-
1
-
-
0345886432
-
-
MIT Department of Electrical Engineering and Computer Science, Cambridge, MA, USA
-
AGEEVA Y. 2000. Approaches to incorporating robustness into airline scheduling, Linköping, Sweden Master's thesis, MIT Department of Electrical Engineering and Computer Science, Cambridge, MA, USA.
-
(2000)
Approaches to incorporating robustness into airline scheduling, Linköping, Sweden Master's thesis
-
-
AGEEVA, Y.1
-
2
-
-
0001779405
-
A global approach to crew-pairing optimization
-
ANBIL, R., R. TANGA and E. JOHNSON (1992), A global approach to crew-pairing optimization, IBM Systems Journal 31, 71-78.
-
(1992)
IBM Systems Journal
, vol.31
, pp. 71-78
-
-
ANBIL, R.1
TANGA, R.2
JOHNSON, E.3
-
3
-
-
33846877937
-
-
Thesis, Linköping University, Linköping, Sweden
-
ANDERSSON, T. (2001) The flight perturbation problem-operational aircraft rescheduling, Lic. Thesis, Linköping University, Linköping, Sweden.
-
(2001)
The flight perturbation problem-operational aircraft rescheduling, Lic
-
-
ANDERSSON, T.1
-
4
-
-
7444251643
-
Robust scheduling of parallel machines with sequence-dependent set-up costs
-
ANGLANI, A., A. GRIECO, E. GUERRIERO and R. MUSMANNO (2003), Robust scheduling of parallel machines with sequence-dependent set-up costs, European Journal of Operational Research 161, 704-720.
-
(2003)
European Journal of Operational Research
, vol.161
, pp. 704-720
-
-
ANGLANI, A.1
GRIECO, A.2
GUERRIERO, E.3
MUSMANNO, R.4
-
5
-
-
24144491827
-
A grasp for aircraft routing in response to groundings and delays
-
ARGÜELLO, M., J. BARD and G. YU (1997), A grasp for aircraft routing in response to groundings and delays, Journal of Combinatorial Optimization 5, 211-228.
-
(1997)
Journal of Combinatorial Optimization
, vol.5
, pp. 211-228
-
-
ARGÜELLO, M.1
BARD, J.2
YU, G.3
-
6
-
-
0021643930
-
Aircraft stand assignment to minimize walking
-
BABIC, O., D. TEODOROVIC and V. TOSIC (1984), Aircraft stand assignment to minimize walking, Journal of Transportation Engineering 110, 55-66.
-
(1984)
Journal of Transportation Engineering
, vol.110
, pp. 55-66
-
-
BABIC, O.1
TEODOROVIC, D.2
TOSIC, V.3
-
7
-
-
0035480369
-
Optimizing aircraft routings in response to groundings and delays
-
BARD, J., G. Yu and M. ARGÜELLO (2001), Optimizing aircraft routings in response to groundings and delays, IIE Transportations 33, 931-947.
-
(2001)
IIE Transportations
, vol.33
, pp. 931-947
-
-
BARD, J.1
Yu, G.2
ARGÜELLO, M.3
-
8
-
-
0010236428
-
-
Working Paper, MIT Center for Transportation Studies. Cambridge, MA, USA
-
BARNHART, C. (1997), Flight string models for aircraft fleeting and routing, Working Paper, MIT Center for Transportation Studies. Cambridge, MA, USA.
-
(1997)
Flight string models for aircraft fleeting and routing
-
-
BARNHART, C.1
-
9
-
-
0000816725
-
Branch-and-price: Column generation for solving huge integer programs
-
BARNHART, C., E. L. JOHNSON, G. L. NEMHAUSER, M. W. P. SAVELSBERGH and P. H. VANCE (1998), Branch-and-price: column generation for solving huge integer programs, Operations Research 46, 316-329.
-
(1998)
Operations Research
, vol.46
, pp. 316-329
-
-
BARNHART, C.1
JOHNSON, E.L.2
NEMHAUSER, G.L.3
SAVELSBERGH, M.W.P.4
VANCE, P.H.5
-
10
-
-
33846887936
-
Making airline schedules more robust
-
Nottingham UK
-
BIAN, F., E. BURKE, S. JAIN, G. KENDALL, G. M. KOOLE, J. D. LANDA SILVA, J. MULDER, M. C. E. PAELINCK, C. REEVES, I. RUSDI and M. O. SULEMAN (2003), Making airline schedules more robust, Proceedings of the first Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA 2003), Nottingham UK, 678-693.
-
(2003)
Proceedings of the first Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA 2003)
, pp. 678-693
-
-
BIAN, F.1
BURKE, E.2
JAIN, S.3
KENDALL, G.4
KOOLE, G.M.5
LANDA SILVA, J.D.6
MULDER, J.7
PAELINCK, M.C.E.8
REEVES, C.9
RUSDI, I.10
SULEMAN, M.O.11
-
11
-
-
0025642317
-
A conceptual solution to the aircraft gate assignment problem using, 0, llinear programming
-
BIHR, R. A. (1990), A conceptual solution to the aircraft gate assignment problem using, 0, llinear programming, Computers and Industrial Engineering 19, 280-284.
-
(1990)
Computers and Industrial Engineering
, vol.19
, pp. 280-284
-
-
BIHR, R.A.1
-
12
-
-
0032654362
-
Assigning arriving aircraft flights at an airport to available gates
-
BOLAT, A. (1999), Assigning arriving aircraft flights at an airport to available gates, Journal of the Operational Research Society 50, 23-34.
-
(1999)
Journal of the Operational Research Society
, vol.50
, pp. 23-34
-
-
BOLAT, A.1
-
13
-
-
0002969484
-
Procedures for providing robust gate assignments for arriving aircrafts
-
BOLAT, A. (2000a), Procedures for providing robust gate assignments for arriving aircrafts, European Journal of Operational Research 120, 63-80.
-
(2000)
European Journal of Operational Research
, vol.120
, pp. 63-80
-
-
BOLAT, A.1
-
14
-
-
0035493959
-
Models and a genetic algorithm for static aircraft-gate assignment problem
-
BOLAT, A. (2000b), Models and a genetic algorithm for static aircraft-gate assignment problem, Journal of the Operational Research Society 52, 1107-1120.
-
(2000)
Journal of the Operational Research Society
, vol.52
, pp. 1107-1120
-
-
BOLAT, A.1
-
16
-
-
0000432042
-
Reducing walking distance at existing airports
-
BRAAKSMA, J. P. (1977), Reducing walking distance at existing airports. Airport Forum 4, 135-142.
-
(1977)
Airport Forum
, vol.4
, pp. 135-142
-
-
BRAAKSMA, J.P.1
-
17
-
-
0006187571
-
A multiplier adjustment approach for the set partitioning problem
-
CHAN, T. J. and C. A. YANO (1992), A multiplier adjustment approach for the set partitioning problem. Operations Research 40, S40-S47.
-
(1992)
Operations Research
, vol.40
-
-
CHAN, T.J.1
YANO, C.A.2
-
18
-
-
0031220061
-
A knowledge-based airport gate assignment system integrated with mathematical programming
-
CHENG, Y. (1997), A knowledge-based airport gate assignment system integrated with mathematical programming, Computers and Industrial Engineering 32, 837-852.
-
(1997)
Computers and Industrial Engineering
, vol.32
, pp. 837-852
-
-
CHENG, Y.1
-
19
-
-
0031103502
-
Solving large scale crew scheduling problems
-
CHU, H. D., E. GELMAN and E. L. JOHNSON (1997), Solving large scale crew scheduling problems, European Journal of Operational Research 97, 260-268.
-
(1997)
European Journal of Operational Research
, vol.97
, pp. 260-268
-
-
CHU, H.D.1
GELMAN, E.2
JOHNSON, E.L.3
-
20
-
-
33846879283
-
-
DESROSIERS, J., Y. DUMAS, M. DESROCHERS, F. SOUMIS, B. SANSO and P. TRUDEAU (1991), A breakthrough in airline crew scheduling, Technical Report G-91-11, Cahiers du GERAD.
-
DESROSIERS, J., Y. DUMAS, M. DESROCHERS, F. SOUMIS, B. SANSO and P. TRUDEAU (1991), A breakthrough in airline crew scheduling, Technical Report G-91-11, Cahiers du GERAD.
-
-
-
-
22
-
-
0034271995
-
Constraint propagation techniques for disjunctive scheduling problems
-
DORNDORF, U., E. PESCH and T. PHAN HUY (2000a), Constraint propagation techniques for disjunctive scheduling problems, Artificial intelligence 122, 189-240.
-
(2000)
Artificial intelligence
, vol.122
, pp. 189-240
-
-
DORNDORF, U.1
PESCH, E.2
PHAN HUY, T.3
-
23
-
-
0034296143
-
A time-oriented branch-and-bound algorithm for the resource constrained project scheduling problem with generalized precedence constraints
-
DORNDORF, U., E. PESCH and T. PHAN HUY (2000b), A time-oriented branch-and-bound algorithm for the resource constrained project scheduling problem with generalized precedence constraints, Management Science 46, 1365-1384.
-
(2000)
Management Science
, vol.46
, pp. 1365-1384
-
-
DORNDORF, U.1
PESCH, E.2
PHAN HUY, T.3
-
24
-
-
33748281347
-
Flight gate scheduling: State-of-the-art and recent developments
-
DORNDORF, U., A. DREXL, Y NIKULIN and E. PESCH (2007), Flight gate scheduling: state-of-the-art and recent developments, Omega 35, 326-334.
-
(2007)
Omega
, vol.35
, pp. 326-334
-
-
DORNDORF, U.1
DREXL, A.2
NIKULIN, Y.3
PESCH, E.4
-
25
-
-
33750695134
-
Constructing robust crew schedules with bicriteria optimization
-
EHRGOTT, M. and D. RYAN (2002), Constructing robust crew schedules with bicriteria optimization, Journal of Multi-Criteria Decision Analysis 11, 139-150.
-
(2002)
Journal of Multi-Criteria Decision Analysis
, vol.11
, pp. 139-150
-
-
EHRGOTT, M.1
RYAN, D.2
-
26
-
-
0000291432
-
Optimizing flight crew schedules
-
GERSHKOFF, I. (1989), Optimizing flight crew schedules, Interfaces 19, 29-43.
-
(1989)
Interfaces
, vol.19
, pp. 29-43
-
-
GERSHKOFF, I.1
-
27
-
-
0027615122
-
Flight crew scheduling
-
GRAVES, G. W., R. D. MCBRIDE, I. GERSHKOFF, D. ANDERSON and D. MAHIDHARA (1993), Flight crew scheduling, Management Science 39, 736-745.
-
(1993)
Management Science
, vol.39
, pp. 736-745
-
-
GRAVES, G.W.1
MCBRIDE, R.D.2
GERSHKOFF, I.3
ANDERSON, D.4
MAHIDHARA, D.5
-
28
-
-
0033181538
-
Genetic Algorithm Approach to Aircraft Gate Reassignment Problem
-
GU, G. and C. CHUNG, (1999), Genetic Algorithm Approach to Aircraft Gate Reassignment Problem, ASCE Journal of Transportation Engineering 125, 384-389.
-
(1999)
ASCE Journal of Transportation Engineering
, vol.125
, pp. 384-389
-
-
GU, G.1
CHUNG, C.2
-
29
-
-
0032141534
-
Optimizing gate assignments at airport terminals
-
HAGHANI, A. and M. CHEN, (1998), Optimizing gate assignments at airport terminals, Transportation Research A 32, 437-454.
-
(1998)
Transportation Research A
, vol.32
, pp. 437-454
-
-
HAGHANI, A.1
CHEN, M.2
-
30
-
-
33748649518
-
Fuzzy multi-mode resource constrained project scheduling with multiple objectives
-
ch. 16, J. WEGLARZ ed, Kluwer Academic Publishers, Dordrecht
-
HAPKE M., A. JASZKIEWICZ, R. SLOWIŃSKI (1998), Fuzzy multi-mode resource constrained project scheduling with multiple objectives, ch. 16, in: J. WEGLARZ (ed.), Recent advances in project scheduling, Kluwer Academic Publishers, Dordrecht, 355-382.
-
(1998)
Recent advances in project scheduling
, pp. 355-382
-
-
HAPKE, M.1
JASZKIEWICZ, A.2
SLOWIŃSKI, R.3
-
31
-
-
0034245064
-
Pareto simulated annealing for fuzzy multiobjective combinatorial optimization
-
HAPKE, M., A. JASZKIEWICZ, R. SLOWIŃSKI (2000), Pareto simulated annealing for fuzzy multiobjective combinatorial optimization, Journal of Heuristics 6, 329-345.
-
(2000)
Journal of Heuristics
, vol.6
, pp. 329-345
-
-
HAPKE, M.1
JASZKIEWICZ, A.2
SLOWIŃSKI, R.3
-
33
-
-
0027614308
-
Solving airline crew scheduling problems by branch-and-cut
-
HOFFMAN, K. L. and M. PADBERG (1993), Solving airline crew scheduling problems by branch-and-cut, Management Science 39, 657-682.
-
(1993)
Management Science
, vol.39
, pp. 657-682
-
-
HOFFMAN, K.L.1
PADBERG, M.2
-
34
-
-
0027646865
-
A decision support framework for airline flight cancellations and delays
-
JARRAH, A., G. YU, N. KRISHNAMURTHY and A. RAKSHIT (1993), A decision support framework for airline flight cancellations and delays, Transportation Science 27, 266-280.
-
(1993)
Transportation Science
, vol.27
, pp. 266-280
-
-
JARRAH, A.1
YU, G.2
KRISHNAMURTHY, N.3
RAKSHIT, A.4
-
35
-
-
0038628322
-
The LBS-discrete interactive procedure for multiple-criteria analysis of decision problems
-
J. CLIMACO ed, Springer Verlag, Berlin
-
JASZKIEWICZ, A. and R. SLOWIŃSKI (1997), The LBS-discrete interactive procedure for multiple-criteria analysis of decision problems, in: J. CLIMACO (ed.), Multicriteria analysis, Springer Verlag, Berlin, 320-330.
-
(1997)
Multicriteria analysis
, pp. 320-330
-
-
JASZKIEWICZ, A.1
SLOWIŃSKI, R.2
-
36
-
-
0035479870
-
Solving large airline crew scheduling problems: Random pairing generation and strong branching
-
KLABJAN, D., E. L. JOHNSON and G. L. NEMHAUSER (2001), Solving large airline crew scheduling problems: random pairing generation and strong branching, Computational Optimization and Applications 20, 73-91.
-
(2001)
Computational Optimization and Applications
, vol.20
, pp. 73-91
-
-
KLABJAN, D.1
JOHNSON, E.L.2
NEMHAUSER, G.L.3
-
37
-
-
33846887937
-
-
Working paper, Journal of Air Transport Management, to appear
-
KOHL, N., A. LARSEN, J. LARSEN, A. ROSS and S. TIOURINE (2004), Airline disruption management - perspectives, experiences and outlook, Working paper, Journal of Air Transport Management, to appear.
-
(2004)
Airline disruption management - perspectives, experiences and outlook
-
-
KOHL, N.1
LARSEN, A.2
LARSEN, J.3
ROSS, A.4
TIOURINE, S.5
-
38
-
-
0004026669
-
-
PhD thesis, Georgia Institute of Technology, Atlanta, GA
-
LETTOVSKY, L. (1997), Airline operations recovery: an optimization approach, PhD thesis, Georgia Institute of Technology, Atlanta, GA.
-
(1997)
Airline operations recovery: An optimization approach
-
-
LETTOVSKY, L.1
-
40
-
-
0022060235
-
Optimizing gate assignment at airport terminals
-
MANGOUBI, R. S. and D. F. X. MATHAISEL (1985), Optimizing gate assignment at airport terminals, Transportation Science 19, 173-188.
-
(1985)
Transportation Science
, vol.19
, pp. 173-188
-
-
MANGOUBI, R.S.1
MATHAISEL, D.F.X.2
-
41
-
-
0018730045
-
Crew planning at flying tiger: A successful application of integer programming
-
MARSTEN, R. E., M. R. MULLER and C. L. KILLION (1979), Crew planning at flying tiger: a successful application of integer programming, Management Science 25, 1175-1183.
-
(1979)
Management Science
, vol.25
, pp. 1175-1183
-
-
MARSTEN, R.E.1
MULLER, M.R.2
KILLION, C.L.3
-
43
-
-
0345886421
-
-
Working paper, SISE, Georgia Institute of Technology, Atlanta, GA
-
ROSENBERGER, J., E. JOHNSON and G. NEMHAUSER (2001), A robust fleet assignment model with hub isolation and short cycles, Working paper, SISE, Georgia Institute of Technology, Atlanta, GA.
-
(2001)
A robust fleet assignment model with hub isolation and short cycles
-
-
ROSENBERGER, J.1
JOHNSON, E.2
NEMHAUSER, G.3
-
44
-
-
25144497559
-
Airline crew scheduling under uncertainty
-
SCHAEFER, A. J., E. L. JOHNSON, A. J. KLEYWEGT and G. L. NEMHAUSER (2004), Airline crew scheduling under uncertainty, Transportation Science 39, 340-348.
-
(2004)
Transportation Science
, vol.39
, pp. 340-348
-
-
SCHAEFER, A.J.1
JOHNSON, E.L.2
KLEYWEGT, A.J.3
NEMHAUSER, G.L.4
-
47
-
-
0141859879
-
A fuzzy robust scheduling approach for product development projects
-
WANG, J. (2002), A fuzzy robust scheduling approach for product development projects, European Journal of Operational Research 152, 180-194.
-
(2002)
European Journal of Operational Research
, vol.152
, pp. 180-194
-
-
WANG, J.1
-
49
-
-
0035370609
-
Optimization of multiple objective gate assignments
-
YAN, S. and C. HUO (2001), Optimization of multiple objective gate assignments, Transportation Research A 35, 413-432.
-
(2001)
Transportation Research A
, vol.35
, pp. 413-432
-
-
YAN, S.1
HUO, C.2
-
50
-
-
0031272668
-
Multifleet routing and multistop flight scheduling for schedule perturbation
-
YAN, S. and Y. TU (1997), Multifleet routing and multistop flight scheduling for schedule perturbation, European Journal of Operational Research 103, 155-169.
-
(1997)
European Journal of Operational Research
, vol.103
, pp. 155-169
-
-
YAN, S.1
TU, Y.2
-
51
-
-
0030409893
-
A decision support framework for handling schedule perturbation
-
YAN, S. and D. YANG (1996), A decision support framework for handling schedule perturbation, Transportation Research B 30, 405-419.
-
(1996)
Transportation Research B
, vol.30
, pp. 405-419
-
-
YAN, S.1
YANG, D.2
-
52
-
-
0030244759
-
A decision support framework for multi-fleet routing and multi-stop flight scheduling
-
YAN, S. and H. YOUNG (1996), A decision support framework for multi-fleet routing and multi-stop flight scheduling, Transportation Research A 30, 379-398.
-
(1996)
Transportation Research A
, vol.30
, pp. 379-398
-
-
YAN, S.1
YOUNG, H.2
-
53
-
-
0036896275
-
A simulation framework for evaluating airport gate assignments
-
YAN, S., C. SHIEH and M. CHEN (2002), A simulation framework for evaluating airport gate assignments, Transportation Research 36, 885-898.
-
(2002)
Transportation Research
, vol.36
, pp. 885-898
-
-
YAN, S.1
SHIEH, C.2
CHEN, M.3
-
54
-
-
4043181153
-
A stochastic programming approach to the airline crew scheduling problem
-
Technical report, University of Washington, Seattle, Seattle, WA
-
YEN, J. and J. BIRGE (2000), A stochastic programming approach to the airline crew scheduling problem, Technical report, University of Washington, Seattle, WA.
-
(2000)
-
-
YEN, J.1
BIRGE, J.2
-
55
-
-
0028510750
-
A comparative study of an aircraft assignment problem at a large aircraft
-
ZHANG, S. X., J. CESARONE and F. MILLER (1994), A comparative study of an aircraft assignment problem at a large aircraft, International Journal of Industrial Engineering 1, 203-212.
-
(1994)
International Journal of Industrial Engineering
, vol.1
, pp. 203-212
-
-
ZHANG, S.X.1
CESARONE, J.2
MILLER, F.3
-
56
-
-
0003909811
-
-
Kluwer, Boston
-
ZIMMERMANN, H.-J. (1987), Fuzzy sets, decision making, and expert systems, Kluwer, Boston.
-
(1987)
Fuzzy sets, decision making, and expert systems
-
-
ZIMMERMANN, H.-J.1
|