|
Volumn 1, Issue , 2012, Pages 318-328
|
Pushing the extended reach envelope at Sakhalin: An operator's experience drilling a record reach well
|
Author keywords
[No Author keywords available]
|
Indexed keywords
BOTTOMHOLE ASSEMBLY;
CASE HISTORY;
COMPLETION EQUIPMENT;
DESIGN CONSIDERATIONS;
DETAILED MODELING;
DOWNHOLES;
DRILLING AND COMPLETION;
DRILLING OPERATION;
DRILLING PERFORMANCE;
ENVIRONMENTAL FOOTPRINTS;
EXTENDED REACH DRILLING;
EXTENDED REACH WELL;
EXTENDED REACHES;
EXXON MOBIL;
HIGH TORQUE;
HOLE QUALITY;
HOLE SECTION;
NON-PRODUCTIVE TIME;
OPERATIONAL COMPLEXITY;
OPERATIONAL PRACTICES;
PERFORMANCE MANAGEMENT;
PRODUCTION FACILITY;
SAKHALIN ISLAND;
TOTAL DEPTHS;
VERTICAL SECTION;
WELL CONSTRUCTION PROCESS;
WELL DESIGN;
WELLBORE INSTABILITY;
WORLD RECORDS;
BOREHOLES;
DESIGN;
EXHIBITIONS;
OFFSHORE DRILLING;
OFFSHORE OIL WELLS;
OIL WELL DRILLING;
PETROLEUM RESERVOIR EVALUATION;
WELL COMPLETION;
WELL DRILLING;
|
EID: 84861613117
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (33)
|
References (6)
|