-
1
-
-
0021643930
-
Aircraft stand assignment to minimize walking
-
Babic, O., Teodorovic, D., & Tosic, V. (1984). Aircraft stand assignment to minimize walking. Journal of Transportation Engineering, 110, 55-66.
-
(1984)
Journal of Transportation Engineering
, vol.110
, pp. 55-66
-
-
Babic, O.1
Teodorovic, D.2
Tosic, V.3
-
2
-
-
0025642317
-
A conceptual solution to the aircraft gate assignment problem using, 0, 1 linear programming
-
Bihr, R. A. (1990). A conceptual solution to the aircraft gate assignment problem using, 0, 1 linear programming. Computers and Industrial Engineering, 19, 280-284.
-
(1990)
Computers and Industrial Engineering
, vol.19
, pp. 280-284
-
-
Bihr, R.A.1
-
3
-
-
0002969484
-
Procedures for providing robust gate assignments for arriving aircraft
-
Bolat, A. (2000). Procedures for providing robust gate assignments for arriving aircraft. European Journal of Operations Research, 120, 63-80.
-
(2000)
European Journal of Operations Research
, vol.120
, pp. 63-80
-
-
Bolat, A.1
-
4
-
-
0000432042
-
Reducing walking distance at existing airports
-
Braaksma, J. P. (1977). Reducing walking distance at existing airports. Airport Forum, 4, 135-142.
-
(1977)
Airport Forum
, vol.4
, pp. 135-142
-
-
Braaksma, J.P.1
-
6
-
-
3042758897
-
New heuristics for the overconstrained airport gate assignment problem
-
Ding, H., Lim, A., Rodrigues, B., & Zhu, Y. (2004). New heuristics for the overconstrained airport gate assignment problem. Journal of the Operational Research Society, 55, 760-768.
-
(2004)
Journal of the Operational Research Society
, vol.55
, pp. 760-768
-
-
Ding, H.1
Lim, A.2
Rodrigues, B.3
Zhu, Y.4
-
9
-
-
33748281347
-
Flight gate scheduling: state-of-the-art and recent developments
-
Dorndorf, U., Drexl, A., Nikulin, Y., & Pesch, E. (2007a). Flight gate scheduling: state-of-the-art and recent developments. Omega, 35, 326-334.
-
(2007)
Omega
, vol.35
, pp. 326-334
-
-
Dorndorf, U.1
Drexl, A.2
Nikulin, Y.3
Pesch, E.4
-
10
-
-
33846863944
-
Disruption management in flight gate scheduling
-
Dorndorf, U., Jaehn, F., Lin, C., Ma, H., & Pesch, E. (2007b). Disruption management in flight gate scheduling. Statistica Neerlandica, 61, 92-114.
-
(2007)
Statistica Neerlandica
, vol.61
, pp. 92-114
-
-
Dorndorf, U.1
Jaehn, F.2
Lin, C.3
Ma, H.4
Pesch, E.5
-
11
-
-
70449635860
-
Modelling robust flight gate scheduling as a clique partitioning problem
-
Dorndorf, U., Jaehn, F., & Pesch, E. (2008). Modelling robust flight gate scheduling as a clique partitioning problem. Transportation Science, 42, 292-301.
-
(2008)
Transportation Science
, vol.42
, pp. 292-301
-
-
Dorndorf, U.1
Jaehn, F.2
Pesch, E.3
-
13
-
-
39049089655
-
Multicriteria airport gate assignment and pareto simulated annealing
-
Drexl, A., & Nikulin, Y. (2008). Multicriteria airport gate assignment and pareto simulated annealing. IIE Transactions, 40, 385-397.
-
(2008)
IIE Transactions
, vol.40
, pp. 385-397
-
-
Drexl, A.1
Nikulin, Y.2
-
14
-
-
77955919609
-
Theoretical aspects of multicriteria flight gate scheduling: deterministic and fuzzy models
-
Drexl, A., & Nikulin, Y. (2010). Theoretical aspects of multicriteria flight gate scheduling: deterministic and fuzzy models. Journal of Scheduling, 13, 261-280.
-
(2010)
Journal of Scheduling
, vol.13
, pp. 261-280
-
-
Drexl, A.1
Nikulin, Y.2
-
15
-
-
0020709558
-
On the complexity of partitioning graphs into connected subgraphs
-
Dyer, M., & Frieze, A. (1985). On the complexity of partitioning graphs into connected subgraphs. Discrete Applied Mathematics, 10, 139-153.
-
(1985)
Discrete Applied Mathematics
, vol.10
, pp. 139-153
-
-
Dyer, M.1
Frieze, A.2
-
17
-
-
84869596327
-
Solving the flight gate assignment problem using dynamic programming
-
Jaehn, F. (2010). Solving the flight gate assignment problem using dynamic programming. Zeitschrift für Betriebswirtschaft, 80, 1027-1039.
-
(2010)
Zeitschrift für Betriebswirtschaft
, vol.80
, pp. 1027-1039
-
-
Jaehn, F.1
-
19
-
-
0022060235
-
Optimizing gate assignment at airport terminals
-
Mangoubi, R. S., & Mathaisel, D. F. X. (1985). Optimizing gate assignment at airport terminals. Transportation Science, 19, 173-188.
-
(1985)
Transportation Science
, vol.19
, pp. 173-188
-
-
Mangoubi, R.S.1
Mathaisel, D.F.X.2
-
21
-
-
60449097879
-
A survey of search methodologies and automated system development for examination timetabling
-
Qu, R., Burke, E., McCollum, B., Merlot, L., & Lee, S. (2009). A survey of search methodologies and automated system development for examination timetabling. Journal of Scheduling, 12, 55-89.
-
(2009)
Journal of Scheduling
, vol.12
, pp. 55-89
-
-
Qu, R.1
Burke, E.2
McCollum, B.3
Merlot, L.4
Lee, S.5
-
24
-
-
0035370609
-
Optimization of multiple objective gate assignments
-
Yan, S., & Huo, C. (2001). Optimization of multiple objective gate assignments. Transportation Research, A, 35, 413-432.
-
(2001)
Transportation Research, A
, vol.35
, pp. 413-432
-
-
Yan, S.1
Huo, C.2
-
25
-
-
33846657372
-
A heuristic approach for airport gate assignments for stochastic flight delays
-
Yan, S., & Tang, C. (2007). A heuristic approach for airport gate assignments for stochastic flight delays. European Journal of Operational Research, 180, 547-567.
-
(2007)
European Journal of Operational Research
, vol.180
, pp. 547-567
-
-
Yan, S.1
Tang, C.2
-
26
-
-
0028510750
-
A comparative study of an aircraft assignment problem at a large aircraft
-
Zhang, S. X., Cesarone, J., & Miller, F. (1994). A comparative study of an aircraft assignment problem at a large aircraft. International Journal of Industrial Engineering, 1, 203-212.
-
(1994)
International Journal of Industrial Engineering
, vol.1
, pp. 203-212
-
-
Zhang, S.X.1
Cesarone, J.2
Miller, F.3
|