-
1
-
-
70349655548
-
3D model for evaluation of pollutant concentration distributions from land-based sources of the Caspian Sea Region-regional study, Southern Part of the Caspian Sea
-
Abbaspour, M. and Nobakhti, H., 2009. 3D model for evaluation of pollutant concentration distributions from land-based sources of the Caspian Sea Region-regional study, Southern Part of the Caspian Sea. Journal of Environmental Informatics, 14 (1), 51-65.
-
(2009)
Journal of Environmental Informatics
, vol.14
, Issue.1
, pp. 51-65
-
-
Abbaspour, M.1
Nobakhti, H.2
-
3
-
-
21144438339
-
A finite branch-and-bound algorithm for two-stage stochastic integer programs
-
Ahmed, S., Tawarmalani, M. and Sahinidis, N.V., 2004. A finite branch-and-bound algorithm for two-stage stochastic integer programs. Mathematical Programming, 100 (2), 355-377.
-
(2004)
Mathematical Programming
, vol.100
, Issue.2
, pp. 355-377
-
-
Ahmed, S.1
Tawarmalani, M.2
Sahinidis, N.V.3
-
6
-
-
0033703501
-
Solving fuzzy problems in operations research: Inventory control
-
Buckley, J.J., Feuring, T. and Hayashi,Y., 2000. Solving fuzzy problems in operations research: Inventory control. IEEE International Conference on Fuzzy Systems, 1, 352-357.
-
(2000)
IEEE International Conference on Fuzzy Systems
, vol.1
, pp. 352-357
-
-
Buckley, J.J.1
Feuring, T.2
Hayashi, Y.3
-
7
-
-
0024662762
-
An economic order quantity model with demand-dependent unit cost
-
Cheng, T.C.E., 1989. An economic order quantity model with demand-dependent unit cost. European Journal of Operational Research, 40, 252-256.
-
(1989)
European Journal of Operational Research
, vol.40
, pp. 252-256
-
-
Cheng, T.C.E.1
-
8
-
-
33847319230
-
A newsvendor's procurement problem when suppliers are unreliable
-
Dada, M., Petruzzi, N. and Schwarz, L., 2007. A newsvendor's procurement problem when suppliers are unreliable. Manufacturing and Service Operations Management, 9 (1), 9-32.
-
(2007)
Manufacturing and Service Operations Management
, vol.9
, Issue.1
, pp. 9-32
-
-
Dada, M.1
Petruzzi, N.2
Schwarz, L.3
-
9
-
-
0034258399
-
Convergence properties of two-stage stochastic programming
-
Dai, L., Chen, C.H. and Birge, J.R., 2000. Convergence properties of two-stage stochastic programming. Journal of Optimization Theory and Applications, 106, 489-509.
-
(2000)
Journal of Optimization Theory and Applications
, vol.106
, pp. 489-509
-
-
Dai, L.1
Chen, C.H.2
Birge, J.R.3
-
10
-
-
84881983997
-
Reminiscences about the origins of linear programming
-
Dantzig, G.B., 1983. Reminiscences about the origins of linear programming. Memoirs of the American Mathematical Society, 48 (298), 1-11.
-
(1983)
Memoirs of the American Mathematical Society
, vol.48
, Issue.298
, pp. 1-11
-
-
Dantzig, G.B.1
-
11
-
-
77949485288
-
A production/remanufacturing inventory model with price and quality dependent return rate
-
EI Saadany, A.M.A. and Jaber, M.Y., 2010. A production/remanufacturing inventory model with price and quality dependent return rate. Computers & Industrial Engineering, 58 (3), 352-362.
-
(2010)
Computers & Industrial Engineering
, vol.58
, Issue.3
, pp. 352-362
-
-
Ei Saadany, A.M.A.1
Jaber, M.Y.2
-
12
-
-
0032203397
-
A dynamic programming two-stage algorithm for long-term hydrothermal scheduling of multireservoir systems
-
Ferrero R.W., Rivera, J.F. and Shahidehpour, S.M., 1998. A dynamic programming two-stage algorithm for long-term hydrothermal scheduling of multireservoir systems. IEEE Transactions on Power Systems, 13, 1534-1540.
-
(1998)
IEEE Transactions on Power Systems
, vol.13
, pp. 1534-1540
-
-
Ferrero, R.W.1
Rivera, J.F.2
Shahidehpour, S.M.3
-
13
-
-
0018017628
-
An inventory policy for slow and fast movers in a petrochemical plant: A case study
-
Gelders, L.F. and van Looy, P.M., 1978. An inventory policy for slow and fast movers in a petrochemical plant: A case study. Journal of the Operational Research Society, 29 (9), 867-874.
-
(1978)
Journal of the Operational Research Society
, vol.29
, Issue.9
, pp. 867-874
-
-
Gelders, L.F.1
Van Looy, P.M.2
-
14
-
-
59149102825
-
Two-stage fuzzy chance-constrained programming - application to water resources management under dual uncertainties
-
Guo, P. and Huang, G.H., 2009. Two-stage fuzzy chance-constrained programming - application to water resources management under dual uncertainties. Stochastic Environmental Research and Risk Assessment, 23, 349-359.
-
(2009)
Stochastic Environmental Research and Risk Assessment
, vol.23
, pp. 349-359
-
-
Guo, P.1
Huang, G.H.2
-
16
-
-
33846397516
-
Two-stage decision-making under uncertainty and stochasticity: Bayesian programming
-
Harrison, K.W., 2007. Two-stage decision-making under uncertainty and stochasticity: Bayesian programming. Advances in Water Resources, 30, 641-664.
-
(2007)
Advances in Water Resources
, vol.30
, pp. 641-664
-
-
Harrison, K.W.1
-
17
-
-
0034288672
-
A stochastic programming approach to manufacturing flow control
-
Haurie, A. and Moresino, F., 2000. A stochastic programming approach to manufacturing flow control. IIE Transactions, 32, 907-920.
-
(2000)
IIE Transactions
, vol.32
, pp. 907-920
-
-
Haurie, A.1
Moresino, F.2
-
19
-
-
0000666441
-
Grey integer programming: Anapplication towaste management planning under uncertainty
-
Huang, G.H., Baetz,B.W. and Patry, G.G., 1995. Grey integer programming:Anapplication towaste management planning under uncertainty. European Journal of Operational Research, 83, 594-620.
-
(1995)
European Journal of Operational Research
, vol.83
, pp. 594-620
-
-
Huang, G.H.1
Baetz, B.W.2
Patry, G.G.3
-
20
-
-
0032070909
-
A hybrid inexact-stochastic water management model
-
Huang, G.H., 1998. A hybrid inexact-stochastic water management model. European Journal of Operational Research, 107, 137-158.
-
(1998)
European Journal of Operational Research
, vol.107
, pp. 137-158
-
-
Huang, G.H.1
-
21
-
-
0033897683
-
Aninexact two-stage stochastic programming model forwater resources management under uncertainty
-
Huang, G.H. and Loucks, D.P., 2000.Aninexact two-stage stochastic programming model forwater resources management under uncertainty. Civil Engineering and Environmental Systems, 17, 95-118.
-
(2000)
Civil Engineering and Environmental Systems
, vol.17
, pp. 95-118
-
-
Huang, G.H.1
Loucks, D.P.2
-
22
-
-
69249238083
-
A stochastic programming approach for planning horizons of infinite horizon capacity planning problems
-
Huang, K. and Ahmed, S., 2010. A stochastic programming approach for planning horizons of infinite horizon capacity planning problems. European Journal of Operational Research, 200, 74-84.
-
(2010)
European Journal of Operational Research
, vol.200
, pp. 74-84
-
-
Huang, K.1
Ahmed, S.2
-
23
-
-
77954382091
-
Development of a systematic object-event data model of the database system for industrial wastewater treatment plant management
-
Huang, W.C., Liaw, S.L. and Chang, S.Y., 2010. Development of a systematic object-event data model of the database system for industrial wastewater treatment plant management. Journal of Environmental Informatics, 15 (1), 14-25.
-
(2010)
Journal of Environmental Informatics
, vol.15
, Issue.1
, pp. 14-25
-
-
Huang, W.C.1
Liaw, S.L.2
Chang, S.Y.3
-
24
-
-
33645947036
-
Ten iterative steps in development and evaluation of environmental models
-
Jakeman, A.J., Letcher, R.A. and Norton, J.P., 2006. Ten iterative steps in development and evaluation of environmental models. Environmental Modelling & Software, 21 (5), 602-614.
-
(2006)
Environmental Modelling & Software
, vol.21
, Issue.5
, pp. 602-614
-
-
Jakeman, A.J.1
Letcher, R.A.2
Norton, J.P.3
-
25
-
-
0036498951
-
A single-period inventory model with fuzzy demand
-
Kao, C. and Hsu, W., 2002. A single-period inventory model with fuzzy demand. Computer & Mathematics with Applications, 43 (6-7), 841-848.
-
(2002)
Computer & Mathematics with Applications
, vol.43
, Issue.6-7
, pp. 841-848
-
-
Kao, C.1
Hsu, W.2
-
26
-
-
0033313671
-
Fuzzy multi-deteriorating items EOQ model with price dependent under budgetary constraint
-
Kar, S., Roy, T.K. and Maiti, M., 1999. Fuzzy multi-deteriorating items EOQ model with price dependent under budgetary constraint. Modelling, Measurement and Control D, 19, 245-259.
-
(1999)
Modelling, Measurement and Control D
, vol.19
, pp. 245-259
-
-
Kar, S.1
Roy, T.K.2
Maiti, M.3
-
27
-
-
0025198209
-
Sampling stochastic dynamic programming applied to reservoir operation
-
Kelman, J., Stedinger, J.R., Cooper, L.A., Hsu, E. and Yuan, S.-Q., 1990. Sampling stochastic dynamic programming applied to reservoir operation. Water Resources Research, 26 (3), 447-454.
-
(1990)
Water Resources Research
, vol.26
, Issue.3
, pp. 447-454
-
-
Kelman, J.1
Stedinger, J.R.2
Cooper, L.A.3
Hsu, E.4
Yuan, S.-Q.5
-
28
-
-
0022661836
-
A two-stage approach for large-scale sewer systems design with application to the Lake Balaton resort area
-
Kovacs, L., Boros, E. and Inotay, F., 1986.A two-stage approach for large-scale sewer systems design with application to the Lake Balaton resort area. European Journal of Operational Research, 23 (2), 169-178.
-
(1986)
European Journal of Operational Research
, vol.23
, Issue.2
, pp. 169-178
-
-
Kovacs, L.1
Boros, E.2
Inotay, F.3
-
29
-
-
10644267631
-
A model for lumpy demand parts in a multi-location inventory system with transshipments
-
Kukreja, A. and Schmidt, C.P., 2005. A model for lumpy demand parts in a multi-location inventory system with transshipments. Computers and Operations Research, 32 (8), 2059-2075.
-
(2005)
Computers and Operations Research
, vol.32
, Issue.8
, pp. 2059-2075
-
-
Kukreja, A.1
Schmidt, C.P.2
-
30
-
-
61449199362
-
Using stochastic approximation methods to compute optimal base-stock levels in inventory control problems
-
Kunnumkal, S. and Topaloglu, H., 2006. Using stochastic approximation methods to compute optimal base-stock levels in inventory control problems. Operations Research, 56 (3), 646-664.
-
(2006)
Operations Research
, vol.56
, Issue.3
, pp. 646-664
-
-
Kunnumkal, S.1
Topaloglu, H.2
-
31
-
-
33644622714
-
An interval-parameter multi-stage stochastic programming model for water resources management under uncertainty
-
Li, Y.P., Huang, G.H. and Nie, S.L., 2006. An interval-parameter multi-stage stochastic programming model for water resources management under uncertainty. Advances in Water Resources, 29 (5), 776-789.
-
(2006)
Advances in Water Resources
, vol.29
, Issue.5
, pp. 776-789
-
-
Li, Y.P.1
Huang, G.H.2
Nie, S.L.3
-
32
-
-
33947581401
-
Mixed interval-fuzzy two-stage integer programming and its application to flood-diversion planning
-
Li, Y.P., Huang, G.H. and Nie, S.L., 2007. Mixed interval-fuzzy two-stage integer programming and its application to flood-diversion planning. Engineering Optimization, 39 (2), 163-183.
-
(2007)
Engineering Optimization
, vol.39
, Issue.2
, pp. 163-183
-
-
Li, Y.P.1
Huang, G.H.2
Nie, S.L.3
-
33
-
-
46149096497
-
Interval-parameter robust quadratic programming for water quality management under uncertainty
-
Li,Y.P., Huang, G.H., Nie, S.L. and Mo, D.W., 2008a. Interval-parameter robust quadratic programming for water quality management under uncertainty. Engineering Optimization, 40 (7), 613-635.
-
(2008)
Engineering Optimization
, vol.40
, Issue.7
, pp. 613-635
-
-
Li, Y.P.1
Huang, G.H.2
Nie, S.L.3
Mo, D.W.4
-
34
-
-
42949132328
-
Inexact multistage stochastic integer programming for water resources management under uncertainty
-
Li,Y.P., Huang, G.H., Nie, S.L. and Liu, L., 2008b. Inexact multistage stochastic integer programming for water resources management under uncertainty. Journal of Environmental Management, 88 (1), 93-107.
-
(2008)
Journal of Environmental Management
, vol.88
, Issue.1
, pp. 93-107
-
-
Li, Y.P.1
Huang, G.H.2
Nie, S.L.3
Liu, L.4
-
35
-
-
62349084782
-
Amultistage fuzzy-stochastic programming model for supporting sustainable water-resources allocation and management
-
Li,Y.P., Huang, G.H., Huang,Y.F. and Zhou, H.D., 2009.Amultistage fuzzy-stochastic programming model for supporting sustainable water-resources allocation and management. Environmental Modelling & Software, 24, 786-797.
-
(2009)
Environmental Modelling & Software
, vol.24
, pp. 786-797
-
-
Li, Y.P.1
Huang, G.H.2
Huang, Y.F.3
Zhou, H.D.4
-
36
-
-
77954362016
-
Modeling acoustic properties of the fluid-fluid interface in porous medium
-
Liu, N.Y., Paranjape, R. and Asghari, K., 2010. Modeling acoustic properties of the fluid-fluid interface in porous medium. Journal of Environmental Informatics, 15 (1), 26-32.
-
(2010)
Journal of Environmental Informatics
, vol.15
, Issue.1
, pp. 26-32
-
-
Liu, N.Y.1
Paranjape, R.2
Asghari, K.3
-
37
-
-
0003715857
-
-
Englewood Cliffs, NJ: Prentice-Hall
-
Loucks, D.P., Stedinger, J.R. and Haith, D.A., 1981. Water resource systems planning and analysis. Englewood Cliffs, NJ: Prentice-Hall.
-
(1981)
Water Resource Systems Planning and Analysis
-
-
Loucks, D.P.1
Stedinger, J.R.2
Haith, D.A.3
-
38
-
-
58649121971
-
Inventory model with stochastic lead-time and price dependent demand incorporating advance payment
-
Maiti, A.K., Maiti, M.K. and Maiti, M., 2009. Inventory model with stochastic lead-time and price dependent demand incorporating advance payment. Applied Mathematical Modelling, 33, 2433-2443.
-
(2009)
Applied Mathematical Modelling
, vol.33
, pp. 2433-2443
-
-
Maiti, A.K.1
Maiti, M.K.2
Maiti, M.3
-
39
-
-
33746051269
-
Adisplayed inventory model with L-R fuzzy number
-
Mandal, N.K. and Roy, T.K., 2006.Adisplayed inventory model with L-R fuzzy number. Fuzzy Optimization and Decision Making, 5 (3), 227-243.
-
(2006)
Fuzzy Optimization and Decision Making
, vol.5
, Issue.3
, pp. 227-243
-
-
Mandal, N.K.1
Roy, T.K.2
-
40
-
-
0038509120
-
A two-stage interval-stochastic programming model for waste management under uncertainty
-
Maqsood, I. and Huang, G.H., 2003. A two-stage interval-stochastic programming model for waste management under uncertainty. Journal of the Air & Waste Management Association, 53 (5), 540-552.
-
(2003)
Journal of the Air & Waste Management Association
, vol.53
, Issue.5
, pp. 540-552
-
-
Maqsood, I.1
Huang, G.H.2
-
41
-
-
13544252464
-
An interval-parameter fuzzy two-stage stochastic program for water resources management under uncertainty
-
Maqsood, I., Huang, G.H. andYeomans, J.S., 2005. An interval-parameter fuzzy two-stage stochastic program for water resources management under uncertainty. European Journal of Operational Research, 167, 208-225.
-
(2005)
European Journal of Operational Research
, vol.167
, pp. 208-225
-
-
Maqsood, I.1
Huang, G.H.2
Yeomans, J.S.3
-
42
-
-
34548447487
-
An inventory control system for spare parts at a refinery: An empirical comparison of different re-order point methods
-
Porras, E. and Dekker, R., 2008. An inventory control system for spare parts at a refinery: An empirical comparison of different re-order point methods. European Journal of Operational Research, 184 (1), 101-132.
-
(2008)
European Journal of Operational Research
, vol.184
, Issue.1
, pp. 101-132
-
-
Porras, E.1
Dekker, R.2
-
43
-
-
0031168166
-
A fuzzy EOQ model with demand-dependent unit cost under limited storage capacity
-
Roy, T.K. and Maiti, M., 1997. A fuzzy EOQ model with demand-dependent unit cost under limited storage capacity. European Journal of Operational Research, 99, 425-432.
-
(1997)
European Journal of Operational Research
, vol.99
, pp. 425-432
-
-
Roy, T.K.1
Maiti, M.2
-
44
-
-
0001060664
-
Parallel decomposition of mulitsatge stochastic programming problems
-
Ruszczynski, A., 1993. Parallel decomposition of mulitsatge stochastic programming problems. Mathematical Programming, 58, 201-228.
-
(1993)
Mathematical Programming
, vol.58
, pp. 201-228
-
-
Ruszczynski, A.1
-
45
-
-
0031222339
-
Accelerating the regularized decomposition method for two-stage stochastic linear problems
-
Ruszczynski, A. and Swietanowski, A., 1997. Accelerating the regularized decomposition method for two-stage stochastic linear problems. European Journal of Operational Research, 101, 328-342.
-
(1997)
European Journal of Operational Research
, vol.101
, pp. 328-342
-
-
Ruszczynski, A.1
Swietanowski, A.2
-
46
-
-
77950368643
-
Inventory systems with stochastic demand and supply: Properties and approximations
-
Schmitt, A.J., Snyder, L.V. and Max Shen, Z.-J., 2010. Inventory systems with stochastic demand and supply: Properties and approximations. European Journal of Operational Research, 206, 313-328.
-
(2010)
European Journal of Operational Research
, vol.206
, pp. 313-328
-
-
Schmitt, A.J.1
Snyder, L.V.2
Max Shen, Z.-J.3
-
47
-
-
0030524452
-
Two-stage stochastic integer programming: A survey
-
Schultz, R., Stougie, L. and van der Vlerk M.H., 1995. Two-stage stochastic integer programming: A survey. Statistica Neerlandica, 50 (3), 404-416.
-
(1995)
Statistica Neerlandica
, vol.50
, Issue.3
, pp. 404-416
-
-
Schultz, R.1
Stougie, L.2
Van Der Vlerk, M.H.3
-
48
-
-
0034746119
-
Interior-point method for reservoir operation with stochastic inflows
-
Seifi, A. and Hipel, K.W., 2001. Interior-point method for reservoir operation with stochastic inflows. Journal of Water Resources Planning and Management, 127 (1), 48-57.
-
(2001)
Journal of Water Resources Planning and Management
, vol.127
, Issue.1
, pp. 48-57
-
-
Seifi, A.1
Hipel, K.W.2
-
50
-
-
0023107723
-
Use of stochastic dynamic programming for reservoir management
-
Trezos, T. andYeh,W.W.-G., 1987. Use of stochastic dynamic programming for reservoir management.Water Resources Research, 23, 983-996.
-
(1987)
Water Resources Research
, vol.23
, pp. 983-996
-
-
Trezos, T.1
Yeh, W.W.-G.2
-
51
-
-
73649120593
-
Geochemical evaluation of groundwater quality in Katedhan IDA and surrounding areas, Hyderabad, A.P., India
-
Udayalaxmi, G., Ramadass, G. and Himabindu, D., 2009. Geochemical evaluation of groundwater quality in Katedhan IDA and surrounding areas, Hyderabad, A.P., India. Journal of Environmental Informatics, 14 (2), 100-109.
-
(2009)
Journal of Environmental Informatics
, vol.14
, Issue.2
, pp. 100-109
-
-
Udayalaxmi, G.1
Ramadass, G.2
Himabindu, D.3
-
53
-
-
0028443237
-
An inventory management model for an inventory consisting of lumpy items, slow movers and fast movers
-
Vereecke, A. andVerstraeten, P., 1994. An inventory management model for an inventory consisting of lumpy items, slow movers and fast movers. International Journal of Production Economics, 35 (1-3), 379-389.
-
(1994)
International Journal of Production Economics
, vol.35
, Issue.1-3
, pp. 379-389
-
-
Vereecke, A.1
Verstraeten, P.2
-
54
-
-
0008968254
-
A new approach to forecasting intermittent demand in manufacturing: Acomparative evaluation of Croston's method
-
Willemain, T.R., Smart, C.N. and Schwarz, H.F., 2004. A new approach to forecasting intermittent demand in manufacturing:Acomparative evaluation of Croston's method. International Journal of Forecasting, 10 (4), 529-538.
-
(2004)
International Journal of Forecasting
, vol.10
, Issue.4
, pp. 529-538
-
-
Willemain, T.R.1
Smart, C.N.2
Schwarz, H.F.3
-
55
-
-
69249220368
-
Analysis of supply chain coordination under fuzzy demand in a two-stage supply chain
-
Xu, R.N. and Zhai, X.Y., 2010. Analysis of supply chain coordination under fuzzy demand in a two-stage supply chain. Applied Mathematical Modelling, 34, 129-139.
-
(2010)
Applied Mathematical Modelling
, vol.34
, pp. 129-139
-
-
Xu, R.N.1
Zhai, X.Y.2
-
56
-
-
72849130884
-
Inexact two-stage stochastic robust optimization model for water resources management under uncertainty
-
Xu, Y., Huang, G.H. and Qin, X.S., 2009. Inexact two-stage stochastic robust optimization model for water resources management under uncertainty. Environmental Engineering Science, 26 (12), 1765-1776.
-
(2009)
Environmental Engineering Science
, vol.26
, Issue.12
, pp. 1765-1776
-
-
Xu, Y.1
Huang, G.H.2
Qin, X.S.3
-
57
-
-
45249090360
-
An inexact-stochastic dual water supply programming model
-
Zhang, X.H., Zhang, H.W., Chen, B., Guo, H.C., Chen, G.Q. and Zhao, B.A., 2009. An inexact-stochastic dual water supply programming model. Communications in Nonlinear Science and Numerical Simulation, 14, 301-309.
-
(2009)
Communications in Nonlinear Science and Numerical Simulation
, vol.14
, pp. 301-309
-
-
Zhang, X.H.1
Zhang, H.W.2
Chen, B.3
Guo, H.C.4
Chen, G.Q.5
Zhao, B.A.6
|