|
Volumn 2, Issue , 2009, Pages 689-700
|
How continuous improvement lead to the longest horizontal well in the world
a a b c |
Author keywords
[No Author keywords available]
|
Indexed keywords
ALUMINUM ALLOYS;
CONSTRAINED OPTIMIZATION;
HORIZONTAL DRILLING;
HORIZONTAL WELLS;
INFILL DRILLING;
KNOWLEDGE BASED SYSTEMS;
OFFSHORE GAS FIELDS;
OFFSHORE OIL FIELDS;
OFFSHORE OIL WELL PRODUCTION;
OIL WELL DRILLING;
CONTINUOUS IMPROVEMENTS;
CONTINUOUS OPTIMIZATION;
ENGINEERING ANALYSIS;
FIELD DEVELOPMENT;
HORIZONTAL DRILLING TECHNIQUES;
OPERATING PARAMETERS;
SOUND ENGINEERINGS;
STATE OF THE ART;
OFFSHORE OIL WELLS;
|
EID: 70449671548
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: 10.2118/119506-ms Document Type: Conference Paper |
Times cited : (32)
|
References (3)
|