메뉴 건너뛰기




Volumn 8, Issue 2, 2011, Pages 195-212

A case study on redesign of supply chain network of a manufacturing organization

Author keywords

Discrete event simulation; India; Information sharing; Manufacturing industries; Outsourcing; Sequential decision making; Supply chain management; Taguchi experimental design

Indexed keywords


EID: 84859726946     PISSN: 09727981     EISSN: 20493207     Source Type: Journal    
DOI: 10.1108/09727981111175948     Document Type: Article
Times cited : (13)

References (25)
  • 1
    • 0029273131 scopus 로고
    • Future manufacturing system‐towards the extended enterprise
    • ( ), “”, ‐
    • Browne, J., Sackett, P.J. and Wortmann, J.C. (1995), “Future manufacturing system‐towards the extended enterprise”, Computer in Industry, Vol. 25 No. 3, pp. 235‐54.
    • (1995) Computer in Industry , vol.25 , Issue.3 , pp. 235-254
    • Browne, J.1    Sackett, P.J.2    Wortmann, J.C.3
  • 2
    • 0034249441 scopus 로고    scopus 로고
    • Supply chain inventory management and the value of shared information
    • ( ), “”, ‐
    • Cachon, G.P. and Fisher, M. (2000), “Supply chain inventory management and the value of shared information”, Management Science, Vol. 46 No. 8, pp. 1032‐48.
    • (2000) Management Science , vol.46 , Issue.8 , pp. 1032-1048
    • Cachon, G.P.1    Fisher, M.2
  • 3
    • 1142280344 scopus 로고    scopus 로고
    • A heuristic methodology for order distribution in a demand driven borative supply chain
    • ( ), “”, ‐
    • Chan, F.T.S., Chung, S.H. and Wadhwa, S. (2004), “A heuristic methodology for order distribution in a demand driven collaborative supply chain”, International Journal of Production Research, Vol. 42 No. 1, pp. 1‐19.
    • (2004) International Journal of Production Research , vol.42 , Issue.1 , pp. 1-19
    • Chan, F.T.S.1    Chung, S.H.2    Wadhwa, S.3
  • 4
    • 21844503318 scopus 로고
    • Economies of integration versus bureaucracy costs: does vertical integration improve performance?
    • ( ), “”, ‐
    • D'Aveni, R. and Ravenscraft, D. (1994), “Economies of integration versus bureaucracy costs: does vertical integration improve performance?”, Academy of Management Journal, Vol. 37 No. 5, pp. 1167‐206.
    • (1994) Academy of Management Journal , vol.37 , Issue.5 , pp. 1167-1206
    • D'Aveni, R.1    Ravenscraft, D.2
  • 7
    • 84860725509 scopus 로고    scopus 로고
    • A discrete dynamic programming approach towards optimal outsourcing policy in supply chain management
    • ( ), “”, ‐
    • Dev, N.K., Swami, S. and Caprihan, R. (2010), “A discrete dynamic programming approach towards optimal outsourcing policy in supply chain management”, Journal of Advances in Management Research, Vol. 7 No. 1, pp. 94‐111.
    • (2010) Journal of Advances in Management Research , vol.7 , Issue.1 , pp. 94-111
    • Dev, N.K.1    Swami, S.2    Caprihan, R.3
  • 8
    • 0005668889 scopus 로고    scopus 로고
    • Value of information sharing and comparison with delayed differentiation
    • Tayur, S., Ganeshan, R., Magazine, M.and ( ), “”,and (Eds), ‐Kluwer Academic Publisher, Dordrecht
    • Gavirneni, S. and Tayur, S. (1998), “Value of information sharing and comparison with delayed differentiation”, in Tayur, S., Ganeshan, R. and Magazine, M. (Eds), Quantitative Models for Supply Chain Management, Kluwer Academic Publisher, Dordrecht, pp. 443‐66.
    • (1998) Quantitative Models for Supply Chain Management , pp. 443-466
    • Gavirneni, S.1    Tayur, S.2
  • 9
    • 0001626893 scopus 로고
    • Exit barriers and vertical integration
    • ( ), “”, ‐
    • Harrigan, K.R. (1985), “Exit barriers and vertical integration”, Academy of Management Journal, Vol. 28 No. 3, pp. 686‐97.
    • (1985) Academy of Management Journal , vol.28 , Issue.3 , pp. 686-697
    • Harrigan, K.R.1
  • 10
    • 0034508368 scopus 로고    scopus 로고
    • Capacity allocation and outsourcing in a process industry
    • ( ), “”, ‐
    • Kok, T.G.de (2000), “Capacity allocation and outsourcing in a process industry”, International Journal of Production Economics, Vol. 68 No. 3, pp. 229‐39.
    • (2000) International Journal of Production Economics , vol.68 , Issue.3 , pp. 229-239
    • Kok, T.G.1
  • 11
    • 0031108822 scopus 로고    scopus 로고
    • Information distortion in supply chain: the bullwhip effect
    • ( ), “”, ‐
    • Lee, H.L., Padmanabham, P. and Whang, S. (1997), “Information distortion in supply chain: the bullwhip effect”, Management Science, Vol. 43 No. 4, pp. 546‐59.
    • (1997) Management Science , vol.43 , Issue.4 , pp. 546-559
    • Lee, H.L.1    Padmanabham, P.2    Whang, S.3
  • 12
    • 0036642595 scopus 로고    scopus 로고
    • Advanced planning and scheduling with outsourcing in manufacturing supply chain
    • ( ), “”, ‐
    • Lee, Y.H., Jeong, C.S. and Moon, C. (2002), “Advanced planning and scheduling with outsourcing in manufacturing supply chain”, Computers and Industrial Engineering, Vol. 43 Nos 1‐2, pp. 351‐74.
    • (2002) Computers and Industrial Engineering , vol.43 , Issue.12 , pp. 351-374
    • Lee, Y.H.1    Jeong, C.S.2    Moon, C.3
  • 14
    • 65249176906 scopus 로고    scopus 로고
    • Capacitated production planning with outsourcing in an OKP company
    • ( ), “”, ‐
    • Liu, X. and Tu, Y.L. (2008), “Capacitated production planning with outsourcing in an OKP company”, International Journal of Production Economics, Vol. 46 No. 20, pp. 5781‐95.
    • (2008) International Journal of Production Economics , vol.46 , Issue.20 , pp. 5781-5795
    • Liu, X.1    Tu, Y.L.2
  • 16
    • 0031141908 scopus 로고    scopus 로고
    • Quantifying the bullwhip effect in supply chain
    • ( ), “”, ‐
    • Metters, R. (1997), “Quantifying the bullwhip effect in supply chain”, Journal of Operations Management, Vol. 15 No. 2, pp. 89‐100.
    • (1997) Journal of Operations Management , vol.15 , Issue.2 , pp. 89-100
    • Metters, R.1
  • 18
    • 0037062529 scopus 로고    scopus 로고
    • Make vs. buy decisions: a process incorporating multi‐attribute decision‐making
    • ( ), “”, ‐
    • Platts, K.W., Probert, D.R. and Canez, L. (2002), “Make vs. buy decisions: a process incorporating multi‐attribute decision‐making”, International Journal of Production Economics, Vol. 77 No. 3, pp. 247‐57.
    • (2002) International Journal of Production Economics , vol.77 , Issue.3 , pp. 247-257
    • Platts, K.W.1    Probert, D.R.2    Canez, L.3
  • 19
    • 63449087490 scopus 로고    scopus 로고
    • Flexible configuration for seamless supply chains: directions towards decision knowledge sharing
    • ( ), “”, ‐
    • Saxena, A. and Wadhwa, S. (2009), “Flexible configuration for seamless supply chains: directions towards decision knowledge sharing”, Robotics and Computer‐Integrated Manufacturing, Vol. 25 Nos 4‐5, pp. 839‐52.
    • (2009) Robotics and Computer‐Integrated Manufacturing , vol.25 , Issue.45 , pp. 839-852
    • Saxena, A.1    Wadhwa, S.2
  • 20
    • 84952242943 scopus 로고
    • Loading and control policies for flexible manufacturing systems
    • ( ), “”, ‐
    • Stecke, K.E. and Solberg, J.J. (1981), “Loading and control policies for flexible manufacturing systems”, International Journal of Production Research, Vol. 19 No. 5, pp. 481‐90.
    • (1981) International Journal of Production Research , vol.19 , Issue.5 , pp. 481-490
    • Stecke, K.E.1    Solberg, J.J.2
  • 23
    • 34247491022 scopus 로고    scopus 로고
    • Outsourcing or capacity expansions: application of activity‐based costing model on joint products decisions
    • ( ), “”, ‐
    • Tsai, W.H. and Lai, C.W. (2007), “Outsourcing or capacity expansions: application of activity‐based costing model on joint products decisions”, Computers & Operations Research, Vol. 43 No. 12, pp. 3666‐81.
    • (2007) Computers & Operations Research , vol.43 , Issue.12 , pp. 3666-3681
    • Tsai, W.H.1    Lai, C.W.2
  • 24
    • 27844521741 scopus 로고    scopus 로고
    • Flexibility enabled lead time reduction in flexible systems
    • ( ), “”, ‐
    • Wadhwa, S., Rao, K.S. and Chan, F.T.S. (2005), “Flexibility enabled lead time reduction in flexible systems”, International Journal of Production Research, Vol. 43 No. 15, pp. 3131‐62.
    • (2005) International Journal of Production Research , vol.43 , Issue.15 , pp. 3131-3162
    • Wadhwa, S.1    Rao, K.S.2    Chan, F.T.S.3
  • 25
    • 18744383359 scopus 로고    scopus 로고
    • A production‐inventory system with Markovian capacity and outsourcing option
    • ( ), “”, ‐
    • Yang, J., Qi, X. and Xia, Y. (2005), “A production‐inventory system with Markovian capacity and outsourcing option”, Operations Research, Vol. 53 No. 2, pp. 328‐49.
    • (2005) Operations Research , vol.53 , Issue.2 , pp. 328-349
    • Yang, J.1    Qi, X.2    Xia, Y.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.