메뉴 건너뛰기




Volumn 60, Issue 1, 2011, Pages 449-452

Development of multi-level adaptive control and scheduling solutions for shop-floor automation in reconfigurable manufacturing systems

Author keywords

Automation task scheduling; Distributed control; Reconfiguration

Indexed keywords

ADAPTIVE AUTOMATION; ADAPTIVE CONTROL; ASSEMBLY LINE; DISTRIBUTED CONTROL; DYNAMIC ALGORITHM; HARDWARE RESOURCES; IEC 61499; MULTI-LEVEL; PRELIMINARY ANALYSIS; PRODUCTION DEMAND; PRODUCTION SYSTEM; RECONFIGURABLE MANUFACTURING SYSTEM; RECONFIGURATION; ROBOTIC CELL; SELF ADAPTIVE CONTROL; SHOP FLOOR; TASK-SCHEDULING;

EID: 79957656135     PISSN: 00078506     EISSN: 17260604     Source Type: Journal    
DOI: 10.1016/j.cirp.2011.03.036     Document Type: Article
Times cited : (36)

References (10)
  • 2
    • 34250173501 scopus 로고    scopus 로고
    • Advanced Automation Solutions for Future Adaptive Factories
    • DOI 10.1016/j.cirp.2007.05.104, PII S0007850607001059
    • E. Carpanzano, and F. Jovane Advanced Automation Solutions for Future Adaptive Factories CIRP Annals-Manufacturing Technology 56 1 2007 435 438 (Pubitemid 46898334)
    • (2007) CIRP Annals - Manufacturing Technology , vol.56 , Issue.1 , pp. 435-438
    • Carpanzano, E.1    Jovane, F.2
  • 3
    • 73149107277 scopus 로고    scopus 로고
    • Agent-Based Systems for Manufacturing
    • DOI 10.1016/j.cirp.2006.10.004, PII S1660277306000053
    • L. Monostori, J. Váncza, and S.R.T. Kumara Agent-based Systems for Manufacturing CIRP Annals-Manufacturing Technology 55 2 2006 697 720 (Pubitemid 46148813)
    • (2006) CIRP Annals - Manufacturing Technology , vol.55 , Issue.2 , pp. 697-720
    • Monostori, L.1    Vancza, J.2    Kumara, S.R.T.3
  • 5
    • 0031623866 scopus 로고    scopus 로고
    • Dynamics of Real-time Distributed Scheduling in Multiple-machine Heterarchical Manufacturing Systems
    • N. Duffie, and P. Kaltjob Dynamics of Real-time Distributed Scheduling in Multiple-machine Heterarchical Manufacturing Systems CIRP Annals-Manufacturing Technology 47 1 1998 415 418
    • (1998) CIRP Annals-Manufacturing Technology , vol.47 , Issue.1 , pp. 415-418
    • Duffie, N.1    Kaltjob, P.2
  • 6
    • 0036494291 scopus 로고    scopus 로고
    • A structured methodology for the design and implementation of control and supervision systems for robotic applications
    • DOI 10.1109/87.987073, PII S1063653602003238
    • L. Ferrarini, and E. Carpanzano A Structured Methodology for the Design and Implementation of Control and Supervision Systems for Robotic Applications IEEE Transactions on Control Systems Technology 10 2 2002 272 279 (Pubitemid 34404551)
    • (2002) IEEE Transactions on Control Systems Technology , vol.10 , Issue.2 , pp. 272-279
    • Ferrarini, L.1    Carpanzano, E.2
  • 7
    • 77955339347 scopus 로고    scopus 로고
    • A STEP Compliant Knowledge Based Schema to Support Shop-floor Adaptive Automation in Dynamic Manufacturing Environments
    • A. Valente, E. Carpanzano, A. Nassehi, and S.T. Newman A STEP Compliant Knowledge Based Schema to Support Shop-floor Adaptive Automation in Dynamic Manufacturing Environments CIRP Annals-Manufacturing Technology 59 1 2010 441 444
    • (2010) CIRP Annals-Manufacturing Technology , vol.59 , Issue.1 , pp. 441-444
    • Valente, A.1    Carpanzano, E.2    Nassehi, A.3    Newman, S.T.4
  • 10
    • 79957636805 scopus 로고    scopus 로고
    • Schedulability Analysis for non Necessarily Harmonic Real-Time Systems with Precedence and Strict Periodicity Constraints using the Exact Number of Preemptions and no Idle Time
    • Dublin, Ireland
    • P. Yomsi, and Y. Sorel Schedulability Analysis for non Necessarily Harmonic Real-Time Systems with Precedence and Strict Periodicity Constraints using the Exact Number of Preemptions and no Idle Time Proc. of the 4th Multidisciplinary International Scheduling Conference Dublin, Ireland 2009
    • (2009) Proc. of the 4th Multidisciplinary International Scheduling Conference
    • Yomsi, P.1    Sorel, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.