266510     PISSN: 02588013     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (17)

References (29)
  • 1
    • 0037291644 scopus 로고    scopus 로고
    • Purchase allocation and demand bidding in electric power market
    • Liu Y, Guan X H. Purchase allocation and demand bidding in electric power market[J]. IEEE Transactions on Power Systems, 2003, 18(1): 106-112.
    • (2003) IEEE Transactions on Power Systems , vol.18 , Issue.1 , pp. 106-112
    • Liu, Y.1    Guan, X.H.2
  • 2
    • 33744747043 scopus 로고    scopus 로고
    • Long-term electricity purchasing scheme and risk assessment in power markets
    • in Chinese
    • Zhou Ming, Nie Yanli, Li Gengyin, et al. Long-term electricity purchasing scheme and risk assessment in power markets[J]. Proceedings of the CSEE, 2006, 26(6): 116-122(in Chinese).
    • (2006) Proceedings of the CSEE , vol.26 , Issue.6 , pp. 116-122
    • Zhou, M.1    Nie, Y.2    Li, G.3
  • 3
    • 4344574491 scopus 로고    scopus 로고
    • Studies on centralized contract generation amount based on equilibrium theory
    • in Chinese
    • Song Yiqun, Ni Yixin, Hou Zhijian, et al. Studies on centralized contract generation amount based on equilibrium theory[J]. Proceedings of the CSEE, 2004, 24(7): 64-67(in Chinese).
    • (2004) Proceedings of the CSEE , vol.24 , Issue.7 , pp. 64-67
    • Song, Y.1    Ni, Y.2    Hou, Z.3
  • 4
    • 3242804487 scopus 로고    scopus 로고
    • Research on optimized power purchasing of power supplies under risk condition
    • in Chinese
    • Guo Jin, Jiang Wei, Tan Zhongfu. Research on optimized power purchasing of power supplies under risk condition[J]. Power System Technology, 2004, 28(11): 18-22(in Chinese).
    • (2004) Power System Technology , vol.28 , Issue.11 , pp. 18-22
    • Guo, J.1    Jiang, W.2    Tan, Z.3
  • 5
    • 14544273366 scopus 로고    scopus 로고
    • Optimal electricity procurement for load service entities incorporating with reserve and risks
    • in Chinese
    • Zhou Ming, Li Gengyin, Yan Zheng, et al. Optimal electricity procurement for load service entities incorporating with reserve and risks[J]. Power System Technology, 2005, 29(3): 33-38, 67(in Chinese).
    • (2005) Power System Technology , vol.29 , Issue.3
    • Zhou, M.1    Li, G.2    Yan, Z.3
  • 6
    • 13944259392 scopus 로고    scopus 로고
    • A long-term allocating strategy of power generators
    • in Chinese
    • Zhang Xian, Wang Xifan, Wang Jianxue, et al. A long-term allocating strategy of power generators[J]. Proceedings of the CSEE, 2005, 25(1): 6-12(in Chinese).
    • (2005) Proceedings of the CSEE , vol.25 , Issue.1 , pp. 6-12
    • Zhang, X.1    Wang, X.2    Wang, J.3
  • 7
    • 33847635273 scopus 로고    scopus 로고
    • Managing price risk in a multimarket environment
    • Liu M, Wu F F. Managing price risk in a multimarket environment[J]. IEEE Transactions on Power Systems, 2006, 21(4): 1512-1519.
    • (2006) IEEE Transactions on Power Systems , vol.21 , Issue.4 , pp. 1512-1519
    • Liu, M.1    Wu, F.F.2
  • 8
    • 34548017678 scopus 로고    scopus 로고
    • Supplier asset allocation in a Pool-based electricity market
    • Feng D, Gan D, Zhong J, et al. Supplier asset allocation in a Pool-based electricity market[J]. IEEE Transactions on Power Systems, 2007, 22(3): 1129-1138.
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.3 , pp. 1129-1138
    • Feng, D.1    Gan, D.2    Zhong, J.3
  • 9
    • 52249112269 scopus 로고    scopus 로고
    • Trading strategy of generation companies in electricity market
    • in Chinese
    • Liu Min, Wu Fuli. Trading strategy of generation companies in electricity market[J]. Proceedings of the CSEE, 2008, 28(25): 111-117(in Chinese).
    • (2008) Proceedings of the CSEE , vol.28 , Issue.25 , pp. 111-117
    • Liu, M.1    Wu, F.2
  • 10
    • 0033079502 scopus 로고    scopus 로고
    • Generation scheduling in a deregulated system: The Norwegian case
    • Fosso O B, Gjelsvik A, Haugstad A, et al. Generation scheduling in a deregulated system: the Norwegian case[J]. IEEE Transactions on Power Systems, 1999, 14(1): 75-81.
    • (1999) IEEE Transactions on Power Systems , vol.14 , Issue.1 , pp. 75-81
    • Fosso, O.B.1    Gjelsvik, A.2    Haugstad, A.3
  • 11
  • 12
    • 0022185792 scopus 로고
    • Stochastic optimization of a multireservoir hydroelectric system: A decomposition approach
    • Pereira M V F, Pinto L M V G. Stochastic optimization of a multireservoir hydroelectric system: a decomposition approach[J]. Water Resources Research, 1985, 21(6): 779-792.
    • (1985) Water Resources Research , vol.21 , Issue.6 , pp. 779-792
    • Pereira, M.V.F.1    Pinto, L.M.V.G.2
  • 13
    • 0030148466 scopus 로고    scopus 로고
    • Hydropower generation management under uncertainty via scenario analysis and parallel computation
    • Escudero L F, Fuente J L, García C, et al. Hydropower generation management under uncertainty via scenario analysis and parallel computation[J]. IEEE Transactions on Power Systems, 1996, 11(2): 683-689.
    • (1996) IEEE Transactions on Power Systems , vol.11 , Issue.2 , pp. 683-689
    • Escudero, L.F.1    Fuente, J.L.2    García, C.3
  • 15
    • 0026817984 scopus 로고
    • Stochastic dual dynamic programming for seasonal scheduling in the Norwegian power systems
    • RØtting T A, Gjelsvik A. Stochastic dual dynamic programming for seasonal scheduling in the Norwegian power systems[J]. IEEE Transactions on Power Systems, 1992, 7(1): 273-279.
    • (1992) IEEE Transactions on Power Systems , vol.7 , Issue.1 , pp. 273-279
    • RØtting, T.A.1    Gjelsvik, A.2
  • 16
    • 0035339588 scopus 로고    scopus 로고
    • Integrated risk management of hydro power scheduling and contract management
    • Mo B, Gjelsvik A, Grundt A. Integrated risk management of hydro power scheduling and contract management[J]. IEEE Transactions on Power Systems, 2001, 16(2): 216-221.
    • (2001) IEEE Transactions on Power Systems , vol.16 , Issue.2 , pp. 216-221
    • Mo, B.1    Gjelsvik, A.2    Grundt, A.3
  • 19
    • 36349025961 scopus 로고    scopus 로고
    • Forward contracting and selling price determination for a retailer
    • Carrión M, Conejo A J, Arroyo J M. Forward contracting and selling price determination for a retailer[J]. IEEE Transactions on Power Systems, 2007, 22(4): 2105-2114.
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.4 , pp. 2105-2114
    • Carrión, M.1    Conejo, A.J.2    Arroyo, J.M.3
  • 20
    • 34248589607 scopus 로고    scopus 로고
    • A stochastic programming approach to electric energy procurement for large consumers
    • Carrión M, Philpott A B, Conejo A J, et al. A stochastic programming approach to electric energy procurement for large consumers[J]. IEEE Transactions on Power Systems, 2007, 22(2): 744-754.
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.2 , pp. 744-754
    • Carrión, M.1    Philpott, A.B.2    Conejo, A.J.3
  • 22
    • 3242814352 scopus 로고    scopus 로고
    • Survey of bilateral contracts in power market
    • in Chinese
    • Zhang Xian, Wang Xifan, Chen Haoyong, et al. Survey of bilateral contracts in power market[J]. Electric Power Automation Equipment, 2003, 23(11): 77-86(in Chinese).
    • (2003) Electric Power Automation Equipment , vol.23 , Issue.11 , pp. 77-86
    • Zhang, X.1    Wang, X.2    Chen, H.3
  • 25
    • 0035261934 scopus 로고    scopus 로고
    • Generating scenario trees for multistage decision problems
    • Hoyland K, Wallace S W. Generating scenario trees for multistage decision problems[J]. Management Science, 2001, 47(2): 295-307.
    • (2001) Management Science , vol.47 , Issue.2 , pp. 295-307
    • Hoyland, K.1    Wallace, S.W.2
  • 26
    • 0013270047 scopus 로고    scopus 로고
    • Scenario tree generation for multiperiod financial optimization by optimal discretization
    • Pflug G C. Scenario tree generation for multiperiod financial optimization by optimal discretization[J]. Mathematical Programming, 2001, 89(2): 251-271.
    • (2001) Mathematical Programming , vol.89 , Issue.2 , pp. 251-271
    • Pflug, G.C.1
  • 28
    • 33947322521 scopus 로고    scopus 로고
    • Risk-constrained bidding strategy with stochastic unit commitment
    • Li T, Shahidehpour M, Li Z. Risk-constrained bidding strategy with stochastic unit commitment[J]. IEEE Transactions on Power Systems, 2007, 22(1): 449-458.
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.1 , pp. 449-458
    • Li, T.1    Shahidehpour, M.2    Li, Z.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.