메뉴 건너뛰기




Volumn 4, Issue , 2001, Pages 306-311

Generator maintenance scheduling to maximize reliability and revenue

Author keywords

Costs; Outage scheduling; Probabilistic analysis; Reliability

Indexed keywords

ASSOCIATED COSTS; GENERATOR MAINTENANCE; IEEE-RELIABILITY TEST SYSTEM; INCREMENTAL COST; MAINTENANCE MODELS; MAINTENANCE SCHEDULES; MAINTENANCE SCHEDULING; MAINTENANCE STRATEGIES; NUMERICAL EXAMPLE; OUTAGE SCHEDULING; PROBABILISTIC ANALYSIS; SYSTEM RELIABILITY;

EID: 84861401294     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/PTC.2001.964851     Document Type: Conference Paper
Times cited : (8)

References (23)
  • 1
    • 84861390811 scopus 로고
    • Adjusting maintenance schedules to levelize risk
    • L. L. Garver, "Adjusting Maintenance Schedules to Levelize Risk", IEEE Trans., 112, pp. 154-158, 1972.
    • (1972) IEEE Trans. , vol.112 , pp. 154-158
    • Garver, L.L.1
  • 2
    • 0017493313 scopus 로고
    • Several objectives criteria for optimal generator preventive maintenance scheduling
    • May
    • H.H. Zurn and V.H. Quintana, "Several Objectives Criteria for Optimal generator Preventive Maintenance Scheduling", IEEE Trans, on PWRS, Vol. 96, 3, pp. 984-992, May 1977.
    • (1977) IEEE Trans, on PWRS , vol.96 , Issue.3 , pp. 984-992
    • Zurn, H.H.1    Quintana, V.H.2
  • 3
    • 0016990741 scopus 로고
    • An experimental method of determination of optimal maintenance schedules in power systems using the branch and bound technique
    • Aug.
    • G.T. Egan, T.S. Dillon and K. Morsztyn, "An Experimental Method of Determination of Optimal Maintenance Schedules in Power Systems Using the Branch and Bound Technique", IEEE Trans. Man & Cybs., Vol. SMC-6, No. 8, 1269-1278, Aug. 1976.
    • (1976) IEEE Trans. Man & Cybs. , vol.SMC-6 , Issue.8 , pp. 1269-1278
    • Egan, G.T.1    Dillon, T.S.2    Morsztyn, K.3
  • 4
    • 0016552456 scopus 로고
    • Optimal generator maintenance scheduling using integer programming
    • No. Sept/Oct
    • J. F. Dopazo and H.M. Merril, "Optimal Generator Maintenance Scheduling using Integer Programming", IEEE Trans. PAS-94. No. Sept/Oct, 1975.
    • (1975) IEEE Trans. , vol.PAS-94
    • Dopazo, J.F.1    Merril, H.M.2
  • 5
    • 0019544908 scopus 로고
    • Maintenance scheduling for generation system planning
    • March
    • J.P. Stremmel, "Maintenance Scheduling for Generation System Planning", IEEE Transactions on Power Apparatus and Systems, 3, pp. 1410-1419, March 1981.
    • (1981) IEEE Transactions on Power Apparatus and Systems , vol.3 , pp. 1410-1419
    • Stremmel, J.P.1
  • 6
    • 0021422665 scopus 로고
    • Generating unit maintenance scheduling for single and two interconnected systems
    • May
    • F.A. El-Sheikhi and R. Billinton, "Generating Unit Maintenance Scheduling for Single and Two Interconnected Systems", IEEE Trans, on PAS, Vol. PAS-103, No. 5, May 1984.
    • (1984) IEEE Trans, on PAS , vol.PAS-103 , Issue.5
    • El-Sheikhi, F.A.1    Billinton, R.2
  • 7
    • 0024668655 scopus 로고
    • An interactive package for risk evaluation and maintenance scheduling
    • May
    • G.C. Contaxis, S.D. Kavatza and CD. Vournas, "An Interactive Package for Risk Evaluation and Maintenance Scheduling", IEEE Trans, on PWRS, Vol. 4, No. 2, May 1989, pp. 389-395.
    • (1989) IEEE Trans, on PWRS , vol.4 , Issue.2 , pp. 389-395
    • Contaxis, G.C.1    Kavatza, S.D.2    Vournas, C.D.3
  • 9
    • 0026203507 scopus 로고
    • Optimal generating unit maintenance scheduling for multi-area system with network constraints
    • DOI 10.1109/59.119262
    • L. Chen and J. Toyoda, "Optimal Generating Unit Maintenance Scheduling for Multi-Area System with Network Constraints", IEEE Trans, on PS, Vol. 6, pp. 1168-1174, Aug. 1991. (Pubitemid 21690172)
    • (1991) IEEE Transactions on Power Systems , vol.6 , Issue.3 , pp. 1168-1174
    • Chen Luonan1    Toyoda Junichi2
  • 10
    • 0026868528 scopus 로고
    • A decomposition approach to unit maintenance scheduling
    • May
    • J. Yellen, T.M. Al-Khamis, S. Veruri and L. Lemonidis, "A Decomposition Approach to Unit Maintenance Scheduling", IEEE Trans, on PWRS, Vol. 7, No. 2, pp. 726-733, May 1992.
    • (1992) IEEE Trans, on PWRS , vol.7 , Issue.2 , pp. 726-733
    • Yellen, J.1    Al-Khamis, T.M.2    Veruri, S.3    Lemonidis, L.4
  • 11
    • 0026867589 scopus 로고
    • Unit maintenance scheduling with fuel constraints
    • May
    • T.M. Al-Khamis, S. Vemuri, L. Lemonidis and J. Yellen, "Unit Maintenance Scheduling with Fuel Constraints" IEEE Trans, on PWRS, Vol. 7, No. 2, pp. 933-939, May 1992.
    • (1992) IEEE Trans, on PWRS , vol.7 , Issue.2 , pp. 933-939
    • Al-Khamis, T.M.1    Vemuri, S.2    Lemonidis, L.3    Yellen, J.4
  • 12
    • 0026909978 scopus 로고
    • An expert system for generator maintenance scheduling using operation index
    • August
    • CE. Lin, C.J. Huang, C.L. Huang, C.C. Liang and S.Y. Lee, "An Expert System for Generator Maintenance Scheduling Using Operation Index" IEEE Transactions on Power Syst., Vol. 7, No. 3, pp. 1141-1148, August 1992.
    • (1992) IEEE Transactions on Power Syst. , vol.7 , Issue.3 , pp. 1141-1148
    • Lin, C.E.1    Huang, C.J.2    Huang, C.L.3    Liang, C.C.4    Lee, S.Y.5
  • 14
    • 0029405654 scopus 로고
    • A systems approach to least-cost maintenance scheduling for an interconnected power system
    • Nov.
    • D. Chattopadhyay, K. Bhattacharya and J. Parikh, "A Systems Approach to Least-Cost Maintenance Scheduling for an Interconnected Power System", IEEE Trans, on Power Systems, Vol. 10, No.4, pp. 2002-2007, Nov. 1995.
    • (1995) IEEE Trans, on Power Systems , vol.10 , Issue.4 , pp. 2002-2007
    • Chattopadhyay, D.1    Bhattacharya, K.2    Parikh, J.3
  • 15
    • 0031078395 scopus 로고    scopus 로고
    • An algorithm for thermal unit maintenance scheduling through combined use of ga sa and ts
    • H. Kim, Y. Hayashi and K. Nara, "An Algorithm for Thermal Unit Maintenance Scheduling Through Combined Use of GA SA and TS", IEEE Transactions on Power Systems, Vol. 12, No. 1, pp. 329-335, Feb. 1997. (Pubitemid 127771375)
    • (1997) IEEE Transactions on Power Systems , vol.12 , Issue.1 , pp. 329-335
    • Kim, H.1    Hayashi, Y.2    Nara, K.3
  • 16
    • 0031276372 scopus 로고    scopus 로고
    • Reliability analysis for hydrothermal generating systems including the effect of maintenance scheduling
    • 16]. J. Juan and I. Ortega, "Reliability Analysis for Hydrothermal Generating Systems Including the Effect of Maintenance Scheduling", IEEE Transactions on Power Systems, Vol. 12, No. 4, pp. 1561-1568, Nov. 1997. (Pubitemid 127771545)
    • (1997) IEEE Transactions on Power Systems , vol.12 , Issue.4 , pp. 1561-1568
    • Juan, J.1
  • 18
    • 0034138495 scopus 로고    scopus 로고
    • Pseudo-chrono1ogical simulation for composite reliability analysis with time varying loads
    • Feb.
    • A.M. Leite da Silva, L.A.F. Manso, J.C.O. Mello E R. Billinton, "Pseudo-Chrono1ogical Simulation for Composite Reliability Analysis with Time Varying Loads", IEEE Trans, on Power Syst., Vol.15, No.1, pp.73-80, Feb. 2000.
    • (2000) IEEE Trans, on Power Syst. , vol.15 , Issue.1 , pp. 73-80
    • Da Silva, A.M.L.1    Manso, L.A.F.2    Mello, J.C.O.3    Billinton, E.R.4
  • 19
    • 0032071144 scopus 로고    scopus 로고
    • Probabilistic evaluation of the effect of maintenance on reliability - an application
    • J. Endrenyi, G.J. Anders and A.M. Leite da Silva, "Probabilistic Evaluation of the Effect of Maintenance on Reliability - An Application", IEEE Trans, on Power Systems, Vol. 13, No. 2, pp. 576-583, May 1998. (Pubitemid 128748908)
    • (1998) IEEE Transactions on Power Systems , vol.13 , Issue.2 , pp. 576-583
    • Endrenyi, J.1    Anders, G.J.2    Leite Da Suva, A.M.3
  • 20
    • 0034186834 scopus 로고    scopus 로고
    • Cost related reliability measure for power system equipment
    • May
    • G.J. Anders and A.M. Leite da Silva, "Cost Related Reliability Measure for Power System Equipment", IEEE Trans, on PWRS, Vol. 15, No. 2, pp. 654-660, May 2000.
    • (2000) IEEE Trans, on PWRS , vol.15 , Issue.2 , pp. 654-660
    • Anders, G.J.1    Da Silva, A.M.L.2
  • 21
    • 0018544097 scopus 로고
    • IEEE reliability test system
    • IEEE Reliability Test System Task Force of the Application of Probability Methods Subcommittee, Nov./Dec.
    • IEEE Reliability Test System Task Force of the Application of Probability Methods Subcommittee, "IEEE reliability test system", IEEE Trans, on PAS., Vol. PAS-99, pp. 2047-2054, Nov./Dec. 1979.
    • (1979) IEEE Trans, on PAS. , vol.PAS-99 , pp. 2047-2054
  • 23
    • 84861390807 scopus 로고    scopus 로고
    • Generation and transmission maintenance strategies to maximize reliability and revenues
    • submitted to the
    • A.M. Leite da Silva, G.J. Anders and L.A. F. Manso "Generation and Transmission Maintenance Strategies to Maximize Reliability and Revenues", submitted to the IEEE Transactions on Power Systems.
    • IEEE Transactions on Power Systems
    • Da Silva, A.M.L.1    Anders, G.J.2    Manso, L.A.F.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.