Volumn 17, Issue 5, 2006, Pages 464-479

Designing unbalanced paced lines: A conceptual model and an experimental campaign

Author keywords

Bottleneck; Paced lines; Protective capacity

Indexed keywords

COMPUTER SIMULATION; INDUSTRIAL MANAGEMENT; MATHEMATICAL MODELS; PRODUCT DESIGN; PRODUCTIVITY; QUALITY CONTROL;

EID: 33746847689     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/09537280600764394     Document Type: Article
Times cited : (15)

References (50)
  • 1
    • 0028511861 scopus 로고
    • Does protective capacity assist managers in competing along time-based dimensions?
    • 3rd Quarter
    • Atwater, J.B. and Chakravorty, S.S., Does protective capacity assist managers in competing along time-based dimensions? Prod. Inventory Manag. J., 1994, 3rd Quarter, 53-59.
    • (1994) Prod. Inventory Manag. J , pp. 53-59
    • Atwater, J.B.1    Chakravorty, S.S.2
  • 2
    • 0003990308 scopus 로고
    • Prentice-Hall International Series in Industrial and Systems Engineering, Prentice Hall: Englewood Cliffs, NJ
    • Banks, J., Carson, J.S. and Nelson, B.L., Discrete-event system simulation. 2nd ed., 1995 (Prentice-Hall International Series in Industrial and Systems Engineering, Prentice Hall: Englewood Cliffs, NJ).
    • (1995) Discrete-event System Simulation. 2nd Ed.
    • Banks, J.1    Carson, J.S.2    Nelson, B.L.3
  • 3
    • 0035872174 scopus 로고    scopus 로고
    • Theory of constraints - A status report
    • Blackstone Jr, J.H., Theory of constraints - a status report. Int. J. Prod. Res., 2001, 39(6), 1053-1080.
    • (2001) Int. J. Prod. Res. , vol.39 , Issue.6 , pp. 1053-1080
    • Blackstone Jr., J.H.1
  • 4
    • 0036610796 scopus 로고    scopus 로고
    • Designing unbalanced lines - Understanding protective capacity and protective inventory
    • Blackstone, J.H. and Cox III, J.F., Designing unbalanced lines - understanding protective capacity and protective inventory. Prod. Plan. Control, 2002, 13(4), 416-423.
    • (2002) Prod. Plan. Control , vol.13 , Issue.4 , pp. 416-423
    • Blackstone, J.H.1    Cox III, J.F.2
  • 6
    • 0017020360 scopus 로고
    • The location of variable work stations and the performance of production flow lines
    • Carnall, C.A. and Wild, R., The location of variable work stations and the performance of production flow lines. Int. J. Prod. Res., 1976, 14(6), 703-710.
    • (1976) Int. J. Prod. Res. , vol.14 , Issue.6 , pp. 703-710
    • Carnall, C.A.1    Wild, R.2
  • 7
    • 0039594717 scopus 로고    scopus 로고
    • Improving a V-plant operation: A window manufacturing case study
    • 3rd Quarter
    • Chakravorty, S.S., Improving a V-plant operation: a window manufacturing case study. Prod. Inventory Manag. J., 2000, 3rd Quarter, 37-42.
    • (2000) Prod. Inventory Manag. J , pp. 37-42
    • Chakravorty, S.S.1
  • 8
    • 2442662902 scopus 로고    scopus 로고
    • From a reactive, heterarchical to a holonic system: An application for optimizing flow in an automotive plant
    • Charpentier, P. and Muhl, E., From a reactive, heterarchical to a holonic system: an application for optimizing flow in an automotive plant. Prod. Plan. Control, 2004, 15(2), 166-177.
    • (2004) Prod. Plan. Control , vol.15 , Issue.2 , pp. 166-177
    • Charpentier, P.1    Muhl, E.2
  • 10
    • 4444225100 scopus 로고    scopus 로고
    • Managing production capacity to improve productivity: The multiple machine case
    • Cernobbio, Italy, 17-19 May
    • Cigolini, R. and Grando, A., Managing production capacity to improve productivity: the multiple machine case, in Proceedings of the IMS International Forum, Vol. 2, Cernobbio, Italy, 17-19 May 2004, pp. 850-857.
    • (2004) Proceedings of the IMS International Forum , vol.2 , pp. 850-857
    • Cigolini, R.1    Grando, A.2
  • 11
    • 0347647939 scopus 로고    scopus 로고
    • A new dynamic look-ahead scheduling procedure for batching machines
    • Cigolini, R., Perona, M., Portioli, A. and Zambelli, T., A new dynamic look-ahead scheduling procedure for batching machines. J. Sched., 2002, 5(2), 185-204.
    • (2002) J. Sched. , vol.5 , Issue.2 , pp. 185-204
    • Cigolini, R.1    Perona, M.2    Portioli, A.3    Zambelli, T.4
  • 12
    • 4444251010 scopus 로고    scopus 로고
    • Improving productivity of automated tissue converting lines: An empirical model and a case study
    • Cigolini, R. and Rossi, T., Improving productivity of automated tissue converting lines: an empirical model and a case study. Prod. Plan. Control, 2004, 15(5), 550-563.
    • (2004) Prod. Plan. Control , vol.15 , Issue.5 , pp. 550-563
    • Cigolini, R.1    Rossi, T.2
  • 13
    • 0031362970 scopus 로고    scopus 로고
    • Total productive maintenance practices: A survey in Italy
    • Cigolini, R. and Turco, F., Total productive maintenance practices: a survey in Italy. J. Qual. Maint. Engng, 1997, 3(4), 259-272.
    • (1997) J. Qual. Maint. Engng , vol.3 , Issue.4 , pp. 259-272
    • Cigolini, R.1    Turco, F.2
  • 14
    • 0032040841 scopus 로고    scopus 로고
    • Optimizing the number of stations in assembly lines under learning for limited production
    • Cohen, Y. and Dar-El, M.E., Optimizing the number of stations in assembly lines under learning for limited production. Prod. Plan. Control, 1998, 9(3), 230-240.
    • (1998) Prod. Plan. Control , vol.9 , Issue.3 , pp. 230-240
    • Cohen, Y.1    Dar-El, M.E.2
  • 15
    • 0028403388 scopus 로고
    • A simulation comparison of traditional, JIT and TOC manufacturing systems in a flow shop with bottlenecks
    • 1st Quarter
    • Cook, D.P., A simulation comparison of traditional, JIT and TOC manufacturing systems in a flow shop with bottlenecks. Prod. Inventory Manag. J., 1994, 1st Quarter, 73-78.
    • (1994) Prod. Inventory Manag. J , pp. 73-78
    • Cook, D.P.1
  • 16
    • 0028393057 scopus 로고
    • Assembly system design principles and tradeoffs
    • Daganzo, C.F. and Blumenfeld, D.E., Assembly system design principles and tradeoffs. Int. J. Prod. Res., 1994, 32(3), 669-681.
    • (1994) Int. J. Prod. Res. , vol.32 , Issue.3 , pp. 669-681
    • Daganzo, C.F.1    Blumenfeld, D.E.2
  • 17
    • 33746830543 scopus 로고
    • Goldratt's theory of constraints: A system-level approach to continuous improvement
    • Dettmer, H.W., Goldratt's theory of constraints: a system-level approach to continuous improvement. The Qual. Manag. Forum, 1993, Fall, 3.
    • (1993) The Qual. Manag. Forum , Issue.FALL , pp. 3
    • Dettmer, H.W.1
  • 18
    • 0024767754 scopus 로고
    • Improved network based algorithms for the assembly line balancing problem
    • Easton, F., Faaland, B., Klastorin, T.D. and Schmitt, T., Improved network based algorithms for the assembly line balancing problem. Int. J. Prod. Res., 1989, 27, 1901-1915.
    • (1989) Int. J. Prod. Res. , vol.27 , pp. 1901-1915
    • Easton, F.1    Faaland, B.2    Klastorin, T.D.3    Schmitt, T.4
  • 19
    • 0018297571 scopus 로고
    • The efficiency of balanced and unbalanced production lines
    • El-Rayah, T.E., The efficiency of balanced and unbalanced production lines. Int. J. Prod. Res., 1979, 17(1), 61-75.
    • (1979) Int. J. Prod. Res. , vol.17 , Issue.1 , pp. 61-75
    • El-Rayah, T.E.1
  • 20
    • 0032117097 scopus 로고    scopus 로고
    • A survey of the assembly line balancing procedures
    • Erel, E. and Sarin, S.C., A survey of the assembly line balancing procedures. Prod. Plan. Control, 1998, 9(5), 414-434.
    • (1998) Prod. Plan. Control , vol.9 , Issue.5 , pp. 414-434
    • Erel, E.1    Sarin, S.C.2
  • 21
    • 0027589698 scopus 로고
    • Capacity allocation strategies in a hypothetical job-shop
    • Fry, T.D. and Russell, G.R., Capacity allocation strategies in a hypothetical job-shop. Int. J. Prod. Res., 1993, 31(5), 1097-1115.
    • (1993) Int. J. Prod. Res. , vol.31 , Issue.5 , pp. 1097-1115
    • Fry, T.D.1    Russell, G.R.2
  • 22
    • 0024641634 scopus 로고
    • A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
    • Ghosh, S. and Gagnon, R.J., A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. Int. J. Prod. Res., 1989, 27(4), 637-670.
    • (1989) Int. J. Prod. Res. , vol.27 , Issue.4 , pp. 637-670
    • Ghosh, S.1    Gagnon, R.J.2
  • 23
    • 0030785015 scopus 로고    scopus 로고
    • A goal programming approach to mixed-model assembly line balancing problem
    • Gokcen, H. and Erel, E., A goal programming approach to mixed-model assembly line balancing problem. Int. J. Prod. Econ., 1997, 48, 177-185.
    • (1997) Int. J. Prod. Econ. , vol.48 , pp. 177-185
    • Gokcen, H.1    Erel, E.2
  • 24
    • 33746808294 scopus 로고    scopus 로고
    • Plant capacity and productivity; measurement and improvement techniques - Part I: Conceptual framework and a single-machine case. Politecnico di Milano
    • Grando, A. and Turco, F., Plant capacity and productivity; measurement and improvement techniques - Part I: conceptual framework and a single-machine case. Politecnico di Milano, DEP Research Report, No. 17, 1998a.
    • (1998) DEP Research Report, No. 17 , vol.17
    • Grando, A.1    Turco, F.2
  • 25
    • 33746861272 scopus 로고    scopus 로고
    • Plant capacity and productivity; measurement and improvement techniques - Part II; capacity and utilization indexes in multiple-machine systems. Politecnico di Milano
    • Grando, A. and Turco, F., Plant capacity and productivity; measurement and improvement techniques - Part II; capacity and utilization indexes in multiple-machine systems. Politecnico di Milano, DEP Research Report, No. 18, 1998b.
    • (1998) DEP Research Report, No. 18 , vol.18
    • Grando, A.1    Turco, F.2
  • 26
    • 0003710588 scopus 로고
    • North River Press: Croton-on-Hudson, NY
    • Goldratt, E.M. and Fox, R.E., The Race, 1986 (North River Press: Croton-on-Hudson, NY).
    • (1986) The Race
    • Goldratt, E.M.1    Fox, R.E.2
  • 27
    • 0018509376 scopus 로고
    • On the optimal allocation of work in symmetrically unbalanced production line systems with variable operation times
    • Hillier, F.S. and Boling, R.W., On the optimal allocation of work in symmetrically unbalanced production line systems with variable operation times. Manag. Sci., 1979, 25(8), 721-727.
    • (1979) Manag. Sci. , vol.25 , Issue.8 , pp. 721-727
    • Hillier, F.S.1    Boling, R.W.2
  • 29
    • 0033888501 scopus 로고    scopus 로고
    • A study on the effect of the extent and location of protective capacity in flow systems
    • Kadipasaoglu, S.N., Xiang, W., Hurley, S.F. and Khumawala, B.M., A study on the effect of the extent and location of protective capacity in flow systems. Int. J. Prod. Econ., 2000, 63, 217-228.
    • (2000) Int. J. Prod. Econ. , vol.63 , pp. 217-228
    • Kadipasaoglu, S.N.1    Xiang, W.2    Hurley, S.F.3    Khumawala, B.M.4
  • 30
    • 0142258726 scopus 로고    scopus 로고
    • An investigation of output flow control, bottleneck flow control and dynamic flow control mechanisms in various simple lines scenarios
    • Kim, S., Davis, K.R. and Cox, III, J.F., An investigation of output flow control, bottleneck flow control and dynamic flow control mechanisms in various simple lines scenarios. Prod. Plan. Control, 2003, 14(1), 15-32.
    • (2003) Prod. Plan. Control , vol.14 , Issue.1 , pp. 15-32
    • Kim, S.1    Davis, K.R.2    Cox III, J.F.3
  • 31
    • 0034588691 scopus 로고    scopus 로고
    • Balancing and sequencing mixed-model U-lines with a co-evolutionary algorithm
    • Kim, Y.K., Kim, S.J. and Kim, J.K., Balancing and sequencing mixed-model U-lines with a co-evolutionary algorithm. Prod. Plan. Control, 2000a, 11(8), 754-764.
    • (2000) Prod. Plan. Control , vol.11 , Issue.8 , pp. 754-764
    • Kim, Y.K.1    Kim, S.J.2    Kim, J.K.3
  • 32
    • 0033993174 scopus 로고    scopus 로고
    • Two-sided line balancing: A genetic algorithm approach
    • Kim, Y.K., Kim, Y. and Kim, Y.J., Two-sided line balancing: a genetic algorithm approach. Prod. Plan. Control, 2000b, 11(1), 44-53.
    • (2000) Prod. Plan. Control , vol.11 , Issue.1 , pp. 44-53
    • Kim, Y.K.1    Kim, Y.2    Kim, Y.J.3
  • 33
    • 0036941876 scopus 로고    scopus 로고
    • Timed-based goal chasing method for mixed-model assembly line problem with multiple work stations
    • Kurashige, K., Yanagawa, Y., Miyazaki, S. and Kameyama, Y., Timed-based goal chasing method for mixed-model assembly line problem with multiple work stations. Prod. Plan. Control, 2002, 13(8), 735-745.
    • (2002) Prod. Plan. Control , vol.13 , Issue.8 , pp. 735-745
    • Kurashige, K.1    Yanagawa, Y.2    Miyazaki, S.3    Kameyama, Y.4
  • 34
    • 2442464909 scopus 로고    scopus 로고
    • An algorithm of performance evaluation for mould development
    • Huang, J.M. and Chen, K.S., An algorithm of performance evaluation for mould development. Prod. Plan. Control, 2004, 15(1), 55-62.
    • (2004) Prod. Plan. Control , vol.15 , Issue.1 , pp. 55-62
    • Huang, J.M.1    Chen, K.S.2
  • 35
    • 0036658173 scopus 로고    scopus 로고
    • Multi-selection electronic assembly line balancing problems: A case study
    • Liu, C.M. and Chen, C.H., Multi-selection electronic assembly line balancing problems: a case study. Prod. Plan. Control, 2002, 13(5), 451-461.
    • (2002) Prod. Plan. Control , vol.13 , Issue.5 , pp. 451-461
    • Liu, C.M.1    Chen, C.H.2
  • 36
    • 0034628952 scopus 로고    scopus 로고
    • Scheduling unbalanced cellular manufacturing systems with lot splitting
    • Lockwood, W.T., Mahmoodi, F., Ruben, R.A. and Mosier, C.T., Scheduling unbalanced cellular manufacturing systems with lot splitting. Int. J. Prod. Res., 2000, 38(4), 951-965.
    • (2000) Int. J. Prod. Res. , vol.38 , Issue.4 , pp. 951-965
    • Lockwood, W.T.1    Mahmoodi, F.2    Ruben, R.A.3    Mosier, C.T.4
  • 37
    • 0343898023 scopus 로고    scopus 로고
    • Measuring maintenance performance - In search for a maintenance productivity index
    • Lofsten, H., Measuring maintenance performance - in search for a maintenance productivity index. Inr. J. Prod. Econ., 2000, 63, 47-58.
    • (2000) Inr. J. Prod. Econ. , vol.63 , pp. 47-58
    • Lofsten, H.1
  • 39
    • 0028436792 scopus 로고
    • Evaluating variance control, order review/release and dispatching: A regression analysis
    • Melnyk, S.A., Tan, K.C., Denzler, D.R. and Fredendall, L., Evaluating variance control, order review/release and dispatching: a regression analysis. Int. J. Prod. Res., 1994, 32(5), 1045-1061.
    • (1994) Int. J. Prod. Res. , vol.32 , Issue.5 , pp. 1045-1061
    • Melnyk, S.A.1    Tan, K.C.2    Denzler, D.R.3    Fredendall, L.4
  • 40
    • 0032643432 scopus 로고    scopus 로고
    • Balancing and sequencing manual mixed-model assembly lines
    • Merengo, C., Nava, F. and Pozzetti, A., Balancing and sequencing manual mixed-model assembly lines. Int. J. Prod. Res., 1999, 37(12), 2835-2860.
    • (1999) Int. J. Prod. Res. , vol.37 , Issue.12 , pp. 2835-2860
    • Merengo, C.1    Nava, F.2    Pozzetti, A.3
  • 42
    • 2442493185 scopus 로고    scopus 로고
    • An efficient model for multifamily lot-sizing and scheduling: Application to a real life problem
    • Mohamed, Z.M., Youssef, M.A. and Huq, F., An efficient model for multifamily lot-sizing and scheduling: application to a real life problem. Prod. Plan. Control, 2004, 15(1), 90-101.
    • (2004) Prod. Plan. Control , vol.15 , Issue.1 , pp. 90-101
    • Youssef, M.A.1    Huq, F.2
  • 44
    • 0031257204 scopus 로고    scopus 로고
    • Line balancing techniques as used for just-in-time (JIT) product line optimization
    • Plenert, G., Line balancing techniques as used for just-in-time (JIT) product line optimization. Prod. Plan. Control, 1997, 8(7), 686-693.
    • (1997) Prod. Plan. Control , vol.8 , Issue.7 , pp. 686-693
    • Plenert, G.1
  • 45
    • 0005355722 scopus 로고
    • Optimal utilization of a finite capacity integrated assembly system
    • Pourbabai, B., Optimal utilization of a finite capacity integrated assembly system. Int. J. Prod. Res., 1990, 28(2), 337-352.
    • (1990) Int. J. Prod. Res. , vol.28 , Issue.2 , pp. 337-352
    • Pourbabai, B.1
  • 46
    • 0016974623 scopus 로고
    • A generalization of the 'bowl phenomenon' in series production systems
    • Rao, N.P., A generalization of the 'bowl phenomenon' in series production systems. Int. J. Prod. Res., 1976, 14(4), 437-443.
    • (1976) Int. J. Prod. Res. , vol.14 , Issue.4 , pp. 437-443
    • Rao, N.P.1
  • 47
    • 84923740913 scopus 로고    scopus 로고
    • Total Productive Maintenance (TPM)
    • Roberts, J., Total Productive Maintenance (TPM). Technology Interface, 1997, Fall, Vol. 2. Available online at http:// engr.nmsu.edu/~etti/fall97/manufacturing/tpm2.html.
    • (1997) Technology Interface , vol.2 , Issue.FALL
    • Roberts, J.1
  • 48
    • 0022698734 scopus 로고
    • A cost based methodology for stochastic line balancing with intermittent line stop-pages
    • Silverman, F.N. and Carter, J.C., A cost based methodology for stochastic line balancing with intermittent line stop-pages. Manag. Sci., 1986, 32(4), 455-463.
    • (1986) Manag. Sci. , vol.32 , Issue.4 , pp. 455-463
    • Silverman, F.N.1    Carter, J.C.2
  • 49
    • 0036507643 scopus 로고    scopus 로고
    • Sequencing mixed model assembly lines for a Just-in-time production systems
    • Ventura, J.A. and Radhakrishnan, S., Sequencing mixed model assembly lines for a Just-In-Time production systems. Prod. Plan. Control, 2002, 13(2), 199-210.
    • (2002) Prod. Plan. Control , vol.13 , Issue.2 , pp. 199-210
    • Ventura, J.A.1    Radhakrishnan, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.