-
1
-
-
31744434154
-
A simulation-based optimization framework for product development cycle time reduction
-
DOI 10.1109/TEM.2005.861805
-
Abdelsalam, H.M. and Bao, H.P. (2006) 'A simulation-based optimization framework for product development cycle time reduction', IEEE Transactions on Engineering Management, Vol. 53, No. 1, pp. 69-85. (Pubitemid 43174065)
-
(2006)
IEEE Transactions on Engineering Management
, vol.53
, Issue.1
, pp. 69-85
-
-
Abdelsalam, H.M.E.1
Bao, H.P.2
-
2
-
-
0036749163
-
Optimal design of power-system stabilizers using particle swarm optimization
-
DOI 10.1109/TEC.2002.801992, PII 1011092002801992
-
Abido, M.A. (2002) 'Optimal design of power-system stabilizers using particle swarm optimization', IEEE Transactions on Energy Conservation, Vol. 17, No. 3, pp. 406-413. (Pubitemid 35151678)
-
(2002)
IEEE Transactions on Energy Conversion
, vol.17
, Issue.3
, pp. 406-413
-
-
Abido, M.A.1
-
3
-
-
0030416580
-
A genetic algorithm for scheduling and decomposition of multidisciplinary design problems
-
Altus, S.S., Kroo, I.M. and Gage, P.J. (1996) 'A genetic algorithm for scheduling and decomposition of multidisciplinary design problems', Journal of Mechanical Design, Vol. 118, No. 4, pp. 486-489. (Pubitemid 126663989)
-
(1996)
Journal of Mechanical Design, Transactions of the ASME
, vol.118
, Issue.4
, pp. 486-489
-
-
Altus, S.S.1
Kroo, I.M.2
Gage, P.J.3
-
5
-
-
22844440688
-
Analytical design planning technique (ADePT): A dependency structure matrix tool to schedule the building design process
-
Austin, S., Baldwin, A., Li, B. and Waskett, P. (2000a) 'Analytical design planning technique (ADePT): a dependency structure matrix tool to schedule the building design process', Construction Management and Economics, Vol. 8, No. 2, pp. 173-182.
-
(2000)
Construction Management and Economics
, vol.8
, Issue.2
, pp. 173-182
-
-
Austin, S.1
Baldwin, A.2
Li, B.3
Waskett, P.4
-
6
-
-
0003408194
-
Application of the analytical design planning technique to construction project management
-
Austin, S., Baldwin, A., Li, B. and Waskett, P. (2000b) 'Application of the analytical design planning technique to construction project management', Project Management Journal, Vol. 31, No. 2, pp. 48-59.
-
(2000)
Project Management Journal
, vol.31
, Issue.2
, pp. 48-59
-
-
Austin, S.1
Baldwin, A.2
Li, B.3
Waskett, P.4
-
7
-
-
0001096735
-
Genetic algorithm and random keys for sequencing and optimization
-
Bean, J.C. (1994) 'Genetic algorithm and random keys for sequencing and optimization', ORSA Journal on Computing, Vol. 6, No. 2, pp. 154-160.
-
(1994)
ORSA Journal on Computing
, vol.6
, Issue.2
, pp. 154-160
-
-
Bean, J.C.1
-
8
-
-
0000547773
-
New product development: The new time wars
-
Blackburn, J.D. (Ed.): Irwin, Homewood, IL
-
Blackburn, J.D. (1991) 'New product development: the new time wars', in Blackburn, J.D. (Ed.): Time-Based Competition, Business One Irwin, Homewood, IL.
-
(1991)
Time-Based Competition, Business One
-
-
Blackburn, J.D.1
-
9
-
-
0035416239
-
Applying the design structure matrix to system decomposition and integration problems: A review and new directions
-
DOI 10.1109/17.946528, PII S0018939101067058
-
Browning, T.R. (2001) 'Applying the design structure matrix to system decomposition and integration problems: a review and new directions', IEEE Transactions on Engineering Management, Vol. 48, No. 3, pp. 292-306. (Pubitemid 32933089)
-
(2001)
IEEE Transactions on Engineering Management
, vol.48
, Issue.3
, pp. 292-306
-
-
Browning, T.R.1
-
10
-
-
0035900050
-
Overlapping design and build cycles in product development
-
DOI 10.1016/S0377-2217(00)00264-2, PII S0377221700002642
-
Chakravarty, A.K. (2001) 'Overlapping design and build cycles in product development', European Journal of Operational Research, Vol. 134, No. 2, pp. 392-424. (Pubitemid 32723628)
-
(2001)
European Journal of Operational Research
, vol.134
, Issue.2
, pp. 392-424
-
-
Chakravarty, A.K.1
-
12
-
-
1842540541
-
Task structuring toward computational approaches to product variety design
-
DETC97/DAC-3766, ASME, New York
-
Fujita, K. and Ishii, K. (1997) 'Task structuring toward computational approaches to product variety design', Proceedings of the 1997 ASME Design Engineering Technical Conferences, DETC97/DAC-3766, ASME, New York.
-
(1997)
Proceedings of the 1997 ASME Design Engineering Technical Conferences
-
-
Fujita, K.1
Ishii, K.2
-
14
-
-
0034497708
-
A method for architecting product platforms
-
Gonzalez-Zugasti, J.P., Otto, K.N. and Baker, J.D. (2000) 'A method for architecting product platforms', Research in Engineering Design, Vol. 12, No. 2, pp. 61-72.
-
(2000)
Research in Engineering Design
, vol.12
, Issue.2
, pp. 61-72
-
-
Gonzalez-Zugasti, J.P.1
Otto, K.N.2
Baker, J.D.3
-
15
-
-
0025985799
-
The return map: Tracking product teams
-
January-February
-
House, C.H. and Price, R.L. (1991) 'The return map: tracking product teams', Harvard Business Review, January-February, pp. 92-101.
-
(1991)
Harvard Business Review
, pp. 92-101
-
-
House, C.H.1
Price, R.L.2
-
16
-
-
4344682502
-
Recent advances in particle swarm
-
Oregon, Portland
-
Hu, X., Shi, Y. and Eberhart, R.C. (2004) 'Recent advances in particle swarm', Proceedings of the IEEE Congress on Evolutionary Computation, Oregon, Portland, Vol. 1, pp. 90-97.
-
(2004)
Proceedings of the IEEE Congress on Evolutionary Computation
, vol.1
, pp. 90-97
-
-
Hu, X.1
Shi, Y.2
Eberhart, R.C.3
-
17
-
-
0029535737
-
Particle swarm optimization
-
NJ, Piscataway
-
Kennedy, J. and Eberhart, R.C. (1995) 'Particle swarm optimization', Proceedings of IEEE International Conference on Neural Networks, NJ, Piscataway, pp. 1942-1948.
-
(1995)
Proceedings of IEEE International Conference on Neural Networks
, pp. 1942-1948
-
-
Kennedy, J.1
Eberhart, R.C.2
-
18
-
-
0004222346
-
-
Morgan Kaufmann Publishers, San Francisco
-
Kennedy, J., Eberhart, R.C. and Shi, Y. (2001) Swarm Intelligence, Morgan Kaufmann Publishers, San Francisco.
-
(2001)
Swarm Intelligence
-
-
Kennedy, J.1
Eberhart, R.C.2
Shi, Y.3
-
19
-
-
0028465104
-
Reengineering of design and manufacturing processes
-
Kusiak, N.L. and Wang, J. (1994) 'Reengineering of design and manufacturing processes', Computers and Industrial Engineering, Vol. 26, No. 3, pp. 521-536.
-
(1994)
Computers and Industrial Engineering
, vol.26
, Issue.3
, pp. 521-536
-
-
Kusiak, N.L.1
Wang, J.2
-
20
-
-
77956799637
-
Decomposition procedures for the solving of large scale systems
-
Ledet, W.P. and Himmelblau, D.M. (1970) 'Decomposition procedures for the solving of large scale systems', Advances in Chemical Engineering, Vol. 8, No. 4, pp. 185-224.
-
(1970)
Advances in Chemical Engineering
, vol.8
, Issue.4
, pp. 185-224
-
-
Ledet, W.P.1
Himmelblau, D.M.2
-
21
-
-
33847609606
-
A discrete version of particle swarm optimization for flowshop scheduling problems
-
DOI 10.1016/j.cor.2005.11.017, PII S0305054805003643
-
Liao, C-J., Tseng, C-T. and Luarn, P. (2007) 'A discrete version of particle swarm optimization for flowshop scheduling problems', Computers & Operations Research, Vol. 34, No. 10, pp. 3099-3111. (Pubitemid 46356739)
-
(2007)
Computers and Operations Research
, vol.34
, Issue.10
, pp. 3099-3111
-
-
Liao, C.-J.1
Chao-Tang Tseng2
Luarn, P.3
-
22
-
-
34250678915
-
Design process sequencing with competent genetic algorithms
-
DOI 10.1115/1.2717224
-
Meier, C., Yassine, A.A. and Browning, T.R. (2007) 'Design process sequencing with competent genetic algorithms', Journal of Mechanical Design, Vol. 129, No. 6, pp. 566-585. (Pubitemid 46939122)
-
(2007)
Journal of Mechanical Design, Transactions of the ASME
, vol.129
, Issue.6
, pp. 566-585
-
-
Meier, C.1
Yassine, A.A.2
Browning, T.R.3
-
24
-
-
31744439627
-
Developing your products in half the time
-
December Problematics
-
Pichler, R. and Smith, P. (2003) 'Developing your products in half the time', Critical EYE, December, pp. 1-4. Problematics, available at http://www.problematics.com.
-
(2003)
Critical EYE
, pp. 1-4
-
-
Pichler, R.1
Smith, P.2
-
26
-
-
84983160223
-
DeMaid/GA - An enhanced design manager's aid for intelligent decomposition
-
Presented at the Seattle, WA 4-6 September, AIAA Paper 96-4157
-
Rogers, J.L. (1996) 'DeMaid/GA - an enhanced design manager's aid for intelligent decomposition', Presented at the 6th AIAA/USAF/NASA/OSSMO Symp. Multidisciplinary Anal. Optim., Seattle, WA, 4-6 September, AIAA Paper No. 96-4157.
-
(1996)
6th AIAA/USAF/NASA/OSSMO Symp. Multidisciplinary Anal. Optim.
-
-
Rogers, J.L.1
-
27
-
-
84991070834
-
Ordering design tasks based on coupling strengths
-
Panama City, Florida. AIAA paper 94-4326, Also NASA TM 109137
-
Rogers, J.L. and Bloebaum, C.L. (1994) 'Ordering design tasks based on coupling strengths', Proceeding the 5th AIAA/USAF/NASA/ISSMO Symposium on Multidisciplinary Analysis and Optimization, Panama City, Florida. AIAA paper No. 94-4326, Also NASA TM 109137.
-
(1994)
Proceeding the 5th AIAA/USAF/NASA/ISSMO Symposium on Multidisciplinary Analysis and Optimization
-
-
Rogers, J.L.1
Bloebaum, C.L.2
-
28
-
-
0037058296
-
Particle swarm optimization for task assignment problem
-
Salman, A., Ahmad, I. and Al-Madani, S. (2002) 'Particle swarm optimization for task assignment problem', Microprocessors and Microsystems, Vol. 26, No. 8, pp. 363-371.
-
(2002)
Microprocessors and Microsystems
, vol.26
, Issue.8
, pp. 363-371
-
-
Salman, A.1
Ahmad, I.2
Al-Madani, S.3
-
29
-
-
0031700696
-
A modified particle swarm optimizer
-
NJ, Piscataway
-
Shi, Y. and Eberhart, R.C. (1998) 'A modified particle swarm optimizer', Proceedings of the IEEE Congress on Evolutionary Computation, NJ, Piscataway, pp. 69-173.
-
(1998)
Proceedings of the IEEE Congress on Evolutionary Computation
, pp. 69-173
-
-
Shi, Y.1
Eberhart, R.C.2
-
30
-
-
0032287534
-
Faster to market
-
Smith, P.G. and Reinertsen, D.G. (1998) 'Faster to market, ' Mechanical Engineering, Vol. 120, No. 12, pp. 68-70.
-
(1998)
Mechanical Engineering
, vol.120
, Issue.12
, pp. 68-70
-
-
Smith, P.G.1
Reinertsen, D.G.2
-
31
-
-
0031199079
-
A predictive model of sequential iteration in engineering design
-
Smith, R.P. and Eppinger, S.D. (1997) 'A predictive model of sequential iteration in engineering design', Management Science, Vol. 43, No. 8, pp. 1104-1120. (Pubitemid 127610542)
-
(1997)
Management Science
, vol.43
, Issue.8
, pp. 1104-1120
-
-
Smith, R.P.1
Eppinger, S.D.2
-
33
-
-
33751236810
-
A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem
-
DOI 10.1016/j.ejor.2005.12.024, PII S0377221705008453
-
Tasgetiren, M.F., Liang, Y.-C., Sevkli, M. and Gencyilmaz, G. (2007) 'A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem', European Journal of Operational Research, Vol. 177, No. 3, pp. 1930-1947. (Pubitemid 44780934)
-
(2007)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 1930-1947
-
-
Tasgetiren, M.F.1
Liang, Y.-C.2
Sevkli, M.3
Gencyilmaz, G.4
-
34
-
-
47949089702
-
Particle swarm optimization algorithm for permutation flowshop sequencing problem
-
Springer-Verlag
-
Tasgetiren, M.F., Liang, Y-C., Sevkli, M. and Gencyilmaz, G. (2004a) 'Particle swarm optimization algorithm for permutation flowshop sequencing problem', Lecture Notes in Computer Science, Vol. 3172, pp. 382-390, Springer-Verlag.
-
(2004)
Lecture Notes in Computer Science
, vol.3172
, pp. 382-390
-
-
Tasgetiren, M.F.1
Liang, Y.-C.2
Sevkli, M.3
Gencyilmaz, G.4
-
35
-
-
33751080427
-
Particle swarm optimization algorithm for makespan and maximum lateness minimization in permutation flowshop sequencing problem
-
Sakarya, Turkey
-
Tasgetiren, M.F., Liang, Y-C., Sevkli, M. and Gencyilmaz, G. (2004b) 'Particle swarm optimization algorithm for makespan and maximum lateness minimization in permutation flowshop sequencing problem', Proceedings of the 4th International Symposium on Intelligent Manufacturing Systems (IMS2004), Sakarya, Turkey, pp. 431-441.
-
(2004)
Proceedings of the 4th International Symposium on Intelligent Manufacturing Systems (IMS2004)
, pp. 431-441
-
-
Tasgetiren, M.F.1
Liang, Y.-C.2
Sevkli, M.3
Gencyilmaz, G.4
-
36
-
-
4344713798
-
Particle swarm optimization algorithm for single machine total weighted tardiness problem
-
Portland, Oregon
-
Tasgetiren, M.F., Liang, Y-C., Sevkli, M. and Gencyilmaz, G. (2004c) 'Particle swarm optimization algorithm for single machine total weighted tardiness problem', Proceedings of the 2004 Congress on Evolutionary Computation (CEC'04), Portland, Oregon, pp. 1412-1419.
-
(2004)
Proceedings of the 2004 Congress on Evolutionary Computation (CEC'04)
, pp. 1412-1419
-
-
Tasgetiren, M.F.1
Liang, Y.-C.2
Sevkli, M.3
Gencyilmaz, G.4
-
37
-
-
0002345372
-
Cooperative learning in neural networks using particle swarm optimizers
-
Van den Bergh, F. and Engelbrecht, A.P. (2000) 'Cooperative learning in neural networks using particle swarm optimizers', South African Computer Journal, Vol. 26, pp. 84-90.
-
(2000)
South African Computer Journal
, vol.26
, pp. 84-90
-
-
Van Den Bergh, F.1
Engelbrecht, A.P.2
-
38
-
-
0015669818
-
Binary matrices in system modeling
-
Warfield, J.N. (1973) 'Binary matrices in system modeling', IEEE Transactions on Systems, Man, and Cybernetics, Vol. 3, No. 5, pp. 441-449.
-
(1973)
IEEE Transactions on Systems, Man, and Cybernetics
, vol.3
, Issue.5
, pp. 441-449
-
-
Warfield, J.N.1
-
39
-
-
0032658132
-
Engineering design management: An information structure approach
-
Yassine, A., Chelst, K. and Falkenburg, D. (1999) 'Engineering design management: an information structure approach', International Journal of Production Research, Vol. 37, No. 13, pp. 2957-2975.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.13
, pp. 2957-2975
-
-
Yassine, A.1
Chelst, K.2
Falkenburg, D.3
|