메뉴 건너뛰기




Volumn 61, Issue 1, 2012, Pages 449-454

Scheduling with alternative routings in CNC workshops

Author keywords

Load balancing; Optimization; Scheduling

Indexed keywords

ALTERNATIVE ROUTINGS; ASSIGNMENT OF; CNC MACHINE; FLEXIBLE JOB SHOPS; INDUSTRIAL CASE STUDY; LARGE-SCALE PROBLEM; ON-MACHINES; ROUTINGS; SCHEDULING PROBLEM;

EID: 84861609464     PISSN: 00078506     EISSN: 17260604     Source Type: Journal    
DOI: 10.1016/j.cirp.2012.03.045     Document Type: Article
Times cited : (28)

References (25)
  • 1
    • 0001267414 scopus 로고
    • Decision CPM: A Method for Simultaneous Planning, Scheduling, and Control of Projects
    • W. Crowston, and G.L. Thompson Decision CPM: A Method for Simultaneous Planning, Scheduling, and Control of Projects Operations Research 15 1967 407 426
    • (1967) Operations Research , vol.15 , pp. 407-426
    • Crowston, W.1    Thompson, G.L.2
  • 2
    • 0019145498 scopus 로고
    • Solution of Large-Scale Scheduling Problems for Job-Shop Type Machining Systems with Alternative Machine Tools
    • K. Iwata, Y. Murotsu, F. Oba, and K. Okamur Solution of Large-Scale Scheduling Problems for Job-Shop Type Machining Systems with Alternative Machine Tools CIRP Annals - Manufacturing Technology 29 1 1980 335 338
    • (1980) CIRP Annals - Manufacturing Technology , vol.29 , Issue.1 , pp. 335-338
    • Iwata, K.1    Murotsu, Y.2    Oba, F.3    Okamur, K.4
  • 3
  • 4
    • 0026910349 scopus 로고
    • Dynamic Planning Enriches Concurrent Process and Production Planning
    • N.E. Larsen, and L. Alting Dynamic Planning Enriches Concurrent Process and Production Planning International Journal of Production Research 30 8 1992 1861 1876
    • (1992) International Journal of Production Research , vol.30 , Issue.8 , pp. 1861-1876
    • Larsen, N.E.1    Alting, L.2
  • 8
    • 0030649987 scopus 로고    scopus 로고
    • Modelling of Biological Manufacturing Systems for Dynamic Reconfiguration
    • K. Ueda, J. Vaario, and K.H. Ohkura Modelling of Biological Manufacturing Systems for Dynamic Reconfiguration CIRP Annals - Manufacturing Technology 46 1 1997 343 346
    • (1997) CIRP Annals - Manufacturing Technology , vol.46 , Issue.1 , pp. 343-346
    • Ueda, K.1    Vaario, J.2    Ohkura, K.H.3
  • 12
    • 79957656135 scopus 로고    scopus 로고
    • Development of Multi-Level Adaptive Control and Scheduling Solutions for Shop-Floor Automation in Reconfigurable Manufacturing Systems
    • A. Valente, and E. Carpanzano Development of Multi-Level Adaptive Control and Scheduling Solutions for Shop-Floor Automation in Reconfigurable Manufacturing Systems CIRP Annals - Manufacturing Technology 60 1 2011 449 452
    • (2011) CIRP Annals - Manufacturing Technology , vol.60 , Issue.1 , pp. 449-452
    • Valente, A.1    Carpanzano, E.2
  • 13
  • 14
    • 0033115210 scopus 로고    scopus 로고
    • Exploiting Process Plan Flexibility in Production Scheduling: A Multi-Objective Approach
    • P. Brandimarte Exploiting Process Plan Flexibility in Production Scheduling: A Multi-Objective Approach European Journal of Operational Research 114 1 1999 59 71
    • (1999) European Journal of Operational Research , vol.114 , Issue.1 , pp. 59-71
    • Brandimarte, P.1
  • 15
    • 0042021869 scopus 로고    scopus 로고
    • Job-shop Scheduling with Processing Alternatives
    • T. Kis Job-shop Scheduling with Processing Alternatives European Journal of Operational Research 151 2002 307 332
    • (2002) European Journal of Operational Research , vol.151 , pp. 307-332
    • Kis, T.1
  • 17
    • 75449102375 scopus 로고    scopus 로고
    • Mathematical Models for Job-Shop Scheduling Problems with Routing and Process Plan Flexibility
    • C. Özgüven, L. Özbakir, and Y. Yavuz Mathematical Models for Job-Shop Scheduling Problems with Routing and Process Plan Flexibility Applied Mathematical Modelling 34 2010 1539 1548
    • (2010) Applied Mathematical Modelling , vol.34 , pp. 1539-1548
    • Özgüven, C.1    Özbakir, L.2    Yavuz, Y.3
  • 18
    • 34250084648 scopus 로고
    • Routing and Scheduling in a Flexible Job Shop by Tabu Search
    • P. Brandimarte Routing and Scheduling in a Flexible Job Shop by Tabu Search Annals of Operations Research 41 1993 157 183
    • (1993) Annals of Operations Research , vol.41 , pp. 157-183
    • Brandimarte, P.1
  • 19
    • 0002577337 scopus 로고    scopus 로고
    • Effective Neighborhood Function for the Flexible Job Shop Problem
    • M. Mastrolilli, and L.M. Gambardella Effective Neighborhood Function for the Flexible Job Shop Problem Journal of Scheduling 3 2000 3 20
    • (2000) Journal of Scheduling , vol.3 , pp. 3-20
    • Mastrolilli, M.1    Gambardella, L.M.2
  • 20
    • 34247624966 scopus 로고    scopus 로고
    • Flexible Job-Shop Scheduling with Routing Flexibility and Separable Setup Times Using Ant Colony Optimisation Method
    • A. Rossi, and G. Dini Flexible Job-Shop Scheduling with Routing Flexibility and Separable Setup Times Using Ant Colony Optimisation Method Robotics and Computer-Integrated Manufacturing 23 2007 503 516
    • (2007) Robotics and Computer-Integrated Manufacturing , vol.23 , pp. 503-516
    • Rossi, A.1    Dini, G.2
  • 21
    • 33749556446 scopus 로고    scopus 로고
    • Bio-Inspired Scheduling for Dynamic Job Shops with Flexible Routing and Sequence-Dependent Setups
    • X. Yu, and B. Ram Bio-Inspired Scheduling for Dynamic Job Shops With Flexible Routing and Sequence-Dependent Setups International Journal of Production Research 44 22 2006 4793 4813
    • (2006) International Journal of Production Research , vol.44 , Issue.22 , pp. 4793-4813
    • Yu, X.1    Ram, B.2
  • 22
    • 59649096254 scopus 로고    scopus 로고
    • Computing Lower and Upper Bounds for a Large-Scale Industrial Job Shop Scheduling Problem
    • M. Drótos, G. Erds, and T. Kis Computing Lower and Upper Bounds for a Large-Scale Industrial Job Shop Scheduling Problem European Journal of Operational Research 197 1 2009 296 306
    • (2009) European Journal of Operational Research , vol.197 , Issue.1 , pp. 296-306
    • Drótos, M.1    Erds, G.2    Kis, T.3
  • 23
    • 0346724487 scopus 로고    scopus 로고
    • Evaluating the Impact of Alternative Plans on Manufacturing Performance
    • J.M. Usher Evaluating the Impact of Alternative Plans on Manufacturing Performance Computers & Industrial Engineering 45 2003 585 596
    • (2003) Computers & Industrial Engineering , vol.45 , pp. 585-596
    • Usher, J.M.1
  • 25
    • 84861640865 scopus 로고    scopus 로고
    • accessed 30.11.2011
    • The Computational Infrastructure for Operations Research (COIN-OR), http://www.coin-or.org/ (accessed 30.11.2011).


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.