메뉴 건너뛰기




Volumn 47, Issue , 2012, Pages 9-20

Analytical performance monitoring of a 142.5kW p grid-connected rooftop BIPV system in Singapore

Author keywords

BIPV; Performance Ratio; Solar energy; Tropics; Zero energy building

Indexed keywords

ANALYTICAL PERFORMANCE; ARRAY EFFICIENCY; BIPV; BUILDING-INTEGRATED PHOTOVOLTAICS; ELECTRICITY GENERATORS; ENERGY TARGETS; GRID-CONNECTED; IEC STANDARDS; INVERTER EFFICIENCY; IRRADIANCE LEVEL; IRRADIANCE MEASUREMENT; PERFORMANCE ANALYSIS; PERFORMANCE ASSESSMENT; PERFORMANCE RATIO; PV MODULE TEMPERATURE; PV MODULES; PYRANOMETERS; SINGAPORE; SYSTEM LOSS; TEMPORAL CHANGE;

EID: 84860570081     PISSN: 09601481     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.renene.2012.03.034     Document Type: Article
Times cited : (141)

References (14)
  • 1
    • 84861697098 scopus 로고    scopus 로고
    • http://www.singstat.gov.sg/pubn/reference/yos10/yos2010.pdf.
  • 2
    • 85067757164 scopus 로고    scopus 로고
    • BIPV design for Singapore zero-energy building
    • In: PLEA 2008, 25th conference on passive and low energy architecture, Dublin; 22nd to 24th October
    • Wittkopf SK, Pandey A, Seng AK, Poh P. BIPV design for Singapore zero-energy building. In: PLEA 2008, 25th conference on passive and low energy architecture, Dublin; 22nd to 24th October 2008.
    • (2008)
    • Wittkopf, S.K.1    Pandey, A.2    Seng, A.K.3    Poh, P.4
  • 5
    • 33847674445 scopus 로고    scopus 로고
    • Performance results and analysis of a 3 kW grid-connected PV systems
    • So J.H., Jung Y.S., Yu G.J., Choib J.Y., Choi J.H. Performance results and analysis of a 3 kW grid-connected PV systems. Renew Energy 2007, 32:1858-1872.
    • (2007) Renew Energy , vol.32 , pp. 1858-1872
    • So, J.H.1    Jung, Y.S.2    Yu, G.J.3    Choib, J.Y.4    Choi, J.H.5
  • 6
    • 0027644443 scopus 로고
    • Prediction and effective yield of a 100kW grid connected PV installation
    • Clavedatscher L., Nordmann T.H. Prediction and effective yield of a 100kW grid connected PV installation. Solar Energy 1993, 51:101-107.
    • (1993) Solar Energy , vol.51 , pp. 101-107
    • Clavedatscher, L.1    Nordmann, T.H.2
  • 7
    • 33751397228 scopus 로고    scopus 로고
    • Performance evaluation of a 10 kWp PV power system prototype for isolated building in Thailand
    • Sasitharanuwat A., Rakwichian W., Ketjoy N., Yammen S. Performance evaluation of a 10 kWp PV power system prototype for isolated building in Thailand. Renew Energy 2006, 32:1288-1300.
    • (2006) Renew Energy , vol.32 , pp. 1288-1300
    • Sasitharanuwat, A.1    Rakwichian, W.2    Ketjoy, N.3    Yammen, S.4
  • 8
    • 27944505197 scopus 로고    scopus 로고
    • Performance parameters for grid-connected pv systems
    • NREL/CP-520-37358, 31 IEEE photovoltaics specialists conference and exhibition
    • Marion B, Adelstein J, Boyle K, Hayden H, Hammond B, Fletcher T, et al. Performance parameters for grid-connected pv systems. NREL/CP-520-37358, 31 IEEE photovoltaics specialists conference and exhibition; 2005.
    • (2005)
    • Marion, B.1    Adelstein, J.2    Boyle, K.3    Hayden, H.4    Hammond, B.5    Fletcher, T.6
  • 9
    • 0043205829 scopus 로고    scopus 로고
    • Partial shadowing of photovoltaic arrays with different system configurations: literature review and field test results
    • Woyte A., Nijs J., Belmans R. Partial shadowing of photovoltaic arrays with different system configurations: literature review and field test results. Solar Energy 2003, 74:217-233.
    • (2003) Solar Energy , vol.74 , pp. 217-233
    • Woyte, A.1    Nijs, J.2    Belmans, R.3
  • 12
    • 0032436112 scopus 로고    scopus 로고
    • Building integrated photovoltaics: a Korean case study
    • Yoo S.H., Lee E.T., Lee J.K. Building integrated photovoltaics: a Korean case study. Solar Energy 1998, 64:151-161.
    • (1998) Solar Energy , vol.64 , pp. 151-161
    • Yoo, S.H.1    Lee, E.T.2    Lee, J.K.3
  • 13
    • 24644481566 scopus 로고    scopus 로고
    • Performance of a 500 kWp grid connected photovoltaic system at Mae Hong Son Province, Thailand
    • Chokmaviroj S., Wattanapong R., Suchart Y. Performance of a 500 kWp grid connected photovoltaic system at Mae Hong Son Province, Thailand. Renew Energy 2005, 31:19-28.
    • (2005) Renew Energy , vol.31 , pp. 19-28
    • Chokmaviroj, S.1    Wattanapong, R.2    Suchart, Y.3
  • 14
    • 34249794869 scopus 로고    scopus 로고
    • Comparison of photovoltaic array maximum power point tracking techniques
    • Esram T., Chapman P.L. Comparison of photovoltaic array maximum power point tracking techniques. IEEE Trans Energy Convers 2007, 22.
    • (2007) IEEE Trans Energy Convers , vol.22
    • Esram, T.1    Chapman, P.L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.