-
1
-
-
0028511861
-
Does protective capacity assist managers in competing along time-based dimensions?
-
3rd Quarter
-
Atwater, J.B. and Chakravorty, S.S., Does protective capacity assist managers in competing along time-based dimensions? Prod. Inventory Manag. J., 1994, 3rd Quarter, 53-59.
-
(1994)
Prod. Inventory Manag. J
, pp. 53-59
-
-
Atwater, J.B.1
Chakravorty, S.S.2
-
2
-
-
0003990308
-
-
Prentice-Hall International Series in Industrial and Systems Engineering, Prentice Hall: Englewood Cliffs, NJ
-
Banks, J., Carson, J.S. and Nelson, B.L., Discrete-event system simulation. 2nd ed., 1995 (Prentice-Hall International Series in Industrial and Systems Engineering, Prentice Hall: Englewood Cliffs, NJ).
-
(1995)
Discrete-event System Simulation. 2nd Ed.
-
-
Banks, J.1
Carson, J.S.2
Nelson, B.L.3
-
3
-
-
0035872174
-
Theory of constraints - A status report
-
Blackstone Jr, J.H., Theory of constraints - a status report. Int. J. Prod. Res., 2001, 39(6), 1053-1080.
-
(2001)
Int. J. Prod. Res.
, vol.39
, Issue.6
, pp. 1053-1080
-
-
Blackstone Jr., J.H.1
-
4
-
-
0036610796
-
Designing unbalanced lines - Understanding protective capacity and protective inventory
-
Blackstone, J.H. and Cox III, J.F., Designing unbalanced lines - understanding protective capacity and protective inventory. Prod. Plan. Control, 2002, 13(4), 416-423.
-
(2002)
Prod. Plan. Control
, vol.13
, Issue.4
, pp. 416-423
-
-
Blackstone, J.H.1
Cox III, J.F.2
-
5
-
-
33746811503
-
Capable-to-promise: The challenge to the planning closet-loop
-
Orlando, FL, 30th July-2nd August
-
Caridi, M. and Sianesi, A., Capable-to-promise: the challenge to the planning closet-loop, in Proceedings of the 4th International Conference on Engineering Design and Automation, Orlando, FL, 30th July-2nd August 2000, pp. 234-239.
-
(2000)
Proceedings of the 4th International Conference on Engineering Design and Automation
, pp. 234-239
-
-
Caridi, M.1
Sianesi, A.2
-
6
-
-
0017020360
-
The location of variable work stations and the performance of production flow lines
-
Carnall, C.A. and Wild, R., The location of variable work stations and the performance of production flow lines. Int. J. Prod. Res., 1976, 14(6), 703-710.
-
(1976)
Int. J. Prod. Res.
, vol.14
, Issue.6
, pp. 703-710
-
-
Carnall, C.A.1
Wild, R.2
-
7
-
-
0039594717
-
Improving a V-plant operation: A window manufacturing case study
-
3rd Quarter
-
Chakravorty, S.S., Improving a V-plant operation: a window manufacturing case study. Prod. Inventory Manag. J., 2000, 3rd Quarter, 37-42.
-
(2000)
Prod. Inventory Manag. J
, pp. 37-42
-
-
Chakravorty, S.S.1
-
8
-
-
2442662902
-
From a reactive, heterarchical to a holonic system: An application for optimizing flow in an automotive plant
-
Charpentier, P. and Muhl, E., From a reactive, heterarchical to a holonic system: an application for optimizing flow in an automotive plant. Prod. Plan. Control, 2004, 15(2), 166-177.
-
(2004)
Prod. Plan. Control
, vol.15
, Issue.2
, pp. 166-177
-
-
Charpentier, P.1
Muhl, E.2
-
9
-
-
0004083533
-
-
McGraw-Hill Irvin: New York
-
Chase, R.B., Aquilano, N.J. and Jacobs, F.R., Production and Operations Managements - Manufacturing and Services, 9th ed., 2001 (McGraw-Hill Irvin: New York).
-
(2001)
Production and Operations Managements - Manufacturing and Services, 9th Ed.
-
-
Chase, R.B.1
Aquilano, N.J.2
Jacobs, F.R.3
-
10
-
-
4444225100
-
Managing production capacity to improve productivity: The multiple machine case
-
Cernobbio, Italy, 17-19 May
-
Cigolini, R. and Grando, A., Managing production capacity to improve productivity: the multiple machine case, in Proceedings of the IMS International Forum, Vol. 2, Cernobbio, Italy, 17-19 May 2004, pp. 850-857.
-
(2004)
Proceedings of the IMS International Forum
, vol.2
, pp. 850-857
-
-
Cigolini, R.1
Grando, A.2
-
11
-
-
0347647939
-
A new dynamic look-ahead scheduling procedure for batching machines
-
Cigolini, R., Perona, M., Portioli, A. and Zambelli, T., A new dynamic look-ahead scheduling procedure for batching machines. J. Sched., 2002, 5(2), 185-204.
-
(2002)
J. Sched.
, vol.5
, Issue.2
, pp. 185-204
-
-
Cigolini, R.1
Perona, M.2
Portioli, A.3
Zambelli, T.4
-
12
-
-
4444251010
-
Improving productivity of automated tissue converting lines: An empirical model and a case study
-
Cigolini, R. and Rossi, T., Improving productivity of automated tissue converting lines: an empirical model and a case study. Prod. Plan. Control, 2004, 15(5), 550-563.
-
(2004)
Prod. Plan. Control
, vol.15
, Issue.5
, pp. 550-563
-
-
Cigolini, R.1
Rossi, T.2
-
13
-
-
0031362970
-
Total productive maintenance practices: A survey in Italy
-
Cigolini, R. and Turco, F., Total productive maintenance practices: a survey in Italy. J. Qual. Maint. Engng, 1997, 3(4), 259-272.
-
(1997)
J. Qual. Maint. Engng
, vol.3
, Issue.4
, pp. 259-272
-
-
Cigolini, R.1
Turco, F.2
-
14
-
-
0032040841
-
Optimizing the number of stations in assembly lines under learning for limited production
-
Cohen, Y. and Dar-El, M.E., Optimizing the number of stations in assembly lines under learning for limited production. Prod. Plan. Control, 1998, 9(3), 230-240.
-
(1998)
Prod. Plan. Control
, vol.9
, Issue.3
, pp. 230-240
-
-
Cohen, Y.1
Dar-El, M.E.2
-
15
-
-
0028403388
-
A simulation comparison of traditional, JIT and TOC manufacturing systems in a flow shop with bottlenecks
-
1st Quarter
-
Cook, D.P., A simulation comparison of traditional, JIT and TOC manufacturing systems in a flow shop with bottlenecks. Prod. Inventory Manag. J., 1994, 1st Quarter, 73-78.
-
(1994)
Prod. Inventory Manag. J
, pp. 73-78
-
-
Cook, D.P.1
-
16
-
-
0028393057
-
Assembly system design principles and tradeoffs
-
Daganzo, C.F. and Blumenfeld, D.E., Assembly system design principles and tradeoffs. Int. J. Prod. Res., 1994, 32(3), 669-681.
-
(1994)
Int. J. Prod. Res.
, vol.32
, Issue.3
, pp. 669-681
-
-
Daganzo, C.F.1
Blumenfeld, D.E.2
-
17
-
-
33746830543
-
Goldratt's theory of constraints: A system-level approach to continuous improvement
-
Dettmer, H.W., Goldratt's theory of constraints: a system-level approach to continuous improvement. The Qual. Manag. Forum, 1993, Fall, 3.
-
(1993)
The Qual. Manag. Forum
, Issue.FALL
, pp. 3
-
-
Dettmer, H.W.1
-
18
-
-
0024767754
-
Improved network based algorithms for the assembly line balancing problem
-
Easton, F., Faaland, B., Klastorin, T.D. and Schmitt, T., Improved network based algorithms for the assembly line balancing problem. Int. J. Prod. Res., 1989, 27, 1901-1915.
-
(1989)
Int. J. Prod. Res.
, vol.27
, pp. 1901-1915
-
-
Easton, F.1
Faaland, B.2
Klastorin, T.D.3
Schmitt, T.4
-
19
-
-
0018297571
-
The efficiency of balanced and unbalanced production lines
-
El-Rayah, T.E., The efficiency of balanced and unbalanced production lines. Int. J. Prod. Res., 1979, 17(1), 61-75.
-
(1979)
Int. J. Prod. Res.
, vol.17
, Issue.1
, pp. 61-75
-
-
El-Rayah, T.E.1
-
20
-
-
0032117097
-
A survey of the assembly line balancing procedures
-
Erel, E. and Sarin, S.C., A survey of the assembly line balancing procedures. Prod. Plan. Control, 1998, 9(5), 414-434.
-
(1998)
Prod. Plan. Control
, vol.9
, Issue.5
, pp. 414-434
-
-
Erel, E.1
Sarin, S.C.2
-
21
-
-
0027589698
-
Capacity allocation strategies in a hypothetical job-shop
-
Fry, T.D. and Russell, G.R., Capacity allocation strategies in a hypothetical job-shop. Int. J. Prod. Res., 1993, 31(5), 1097-1115.
-
(1993)
Int. J. Prod. Res.
, vol.31
, Issue.5
, pp. 1097-1115
-
-
Fry, T.D.1
Russell, G.R.2
-
22
-
-
0024641634
-
A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
-
Ghosh, S. and Gagnon, R.J., A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. Int. J. Prod. Res., 1989, 27(4), 637-670.
-
(1989)
Int. J. Prod. Res.
, vol.27
, Issue.4
, pp. 637-670
-
-
Ghosh, S.1
Gagnon, R.J.2
-
23
-
-
0030785015
-
A goal programming approach to mixed-model assembly line balancing problem
-
Gokcen, H. and Erel, E., A goal programming approach to mixed-model assembly line balancing problem. Int. J. Prod. Econ., 1997, 48, 177-185.
-
(1997)
Int. J. Prod. Econ.
, vol.48
, pp. 177-185
-
-
Gokcen, H.1
Erel, E.2
-
24
-
-
33746808294
-
Plant capacity and productivity; measurement and improvement techniques - Part I: Conceptual framework and a single-machine case. Politecnico di Milano
-
Grando, A. and Turco, F., Plant capacity and productivity; measurement and improvement techniques - Part I: conceptual framework and a single-machine case. Politecnico di Milano, DEP Research Report, No. 17, 1998a.
-
(1998)
DEP Research Report, No. 17
, vol.17
-
-
Grando, A.1
Turco, F.2
-
25
-
-
33746861272
-
Plant capacity and productivity; measurement and improvement techniques - Part II; capacity and utilization indexes in multiple-machine systems. Politecnico di Milano
-
Grando, A. and Turco, F., Plant capacity and productivity; measurement and improvement techniques - Part II; capacity and utilization indexes in multiple-machine systems. Politecnico di Milano, DEP Research Report, No. 18, 1998b.
-
(1998)
DEP Research Report, No. 18
, vol.18
-
-
Grando, A.1
Turco, F.2
-
26
-
-
0003710588
-
-
North River Press: Croton-on-Hudson, NY
-
Goldratt, E.M. and Fox, R.E., The Race, 1986 (North River Press: Croton-on-Hudson, NY).
-
(1986)
The Race
-
-
Goldratt, E.M.1
Fox, R.E.2
-
27
-
-
0018509376
-
On the optimal allocation of work in symmetrically unbalanced production line systems with variable operation times
-
Hillier, F.S. and Boling, R.W., On the optimal allocation of work in symmetrically unbalanced production line systems with variable operation times. Manag. Sci., 1979, 25(8), 721-727.
-
(1979)
Manag. Sci.
, vol.25
, Issue.8
, pp. 721-727
-
-
Hillier, F.S.1
Boling, R.W.2
-
29
-
-
0033888501
-
A study on the effect of the extent and location of protective capacity in flow systems
-
Kadipasaoglu, S.N., Xiang, W., Hurley, S.F. and Khumawala, B.M., A study on the effect of the extent and location of protective capacity in flow systems. Int. J. Prod. Econ., 2000, 63, 217-228.
-
(2000)
Int. J. Prod. Econ.
, vol.63
, pp. 217-228
-
-
Kadipasaoglu, S.N.1
Xiang, W.2
Hurley, S.F.3
Khumawala, B.M.4
-
30
-
-
0142258726
-
An investigation of output flow control, bottleneck flow control and dynamic flow control mechanisms in various simple lines scenarios
-
Kim, S., Davis, K.R. and Cox, III, J.F., An investigation of output flow control, bottleneck flow control and dynamic flow control mechanisms in various simple lines scenarios. Prod. Plan. Control, 2003, 14(1), 15-32.
-
(2003)
Prod. Plan. Control
, vol.14
, Issue.1
, pp. 15-32
-
-
Kim, S.1
Davis, K.R.2
Cox III, J.F.3
-
31
-
-
0034588691
-
Balancing and sequencing mixed-model U-lines with a co-evolutionary algorithm
-
Kim, Y.K., Kim, S.J. and Kim, J.K., Balancing and sequencing mixed-model U-lines with a co-evolutionary algorithm. Prod. Plan. Control, 2000a, 11(8), 754-764.
-
(2000)
Prod. Plan. Control
, vol.11
, Issue.8
, pp. 754-764
-
-
Kim, Y.K.1
Kim, S.J.2
Kim, J.K.3
-
32
-
-
0033993174
-
Two-sided line balancing: A genetic algorithm approach
-
Kim, Y.K., Kim, Y. and Kim, Y.J., Two-sided line balancing: a genetic algorithm approach. Prod. Plan. Control, 2000b, 11(1), 44-53.
-
(2000)
Prod. Plan. Control
, vol.11
, Issue.1
, pp. 44-53
-
-
Kim, Y.K.1
Kim, Y.2
Kim, Y.J.3
-
33
-
-
0036941876
-
Timed-based goal chasing method for mixed-model assembly line problem with multiple work stations
-
Kurashige, K., Yanagawa, Y., Miyazaki, S. and Kameyama, Y., Timed-based goal chasing method for mixed-model assembly line problem with multiple work stations. Prod. Plan. Control, 2002, 13(8), 735-745.
-
(2002)
Prod. Plan. Control
, vol.13
, Issue.8
, pp. 735-745
-
-
Kurashige, K.1
Yanagawa, Y.2
Miyazaki, S.3
Kameyama, Y.4
-
34
-
-
2442464909
-
An algorithm of performance evaluation for mould development
-
Huang, J.M. and Chen, K.S., An algorithm of performance evaluation for mould development. Prod. Plan. Control, 2004, 15(1), 55-62.
-
(2004)
Prod. Plan. Control
, vol.15
, Issue.1
, pp. 55-62
-
-
Huang, J.M.1
Chen, K.S.2
-
35
-
-
0036658173
-
Multi-selection electronic assembly line balancing problems: A case study
-
Liu, C.M. and Chen, C.H., Multi-selection electronic assembly line balancing problems: a case study. Prod. Plan. Control, 2002, 13(5), 451-461.
-
(2002)
Prod. Plan. Control
, vol.13
, Issue.5
, pp. 451-461
-
-
Liu, C.M.1
Chen, C.H.2
-
36
-
-
0034628952
-
Scheduling unbalanced cellular manufacturing systems with lot splitting
-
Lockwood, W.T., Mahmoodi, F., Ruben, R.A. and Mosier, C.T., Scheduling unbalanced cellular manufacturing systems with lot splitting. Int. J. Prod. Res., 2000, 38(4), 951-965.
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.4
, pp. 951-965
-
-
Lockwood, W.T.1
Mahmoodi, F.2
Ruben, R.A.3
Mosier, C.T.4
-
37
-
-
0343898023
-
Measuring maintenance performance - In search for a maintenance productivity index
-
Lofsten, H., Measuring maintenance performance - in search for a maintenance productivity index. Inr. J. Prod. Econ., 2000, 63, 47-58.
-
(2000)
Inr. J. Prod. Econ.
, vol.63
, pp. 47-58
-
-
Lofsten, H.1
-
38
-
-
0012240170
-
Variance control vs. dispatching efficiency
-
Melnyk, S.A., Denzler, D.R. and Fredendall, L., Variance control vs. dispatching efficiency. Prod. Inventory Manag., 1992, 33, 6-13.
-
(1992)
Prod. Inventory Manag.
, vol.33
, pp. 6-13
-
-
Melnyk, S.A.1
Denzler, D.R.2
Fredendall, L.3
-
39
-
-
0028436792
-
Evaluating variance control, order review/release and dispatching: A regression analysis
-
Melnyk, S.A., Tan, K.C., Denzler, D.R. and Fredendall, L., Evaluating variance control, order review/release and dispatching: a regression analysis. Int. J. Prod. Res., 1994, 32(5), 1045-1061.
-
(1994)
Int. J. Prod. Res.
, vol.32
, Issue.5
, pp. 1045-1061
-
-
Melnyk, S.A.1
Tan, K.C.2
Denzler, D.R.3
Fredendall, L.4
-
40
-
-
0032643432
-
Balancing and sequencing manual mixed-model assembly lines
-
Merengo, C., Nava, F. and Pozzetti, A., Balancing and sequencing manual mixed-model assembly lines. Int. J. Prod. Res., 1999, 37(12), 2835-2860.
-
(1999)
Int. J. Prod. Res.
, vol.37
, Issue.12
, pp. 2835-2860
-
-
Merengo, C.1
Nava, F.2
Pozzetti, A.3
-
41
-
-
0012684306
-
Productivity as a performance measure
-
Misterek, S.D.A., Dooley, K.J. and Anderson, J.C., Productivity as a performance measure. Int. J. Prod. Manag., 1992, 12(1), 29-45.
-
(1992)
Int. J. Prod. Manag.
, vol.12
, Issue.1
, pp. 29-45
-
-
Misterek, S.D.A.1
Dooley, K.J.2
Anderson, J.C.3
-
42
-
-
2442493185
-
An efficient model for multifamily lot-sizing and scheduling: Application to a real life problem
-
Mohamed, Z.M., Youssef, M.A. and Huq, F., An efficient model for multifamily lot-sizing and scheduling: application to a real life problem. Prod. Plan. Control, 2004, 15(1), 90-101.
-
(2004)
Prod. Plan. Control
, vol.15
, Issue.1
, pp. 90-101
-
-
Youssef, M.A.1
Huq, F.2
-
44
-
-
0031257204
-
Line balancing techniques as used for just-in-time (JIT) product line optimization
-
Plenert, G., Line balancing techniques as used for just-in-time (JIT) product line optimization. Prod. Plan. Control, 1997, 8(7), 686-693.
-
(1997)
Prod. Plan. Control
, vol.8
, Issue.7
, pp. 686-693
-
-
Plenert, G.1
-
45
-
-
0005355722
-
Optimal utilization of a finite capacity integrated assembly system
-
Pourbabai, B., Optimal utilization of a finite capacity integrated assembly system. Int. J. Prod. Res., 1990, 28(2), 337-352.
-
(1990)
Int. J. Prod. Res.
, vol.28
, Issue.2
, pp. 337-352
-
-
Pourbabai, B.1
-
46
-
-
0016974623
-
A generalization of the 'bowl phenomenon' in series production systems
-
Rao, N.P., A generalization of the 'bowl phenomenon' in series production systems. Int. J. Prod. Res., 1976, 14(4), 437-443.
-
(1976)
Int. J. Prod. Res.
, vol.14
, Issue.4
, pp. 437-443
-
-
Rao, N.P.1
-
47
-
-
84923740913
-
Total Productive Maintenance (TPM)
-
Roberts, J., Total Productive Maintenance (TPM). Technology Interface, 1997, Fall, Vol. 2. Available online at http:// engr.nmsu.edu/~etti/fall97/manufacturing/tpm2.html.
-
(1997)
Technology Interface
, vol.2
, Issue.FALL
-
-
Roberts, J.1
-
48
-
-
0022698734
-
A cost based methodology for stochastic line balancing with intermittent line stop-pages
-
Silverman, F.N. and Carter, J.C., A cost based methodology for stochastic line balancing with intermittent line stop-pages. Manag. Sci., 1986, 32(4), 455-463.
-
(1986)
Manag. Sci.
, vol.32
, Issue.4
, pp. 455-463
-
-
Silverman, F.N.1
Carter, J.C.2
-
49
-
-
0036507643
-
Sequencing mixed model assembly lines for a Just-in-time production systems
-
Ventura, J.A. and Radhakrishnan, S., Sequencing mixed model assembly lines for a Just-In-Time production systems. Prod. Plan. Control, 2002, 13(2), 199-210.
-
(2002)
Prod. Plan. Control
, vol.13
, Issue.2
, pp. 199-210
-
-
Ventura, J.A.1
Radhakrishnan, S.2
|