Volumn 138, Issue 2, 2012, Pages 304-308

Net asset value-based concession duration model for BOT contracts

Author keywords

Build Operate Transfer; Concession period; Negotiations; Net asset value; Project management

Indexed keywords

BUILD OPERATE TRANSFERS; BUILD/OPERATE/TRANSFER; CONCESSION PERIOD; CRITICAL POINTS; DECISION VARIABLES; DURATION MODELS; NEGOTIATIONS; NET ASSET VALUE; NEW MODEL; PRIVATE INVESTORS; TRANSFER TIME; VALUE-BASED;

EID: 84858397734     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000397     Document Type: Article
Times cited : (31)

References (8)
  • 1
    • 34247222582 scopus 로고    scopus 로고
    • Using bargaining-game theory for negotiating concession period for BOT-type contract
    • DOI 10.1061/(ASCE)0733-9364(2007)133:5(385)
    • Shen, L. Y., Bao, H. J., Wu, Y. Z., and Lu, W. S. (2007). Using bargaining-game theory for negotiating concession period for BOT-type contract.. J. Constr. Eng. Manage. 0733-9364, 133 (5), 385-392. 10.1061/(ASCE)0733- 9364(2007)133:5(385) (Pubitemid 46613769)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.5 , pp. 385-392
    • Shen, L.Y.1    Bao, H.J.2    Wu, Y.Z.3    Lu, W.S.4
  • 2
    • 12144277401 scopus 로고    scopus 로고
    • Alternative concession model for build operate transfer contract projects
    • DOI 10.1061/(ASCE)0733-9364(2002)128:4(326)
    • Shen, L. Y., Li, H., and Li, Q. M. (2002). Alternative concession model for build operate transfer contract projects.. J. Constr. Eng. Manage. 0733-9364, 128 (4), 326-330. 10.1061/(ASCE)0733-9364(2002)128:4(326) (Pubitemid 40265537)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.4 , pp. 326-330
    • Shen, L.Y.1    Li, H.2    Li, Q.M.3
  • 3
    • 12744271519 scopus 로고    scopus 로고
    • Risk concession model for build/operate/transfer contract projects
    • DOI 10.1061/(ASCE)0733-9364(2005)131:2(211)
    • Shen, L. Y., and Wu, Y. Z. (2005). Risk concession model for build/operate/transfer contract projects.. J. Constr. Eng. Manage. 0733-9364, 131 (2), 211-220. 10.1061/(ASCE)0733-9364(2005)131:2(211) (Pubitemid 40155181)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.2 , pp. 211-220
    • Shen, L.Y.1    Wu, Y.Z.2
  • 5
    • 79959454483 scopus 로고    scopus 로고
    • Discussion of Win-win concession period determination methodology' by Xueqing Zhang
    • 0733-9364, 10.1061/(ASCE)CO.1943-7862.0000243
    • Wu, M., Chau, K. W., and Shen, Q. P. (2011 a). Discussion of Win-win concession period determination methodology' by Xueqing Zhang.. J. Constr. Eng. Manage. 0733-9364, 137 (6), 471. 10.1061/(ASCE)CO.1943-7862.0000243
    • (2011) J. Constr. Eng. Manage. , vol.137 , Issue.6 , pp. 471
    • Wu, M.1    Chau, K.W.2    Shen, Q.P.3
  • 6
    • 79959480853 scopus 로고    scopus 로고
    • Discussion of Employing the net present value-consistent IRR methods for PFI contracts' by Y. H. Chiang, Eddie W. L. Cheng, and Patrick T. I. Lam
    • 0733-9364
    • Wu, M., Chau, K. W., and Shen, Q. P. (2011 b). Discussion of Employing the net present value-consistent IRR methods for PFI contracts' by Y. H. Chiang, Eddie W. L. Cheng, and Patrick T. I. Lam.. J. Constr. Eng. Manage. 0733-9364, 137 (6), 472-474.
    • (2011) J. Constr. Eng. Manage. , vol.137 , Issue.6 , pp. 472-474
    • Wu, M.1    Chau, K.W.2    Shen, Q.P.3
  • 7
    • 78650258684 scopus 로고    scopus 로고
    • Win-win concession period determination methodology
    • 0733-9364, 10.1061/(ASCE)CO.1943-7862.0000012
    • Zhang, X. Q. (2009). Win-win concession period determination methodology.. J. Constr. Eng. Manage. 0733-9364, 135 (6), 550-558. 10.1061/(ASCE)CO.1943-7862.0000012
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.6 , pp. 550-558
    • Zhang, X.Q.1
  • 8
    • 84858415995 scopus 로고    scopus 로고
    • (Nov. 10, 2010)
    • Zhou, X. W. (2010). Sha Jiao B power plant development model.. http://www.szzx.gov.cn/zxxxzwhgz/zwhgzwh/ws-wjzl/wsgjszws/szws8/201004/ t20100406-1491415.htm (Nov. 10, 2010).
    • (2010) Sha Jiao B Power Plant Development Model