2
-
-
84860259757
-
-
Integration of Variable Generation Task Force, Accommodating High Levels ofVariable Generation. Princeton, NJ, NERC
-
Integration of Variable Generation Task Force, Accommodating High Levels ofVariable Generation. Princeton, NJ, NERC, 2009. [Online] . Available: http://www.nerc.com/files/IVGTF-Report-041609.pdf.
-
(2009)
-
-
-
3
-
-
33947673959
-
Experience from wind integration in some high penetration areas
-
Mar.
-
L. Soder et al. , " Experience from wind integration in some high penetration areas," IEEE Trans. Energy Convers. , vol. 22, no. 1, pp. 4-12, Mar. 2007.
-
(2007)
IEEE Trans. Energy Convers.
, vol.22
, Issue.1
, pp. 4-12
-
-
Soder, L.1
-
5
-
-
76649127720
-
Long-term probabilistic evaluation of operating reserve requirements with renewable sources
-
Feb.
-
A. da Silva et al. , " Long-term probabilistic evaluation of operating reserve requirements with renewable sources " IEEE Trans. Power Syst. , vol. 25, no. 1, pp. 106-116, Feb. 2010.
-
(2010)
IEEE Trans. Power Syst.
, vol.25
, Issue.1
, pp. 106-116
-
-
Da Silva, A.1
-
6
-
-
78649534635
-
Integration of variable generation: Capacity value and evaluation of flexibility
-
Minneapolis, MN
-
E. Lannoye et al. , " Integration of variable generation: Capacity value and evaluation of flexibility," in Proc. IEEE Power and Energy Soc. General Meeting , Minneapolis, MN, 2010.
-
(2010)
Proc. IEEE Power and Energy Soc. General Meeting
-
-
Lannoye, E.1
-
7
-
-
84860259755
-
-
Chandler, Empowering Variable Renewables, International Energy Agency 2009
-
H. Chandler, Empowering Variable Renewables, International Energy Agency, 2009.
-
-
-
-
8
-
-
84860261294
-
-
RWE The Need for Smart Megawatts
-
RWE, The Need for Smart Megawatts, 2009.
-
(2009)
-
-
-
9
-
-
0033874583
-
Forecasting loads and prices in competitive power markets
-
DOI 10.1109/5.823996
-
D. Bunn, " Forecasting loads and prices in competitive power markets," Proc. IEEE, vol. 88, no. 2, pp. 163-169, Feb. 2000. (Pubitemid 30558107)
-
(2000)
Proceedings of the IEEE
, vol.88
, Issue.2
, pp. 163-169
-
-
Bunn, D.W.1
-
10
-
-
84860261293
-
-
Generation Adequacy Report: 2011 - 2020, EirGrid
-
Generation Adequacy Report: 2011 - 2020, EirGrid, 2011. [Online]. Available: http://www.eirgrid.com.
-
-
-
-
11
-
-
82855176859
-
Optimizing the flexibility of a portfolio of generating plant to deal with wind generation
-
Detroit MI, Jul.
-
D. Kirschen et al. , " Optimizing the flexibility of a portfolio of generating plant to deal with wind generation," in Proc. IEEE Power and Energy Soc. General Meeting , Detroit, MI, Jul. 2011.
-
(2011)
Proc. IEEE Power and Energy Soc. General Meeting
-
-
Kirschen, D.1
-
12
-
-
0038665928
-
-
EasternWind Integration and Transmission Study, EnerNex Corp
-
EasternWind Integration and Transmission Study, EnerNex Corp., National Renewable Energy Laboratory, 2010.
-
(2010)
National Renewable Energy Laboratory
-
-
-
13
-
-
84860261296
-
-
Western Wind and Solar Integration Study, NREL, National Renewable Energy Laboratory, 2010. [Online]
-
Western Wind and Solar Integration Study, NREL, National Renewable Energy Laboratory, 2010. [Online]. Available: http://www.n rel. gov/wind/ systemsintegration/pdfs/2010/wwsis-final-report.pdf.
-
(2010)
-
-
-
14
-
-
5244272779
-
Generating reserve capacity determined by the probability method
-
Jan.
-
G. Calabrese, " Generating reserve capacity determined by the probability method," Trans. Amer. Inst. Elect. Eng. , vol. 66, no. 1, pp. 1439-1448, Jan. 1947.
-
(1947)
Trans. Amer. Inst. Elect. Eng.
, vol.66
, Issue.1
, pp. 1439-1448
-
-
Calabrese, G.1
-
16
-
-
0028480974
-
A basic framework for generating system operating health analysis
-
Aug.
-
R. Billinton and M. Fotuhi-Firuzabad, " A basic framework for generating system operating health analysis," IEEE Trans. Power Syst. , vol. 9, no. 3, pp. 1610-1617, Aug. 1994.
-
(1994)
IEEE Trans. Power Syst.
, vol.9
, Issue.3
, pp. 1610-1617
-
-
Billinton, R.1
Fotuhi-Firuzabad, M.2
-
17
-
-
78649740687
-
Transmission system requirements and ancillary services provision
-
W. Hung, " Transmission system requirements and ancillary services provision," in Proc. IET Seminar Power Gen. Control , 2007, pp. 37-53.
-
(2007)
Proc. IET Seminar Power Gen. Control
, pp. 37-53
-
-
Hung, W.1
-
18
-
-
79955547624
-
Capacity value of wind power
-
May
-
A. Keane et al. , " Capacity value of wind power," IEEE Trans. Power Syst. , vol. 26, no. 2, pp. 564-572, May 2011.
-
(2011)
IEEE Trans. Power Syst.
, vol.26
, Issue.2
, pp. 564-572
-
-
Keane, A.1
-
20
-
-
84860259754
-
-
Deutsche Energie Agentur GmbH, Planning of the Grid Integration of Wind Energy in Germany Onshore and Offshore up to the Year 2020, Deutsche Energie Agentur GmbH, 2005
-
Deutsche Energie Agentur GmbH, Planning of the Grid Integration of Wind Energy in Germany Onshore and Offshore up to the Year 2020, Deutsche Energie Agentur GmbH, 2005.
-
-
-
-
22
-
-
79952606016
-
Impacts of large amounts of wind power on design and operation of power systems, results of IEA collaboration
-
H. Holttinen et al. , " Impacts of large amounts of wind power on design and operation of power systems, results of IEA collaboration " Wind Energy , vol. 14, no. 2, pp. 179-192, 2011.
-
(2011)
Wind Energy
, vol.14
, Issue.2
, pp. 179-192
-
-
Holttinen, H.1
-
23
-
-
34248512634
-
Stochastic security-constrained unit commitment
-
DOI 10.1109/TPWRS.2007.894843
-
L.Wu et al. , " Stochastic security-constrained unit commitment," IEEE Trans. Power Syst. , vol. 22, no. 2, pp. 800-811, May 2007. (Pubitemid 46746244)
-
(2007)
IEEE Transactions on Power Systems
, vol.22
, Issue.2
, pp. 800-811
-
-
Wu, L.1
Shahidehpour, M.2
Li, T.3
-
24
-
-
67349225799
-
Unit commitment for systems with significant wind penetration
-
May
-
A. Tuohy et al. , " Unit commitment for systems with significant wind penetration," IEEE Trans. Power Syst. , vol. 24, no. 2, pp. 592-601, May 2009.
-
(2009)
IEEE Trans. Power Syst.
, vol.24
, Issue.2
, pp. 592-601
-
-
Tuohy, A.1
-
26
-
-
0016474792
-
Operating reserve and generation risk analysis for the PJM interconnection
-
Mar.
-
L. Leffler et al. , " Operating reserve and generation risk analysis for the PJM interconnection," IEEE Trans. Power App. Syst. , vol. PAS-94, no. 2, pp. 396-407, Mar. 1975.
-
(1975)
IEEE Trans. Power App. Syst.
, vol.PAS-94
, Issue.2
, pp. 396-407
-
-
Leffler, L.1
-
27
-
-
77951450592
-
Should the spinning reserve procurement in systems with wind power generation be deterministic or probabilistic?
-
Apr.
-
M. Ortega-Vazquez and D. Kirschen, " Should the spinning reserve procurement in systems with wind power generation be deterministic or probabilistic? " in Proc. Int. Conf. Sustainable Power Generation and Supply, Apr. 2009.
-
(2009)
Proc. Int. Conf. Sustainable Power Generation and Supply
-
-
Ortega-Vazquez, M.1
Kirschen, D.2
-
28
-
-
84893193676
-
Computation of dynamic operating balancing reserve for wind power integration for the time horizon 1-48 hours
-
Quebec City, QC, Canada, Oct.
-
N. Menemenlis et al. , " Computation of dynamic operating balancing reserve for wind power integration for the time horizon 1-48 hours," in Proc. 9th Annu. Int. Workshop Large-Scale Integration of Wind Power into Power Systems, Quebec City, QC, Canada, Oct. 2010.
-
(2010)
Proc. 9th Annu. Int. Workshop Large-Scale Integration of Wind Power into Power Systems
-
-
Menemenlis, N.1
-
29
-
-
0027594442
-
Reserve margin planning in a wind-hydro-thermal power system
-
May
-
L. Söder, " Reserve margin planning in a wind-hydro-thermal power system," IEEE Trans. Power Syst. , vol. 8, no. 2, pp. 564-571, May 1993.
-
(1993)
IEEE Trans. Power Syst.
, vol.8
, Issue.2
, pp. 564-571
-
-
Söder, L.1
-
30
-
-
84861408123
-
Power reserve in interconnected systems with high wind power production
-
Porto, Portugal
-
G. Dany Power reserve in interconnected systems with high wind power production Proc. IEEE Power Tech. Porto, Portugal 2001 4.
-
(2001)
Proc. IEEE Power Tech.
, vol.4
-
-
Dany, G.1
-
31
-
-
18944371663
-
A new approach to quantify reserve demand in systems with significant installed wind capacity
-
DOI 10.1109/TPWRS.2005.846206
-
R. Doherty and M. O'Malley, " New approach to quantify reserve demand in systems with significant installed wind capacity " IEEE Trans. Power Syst., vol. 20, no. 2, pp. 587-595, May 2005. (Pubitemid 40699684)
-
(2005)
IEEE Transactions on Power Systems
, vol.20
, Issue.2
, pp. 587-595
-
-
Doherty, R.1
O'Malley, M.2
-
32
-
-
67349249985
-
Economic valuation of reserves in power systems with high penetration of wind power
-
May
-
J. Morales et al. , " Economic valuation of reserves in power systems with high penetration of wind power," IEEE Trans. Power Syst. , vol. 24, no. 2, pp. 900-910, May 2009.
-
(2009)
IEEE Trans. Power Syst.
, vol.24
, Issue.2
, pp. 900-910
-
-
Morales, J.1
-
33
-
-
0001281946
-
Optimization methods for electric utility resource planning
-
May
-
B. F. Hobbs, " Optimization methods for electric utility resource planning," Eur. J. Oper. Res. , vol. 83, no. 1, pp. 1-20, May 1995.
-
(1995)
Eur. J. Oper. Res.
, vol.83
, Issue.1
, pp. 1-20
-
-
Hobbs, B.F.1
-
34
-
-
33845382806
-
Nonparametric estimation from incomplete observations
-
E. L. Kaplan and P. Meier, " Nonparametric estimation from incomplete observations " J. Amer. Statist. Assoc. , vol. 53, no. 282, pp. 457-481, 1958.
-
(1958)
J. Amer. Statist. Assoc.
, vol.53
, Issue.282
, pp. 457-481
-
-
Kaplan, E.L.1
Meier, P.2
-
35
-
-
79151476838
-
Capacity value of wind power, calculation, and data requirements: The Irish power system case
-
Feb.
-
B. Hasche et al. , " Capacity value of wind power, calculation, and data requirements: The Irish power system case," IEEE Trans. Power Syst. , vol. 26, no. 1, pp. 420-430, Feb. 2011.
-
(2011)
IEEE Trans. Power Syst.
, vol.26
, Issue.1
, pp. 420-430
-
-
Hasche, B.1
|