-
1
-
-
0033333442
-
Simulation as a tool for continuous process improvement
-
edited by P. A. Farrington, H. B. Nembhard, D. T. Sturrock, and G. W. Evans, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers
-
Adams, M., P. Componation, H. Czarnecki, and B. J. Schroer. 1999. "Simulation as a tool for continuous process improvement." In Proceedings of the 1999 Winter Simulation Conference, edited by P. A. Farrington, H. B. Nembhard, D. T. Sturrock, and G. W. Evans, 766-773. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
-
(1999)
Proceedings of the 1999 Winter Simulation Conference
, pp. 766-773
-
-
Adams, M.1
Componation, P.2
Czarnecki, H.3
Schroer, B.J.4
-
2
-
-
17744381413
-
Intelligent simulation-based lot scheduling of photolithography toolsets in a wafer fabrication facility
-
edited by R.G. Ingalls, M. D. Rossetti, J. S. Smith, and B. A. Peters, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers
-
Arisha, A. & P., Young. 2004. "Intelligent simulation-based lot scheduling of photolithography toolsets in a wafer fabrication facility". In Proceedings of the 2004 Winter Simulation Conference, edited by R.G. Ingalls, M. D. Rossetti, J. S. Smith, and B. A. Peters, 1935-1942. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
-
(2004)
Proceedings of the 2004 Winter Simulation Conference
, pp. 1935-1942
-
-
Arisha, A.1
Young, P.2
-
4
-
-
0036931346
-
The current and future status of simulation software (panel)
-
edited by E. Yücesan, C.-H. Chen, J. L. Snowdon, and J. M. Charnes. Piscataway, New Jersey: Institute of Electrical and Electronics En-gineers
-
Diamond, R., C. R. Harrell, J. O. Henrikson, W. B. Nordgren, C. D. Pegden, M. W. Rohrer, A. P. Waller, and A. M. Law. 2002. "The current and future status of simulation software (panel)." In Proceed-ings of the 2002 Winter Simulation Conference, edited by E. Yücesan, C.-H. Chen, J. L. Snowdon, and J. M. Charnes. 1633- 1640. Piscataway, New Jersey: Institute of Electrical and Electronics En-gineers.
-
(2002)
Proceedings of the 2002 Winter Simulation Conference
, pp. 1633-1640
-
-
Diamond, R.1
Harrell, C.R.2
Henrikson, J.O.3
Nordgren, W.B.4
Pegden, C.D.5
Rohrer, M.W.6
Waller, A.P.7
Law, A.M.8
-
5
-
-
33846661137
-
Lean sigma and simulation, so what's the correlation? V2
-
edited by M. E. Kuhl, N. M. Steig-er, F. B. Armstrong, and J. A. Joines. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers
-
Ferrin, D. M., M. J. Miller, and D. Muthler. 2005. "Lean sigma and simulation, so what's the correlation? V2." In Proceedings of the 2005 Winter Simulation Conference, edited by M. E. Kuhl, N. M. Steig-er, F. B. Armstrong, and J. A. Joines. 2011-2015. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
-
(2005)
Proceedings of the 2005 Winter Simulation Conference
, pp. 2011-2015
-
-
Ferrin, D.M.1
Miller, M.J.2
Muthler, D.3
-
6
-
-
34249995943
-
Lean information management: Understanding and eliminating waste
-
DOI 10.1016/j.ijinfomgt.2006.12.001, PII S0268401206001435
-
Hicks, B. J. 2007. "Lean information management: Understanding and eliminating waste." International Journal of information Management, 27: 233-249. (Pubitemid 46891116)
-
(2007)
International Journal of Information Management
, vol.27
, Issue.4
, pp. 233-249
-
-
Hicks, B.J.1
-
7
-
-
33745604543
-
Implementing the lean sigma framework in an Indian SME: A case study
-
DOI 10.1080/09537280500483350, PII J178260017826
-
Kumar, M., J. Antony, R. K. Singh, M. K. Tiwari & D.Perry. 2006. "Implementing the lean sigma framework in an Indian SME: a case study." Production Planning & Control, 17: 407-423. (Pubitemid 43982714)
-
(2006)
Production Planning and Control
, vol.17
, Issue.4
, pp. 407-423
-
-
Kumar, M.1
Antony, J.2
Singh, R.K.3
Tiwari, M.K.4
Perry, D.5
-
8
-
-
77249143354
-
Practical simulation application: Evaluation of process con-trol parameters in Twisted-Pair Cables manufacturing system
-
Mahfouz, A., S., Hassan & A., Arisha. 2010. "Practical simulation application: Evaluation of process con-trol parameters in Twisted-Pair Cables manufacturing system". Simulation Modelling Practice and Theory, 18: 471-482.
-
(2010)
Simulation Modelling Practice and Theory
, vol.18
, pp. 471-482
-
-
Mahfouz, A.1
Hassan, S.2
Arisha, A.3
-
9
-
-
63049088976
-
The role of lean in the application of information technology to manufacturing
-
Mo, J. 2009. "The role of lean in the application of information technology to manufacturing." Computers in Industry, 60: 266-276.
-
(2009)
Computers in Industry
, vol.60
, pp. 266-276
-
-
Mo, J.1
-
12
-
-
5044233746
-
Operational design of a supply chain system using Taguchi method, response surface methodology, simulation and optimisation
-
Shang, J.S., Li, S., Tadikamalla, P. 2004. "Operational design of a supply chain system using Taguchi method, response surface methodology, simulation and optimisation." Int. Journal of Prod. and Res. 42: 3823-3849
-
(2004)
Int. Journal of Prod. and Res.
, vol.42
, pp. 3823-3849
-
-
Shang, J.S.1
Li, S.2
Tadikamalla, P.3
|