메뉴 건너뛰기




Volumn , Issue , 2011, Pages

Wind farm allocation in Malaysia based on multi-criteria decision making method

Author keywords

AHP; Fuzzy AHP; MCDM; TOPSIS; Wind farm allocation

Indexed keywords

AHP; FUZZY AHP; MCDM; TOPSIS; WIND FARM ALLOCATION;

EID: 84857090148     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/NatPC.2011.6136445     Document Type: Conference Paper
Times cited : (17)

References (25)
  • 2
    • 51649095576 scopus 로고    scopus 로고
    • Multi-criteria decision making on strategic selection of wind farms
    • Amy H. I. Lee, Hsing Hung Chen & He-Yau Kang., "Multi-criteria Decision Making on Strategic Selection of Wind Farms, " Renewable Energy, 34(2009), pp. 120-126, 2008
    • (2008) Renewable Energy , vol.34 , Issue.2009 , pp. 120-126
    • Lee, A.H.I.1    Chen, H.H.2    Kang, H.3
  • 4
    • 57649238858 scopus 로고    scopus 로고
    • Combining entropy weight and topsis method for information system selection
    • Chengdu. IEEE
    • Jingwen Huang, "Combining Entropy Weight and TOPSIS Method for Information System Selection, " IEEE Conference On Cybernetics And Intelligent Systems, 2008. Chengdu. IEEE. p. 1281, 2008
    • (2008) IEEE Conference on Cybernetics and Intelligent Systems, 2008 , pp. 1281
    • Huang, J.1
  • 6
    • 84857098776 scopus 로고    scopus 로고
    • An AHP-based study of WCM implementation factors in ISO 9001 certified manufacturingorganizations in trinidad and tabago
    • LONDON
    • Krystal Ramoutar & Chanan S. Syan, "An AHP-based Study of WCM Implementation Factors in ISO 9001 Certified ManufacturingOrganizations in Trinidad and Tabago, " Proceedings Of The World Congress On Engineering 2009. LONDON
    • (2009) Proceedings Opf the World Congress on Engineering
    • Ramoutar, K.1    Syan, C.S.2
  • 7
    • 0026106979 scopus 로고
    • Project risk assessment using the analytic hierachy process
    • Mohammad A. Mustafa., "Project Risk Assessment Using the Analytic Hierachy Process, " IEEE Transactions On Engineering Management, 38(1), pp. 46-52, 1991
    • (1991) IEEE Transactions on Engineering Management , vol.38 , Issue.1 , pp. 46-52
    • Mustafa, M.A.1
  • 10
    • 77957552448 scopus 로고    scopus 로고
    • FMCDM: A fuzzy multi-criteria decision-making hybrid approach to evaluate the damage level of typhoon: Integration of fuzzy AHP and fuzzy TOPSIS
    • Chengdu IEEE
    • Shi Yu, Kou Gang, Li Youyuan et al., "FMCDM: A Fuzzy Multi-Criteria Decision-Making Hybrid Approach to Evaluate the Damage Level of Typhoon: Integration of Fuzzy AHP and Fuzzy TOPSIS, " 3RD International Conference On Information Sciences And Interaction Sciences, 2010. Chengdu. IEEE. p. 666
    • (2010) 3RD International Conference on Information Sciences and Interaction Sciences , pp. 666
    • Yu, S.1    Gang, K.2    Youyuan, L.3
  • 12
    • 77951487154 scopus 로고    scopus 로고
    • A statistical analysis of wind speed data in west central part of karnataka based on weibull distribution function
    • Montreal: IEEE
    • B. G. Kumaraswamy, B. K. Keshavan & Suresh H. Jangamshetti, "A Statistical Analysis of Wind Speed Data in West Central Part of Karnataka Based on Weibull Distribution Function, " IEEE Electrical Power And Energy Conference, Montreal: IEEE. pp. 1-4, 2009
    • (2009) IEEE Electrical Power and Energy Conference , pp. 1-4
    • Kumaraswamy, B.G.1    Keshavan, B.K.2    Jangamshetti, S.H.3
  • 13
    • 33847385945 scopus 로고    scopus 로고
    • Investigation of wind characteristics and wind enery potential in kirklareli, Turkey
    • Gokcek M., Bayulken A. & Bekdemir S., "Investigation of Wind Characteristics and Wind Enery Potential in Kirklareli, Turkey, "Renewable Energy, 32 (2007), pp. 1739-1752, 2007
    • (2007) Renewable Energy , vol.32 , Issue.2007 , pp. 1739-1752
    • Gokcek, M.1    Bayulken, A.2    Bekdemir, S.3
  • 14
    • 56749169513 scopus 로고    scopus 로고
    • Some of the design and methodology considerations in wind resource assessment
    • R. D. Prasad, R. C. Bansal & M. Sauturaga., "Some of the Design and Methodology Considerations in Wind Resource Assessment, " IET Renewable Power Generation, 3(1), pp. 53-64, 2009
    • (2009) IET Renewable Power Generation , vol.3 , Issue.1 , pp. 53-64
    • Prasad, R.D.1    Bansal, R.C.2    Sauturaga, M.3
  • 15
    • 56949092137 scopus 로고    scopus 로고
    • Investigations of wind characteristics and assessment of wind generation potentiality in Uluda-Bursa, Turkey
    • Ucar A. & Balo F., "Investigations of Wind Characteristics and Assessment of Wind Generation Potentiality in Uluda?-Bursa, Turkey, " Applied Energy, 86 (2009), pp. 333-339
    • (2009) Applied Energy , vol.86 , pp. 333-339
    • Ucar, A.1    Balo, F.2
  • 16
    • 42149149854 scopus 로고    scopus 로고
    • The round-robin site assessment method: A new approach to wind energy site assessment
    • Lackner M. A., Rogers A. L. & Manwell J. F., "The Round-Robin Site Assessment Method: A New Approach to Wind Energy Site Assessment, " Renewable Energy, 33(2008), pp. 2019-2026
    • (2008) Renewable Energy , vol.33 , pp. 2019-2026
    • Lackner, M.A.1    Rogers, A.L.2    Manwell, J.F.3
  • 17
    • 71849115521 scopus 로고    scopus 로고
    • Uncertainty analysis of wind energy potential assessment
    • Soon-Duck Kwon, "Uncertainty Analysis of Wind Energy Potential Assessment, " Applied Energy, 87 (2010), pp. 856-865
    • (2010) Applied Energy , vol.87 , pp. 856-865
    • Kwon, S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.