메뉴 건너뛰기




Volumn 1, Issue , 2012, Pages 318-328

Pushing the extended reach envelope at Sakhalin: An operator's experience drilling a record reach well

Author keywords

[No Author keywords available]

Indexed keywords

BOTTOMHOLE ASSEMBLY; CASE HISTORY; COMPLETION EQUIPMENT; DESIGN CONSIDERATIONS; DETAILED MODELING; DOWNHOLES; DRILLING AND COMPLETION; DRILLING OPERATION; DRILLING PERFORMANCE; ENVIRONMENTAL FOOTPRINTS; EXTENDED REACH DRILLING; EXTENDED REACH WELL; EXTENDED REACHES; EXXON MOBIL; HIGH TORQUE; HOLE QUALITY; HOLE SECTION; NON-PRODUCTIVE TIME; OPERATIONAL COMPLEXITY; OPERATIONAL PRACTICES; PERFORMANCE MANAGEMENT; PRODUCTION FACILITY; SAKHALIN ISLAND; TOTAL DEPTHS; VERTICAL SECTION; WELL CONSTRUCTION PROCESS; WELL DESIGN; WELLBORE INSTABILITY; WORLD RECORDS;

EID: 84861613117     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (33)

References (6)


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.