메뉴 건너뛰기




Volumn 60, Issue 6, 2010, Pages 711-721

Fuzzy robust credibility-constrained programming for environmental management and planning

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER PROGRAMMING; CONSTRAINED OPTIMIZATION; COST BENEFIT ANALYSIS; DECISION MAKING; ENVIRONMENTAL MANAGEMENT; MEMBERSHIP FUNCTIONS; SENSITIVITY ANALYSIS;

EID: 77954578084     PISSN: 10962247     EISSN: 21622906     Source Type: Journal    
DOI: 10.3155/1047-3289.60.6.711     Document Type: Article
Times cited : (37)

References (33)
  • 1
    • 33947312158 scopus 로고    scopus 로고
    • IFRP: A hybrid interval-parameter fuzzy robust programming approach for waste management planning under uncertainty
    • DOI 10.1016/j.jenvman.2006.04.006, PII S0301479706001356
    • Nie, X.H.; Huang, G.H.; Li, Y.P.; Liu, L. IFRP: a Hybrid Interval-Parameter Fuzzy Robust Programming Approach for Waste Management Planning under Uncertainty; J. Environ. Manage. 2007, 84, 1-11. (Pubitemid 46437980)
    • (2007) Journal of Environmental Management , vol.84 , Issue.1 , pp. 1-11
    • Nie, X.H.1    Huang, G.H.2    Li, Y.P.3    Liu, L.4
  • 2
    • 0043177916 scopus 로고    scopus 로고
    • The Perspectives of Environmental Informatics and Systems Analysis
    • Huang, G.H.; Chang, N.B. The Perspectives of Environmental Informatics and Systems Analysis; J. Environ. Inform. 2003, 1, 1-7.
    • (2003) J. Environ. Inform. , vol.1 , pp. 1-7
    • Huang, G.H.1    Chang, N.B.2
  • 3
    • 84950938520 scopus 로고
    • Grey Linear Programming, Its Solving Approach, and Its Application
    • Huang, G.H.; Moore, R.D. Grey Linear Programming, Its Solving Approach, and Its Application; Int. J. Syst. Sci. 1993, 24, 159-172.
    • (1993) Int. J. Syst. Sci. , vol.24 , pp. 159-172
    • Huang, G.H.1    Moore, R.D.2
  • 4
    • 58149316321 scopus 로고    scopus 로고
    • Greenhouse Gas Mitigation-Induced Rough-Interval Programming for Municipal Solid Waste Management
    • doi: 10.3155/1047-3289.58.12.1546
    • Lu, H.W.; Huang, G.; Liu, Z.; He, L. Greenhouse Gas Mitigation-Induced Rough-Interval Programming for Municipal Solid Waste Management; J. Air & Waste Manage. Assoc. 2008, 58, 1546-1559; doi: 10.3155/1047-3289.58.12.1546.
    • (2008) J. Air & Waste Manage. Assoc. , vol.58 , pp. 1546-1559
    • Lu, H.W.1    Huang, G.2    Liu, Z.3    He, L.4
  • 5
    • 38349052291 scopus 로고    scopus 로고
    • An Inexact Fuzzy-Robust Two-Stage Programming Model for Managing Sulfur Dioxide Abatement under Uncertainty
    • Li, Y.P.; Huang, G.H.; Nie, X.H.; Nie, S.L. An Inexact Fuzzy-Robust Two-Stage Programming Model for Managing Sulfur Dioxide Abatement under Uncertainty; Environ. Model. Assess. 2008, 13, 77-91.
    • (2008) Environ. Model. Assess. , vol.13 , pp. 77-91
    • Li, Y.P.1    Huang, G.H.2    Nie, X.H.3    Nie, S.L.4
  • 6
    • 51949096030 scopus 로고    scopus 로고
    • Optimization of Regional Waste Management Systems Based on Inexact Semi-Infinite Programming
    • He, L.; Huang, G.H. Optimization of Regional Waste Management Systems Based on Inexact Semi-Infinite Programming; Can. J. Civil Eng. 2008, 35, 987-998.
    • (2008) Can. J. Civil Eng. , vol.35 , pp. 987-998
    • He, L.1    Huang, G.H.2
  • 7
    • 50149106532 scopus 로고    scopus 로고
    • ISMISIP: An Inexact Stochastic Mixed Integer Linear Semi-Infinite Programming Approach for Solid Waste Management and Planning under Uncertainty
    • Guo, P.; Huang, G.H.; He, L. ISMISIP: an Inexact Stochastic Mixed Integer Linear Semi-Infinite Programming Approach for Solid Waste Management and Planning under Uncertainty; Stoch. Environ. Res. Risk Assess. 2008, 22, 759-775.
    • (2008) Stoch. Environ. Res. Risk Assess. , vol.22 , pp. 759-775
    • Guo, P.1    Huang, G.H.2    He, L.3
  • 8
    • 13544266859 scopus 로고    scopus 로고
    • Combining Simulation with Evolutionary Algorithms for Optimal Planning under Uncertainty: An Application to Municipal Solid Waste Management Planning in the Regional Municipality of Hamilton-Wentworth
    • Yeomans, J.S.; Huang, G.H.; Yoogalingam, R. Combining Simulation with Evolutionary Algorithms for Optimal Planning under Uncertainty: an Application to Municipal Solid Waste Management Planning in the Regional Municipality of Hamilton-Wentworth; J. Environ. Inform. 2003, 2, 11-30.
    • (2003) J. Environ. Inform. , vol.2 , pp. 11-30
    • Yeomans, J.S.1    Huang, G.H.2    Yoogalingam, R.3
  • 9
    • 0000804474 scopus 로고    scopus 로고
    • Chance constrained programming with fuzzy parameters
    • PII S0165011496002369
    • Liu, B.D.; Iwamura, K. Chance Constrained Programming with Fuzzy Parameters; Fuzzy Sets Syst. 1998, 94, 227-237. (Pubitemid 128654789)
    • (1998) Fuzzy Sets and Systems , vol.94 , Issue.2 , pp. 227-237
    • Liu, B.1    Iwamura, K.2
  • 10
    • 45349084986 scopus 로고    scopus 로고
    • An Inexact Two-Stage Quadratic Program for Water Resources Planning
    • Huang, G.H.; Li, Y.P.; Xiao, H.N.; Qin, X.S. An Inexact Two-Stage Quadratic Program for Water Resources Planning; J. Environ. Inform. 2007, 10, 99-105.
    • (2007) J. Environ. Inform. , vol.10 , pp. 99-105
    • Huang, G.H.1    Li, Y.P.2    Xiao, H.N.3    Qin, X.S.4
  • 11
    • 0027386559 scopus 로고
    • Aquifer Remediation Design under Uncertainty Using a New Chance Constrained Programming Technique
    • Morgan, D.R.; Eheart, J.W.; Valocchi, A.J. Aquifer Remediation Design under Uncertainty Using a New Chance Constrained Programming Technique; Water Res. Res. 1993, 29, 551-561.
    • (1993) Water Res. Res. , vol.29 , pp. 551-561
    • Morgan, D.R.1    Eheart, J.W.2    Valocchi, A.J.3
  • 12
    • 0022101769 scopus 로고
    • SELECTING TOLERANCES in CHANCE-CONSTRAINED PROGRAMMING: A MULTIPLE OBJECTIVE LINEAR PROGRAMMING APPROACH
    • DOI 10.1016/0167-6377(85)90034-3
    • Rakes, T.R.; Reeves, G.R. Selecting Tolerances in Chance-Constrained Programming - a Multiple Objective Linear Programming Apprach; Operat. Res. Lett. 1985, 4, 65-69. (Pubitemid 15563141)
    • (1985) Operations Research Letters , vol.4 , Issue.2 , pp. 65-69
    • Rakes Terry, R.1    Reeves Gary, R.2
  • 13
    • 0040820269 scopus 로고
    • A Cutting Plane Approach for Chance Constrained Linear-Programs
    • Weintraub, A.; Vera, J. A Cutting Plane Approach for Chance Constrained Linear-Programs; Operat. Res. 1991, 39, 776-785.
    • (1991) Operat. Res. , vol.39 , pp. 776-785
    • Weintraub, A.1    Vera, J.2
  • 14
    • 38249013372 scopus 로고
    • A Chance-Constrained Fuzzy Goal Program
    • Mohamed, R.H. A Chance-Constrained Fuzzy Goal Program; Fuzzy Sets Syst. 1992, 47, 183-186.
    • (1992) Fuzzy Sets Syst. , vol.47 , pp. 183-186
    • Mohamed, R.H.1
  • 17
    • 49349133217 scopus 로고
    • Fuzzy Sets as a Basis for a Theory of Possibility
    • Zadeh, L.A. Fuzzy Sets as a Basis for a Theory of Possibility; Fuzzy Sets Syst. 1978, 1, 3-23.
    • (1978) Fuzzy Sets Syst. , vol.1 , pp. 3-23
    • Zadeh, L.A.1
  • 18
    • 0010965368 scopus 로고
    • When Upper Probabilities Are Possibility Measures
    • Dubois, D.; Prade, H. When Upper Probabilities Are Possibility Measures; Fuzzy Sets Syst. 1992, 49, 65-74.
    • (1992) Fuzzy Sets Syst. , vol.49 , pp. 65-74
    • Dubois, D.1    Prade, H.2
  • 19
    • 3042796443 scopus 로고    scopus 로고
    • Probability-Possibility Transformations, Triangular Fuzzy Sets, and Probabilistic Inequalities
    • Dubois, D. Probability-Possibility Transformations, Triangular Fuzzy Sets, and Probabilistic Inequalities; Reliable Comput. 2004, 10, 273-297.
    • (2004) Reliable Comput. , vol.10 , pp. 273-297
    • Dubois, D.1
  • 20
    • 0035483231 scopus 로고    scopus 로고
    • Fuzzy Random Chance-Constrained Programming
    • Liu, B. Fuzzy Random Chance-Constrained Programming; IEEE Trans. Fuzzy Syst. 2001, 9, 713-720.
    • (2001) IEEE Trans. Fuzzy Syst. , vol.9 , pp. 713-720
    • Liu, B.1
  • 21
    • 33745379371 scopus 로고    scopus 로고
    • Credibility-based chance-constrained integer programming models for capital budgeting with fuzzy parameters
    • DOI 10.1016/j.ins.2005.11.012, PII S0020025505003300
    • Huang, X.X. Credibility-Based Chance-Constrained Integer Programming Models for Capital Budgeting with Fuzzy Parameters; Inform. Sci. 2006, 176, 2698-2712. (Pubitemid 43946420)
    • (2006) Information Sciences , vol.176 , Issue.18 , pp. 2698-2712
    • Huang, X.1
  • 22
    • 35549011542 scopus 로고    scopus 로고
    • Fuzzy chance constrained linear programming model for optimizing the scrap charge in steel production
    • DOI 10.1016/j.ejor.2007.02.017, PII S0377221707002366
    • Rong, A.; Lahdelma, R. Fuzzy Chance Constrained Linear Programming Model for Optimizing the Scrap Charge in Steel Production; Eur. J. Operat. Res. 2008, 186, 953-964. (Pubitemid 350016641)
    • (2008) European Journal of Operational Research , vol.186 , Issue.3 , pp. 953-964
    • Rong, A.1    Lahdelma, R.2
  • 23
    • 0037620639 scopus 로고    scopus 로고
    • A Fuzzy-Stochastic Robust Programming Model for Regional Air Quality Management under Uncertainty
    • Liu, L.; Huang, G.H.; Fuller, G.A.; Zeng, G.M. A Fuzzy-Stochastic Robust Programming Model for Regional Air Quality Management under Uncertainty; Eng. Optim. 2003, 35, 177-199.
    • (2003) Eng. Optim. , vol.35 , pp. 177-199
    • Liu, L.1    Huang, G.H.2    Fuller, G.A.3    Zeng, G.M.4
  • 24
    • 0037121230 scopus 로고    scopus 로고
    • The Construction of Consistent Possibility and Necessity Measures
    • Jamison, K.D.; Lodwick, W.A. The Construction of Consistent Possibility and Necessity Measures; Fuzzy Sets Syst. 2002, 132, 1-10.
    • (2002) Fuzzy Sets Syst. , vol.132 , pp. 1-10
    • Jamison, K.D.1    Lodwick, W.A.2
  • 25
    • 0036685786 scopus 로고    scopus 로고
    • Expected value of fuzzy variable and fuzzy expected value models
    • DOI 10.1109/TFUZZ.2002.800692, PII 1011092002800692
    • Liu, B.; Liu, Y.K. Expected Value of Fuzzy Variable and Fuzzy Expected Value Models; IEEE Trans. Fuzzy Syst. 2002, 10, 445-450. (Pubitemid 34950049)
    • (2002) IEEE Transactions on Fuzzy Systems , vol.10 , Issue.4 , pp. 445-450
    • Liu, B.1    Liu, Y.-K.2
  • 26
    • 58149240901 scopus 로고    scopus 로고
    • A Hybrid Decision Tree Model Based on Credibility Theory
    • Qi, C. A Hybrid Decision Tree Model Based on Credibility Theory; Fuzzy Info. Eng. 2007, 40, 930-939.
    • (2007) Fuzzy Info. Eng. , vol.40 , pp. 930-939
    • Qi, C.1
  • 27
    • 51049095677 scopus 로고    scopus 로고
    • Quality Evaluation for Composting Products through Fuzzy Latent Component Analysis
    • Zhang, Y.M.; Huang, G.H.; He, L.; Li, Y.P. Quality Evaluation for Composting Products through Fuzzy Latent Component Analysis; Resources Conserv. Recycling 2008, 52, 1132-1140.
    • (2008) Resources Conserv. Recycling , vol.52 , pp. 1132-1140
    • Zhang, Y.M.1    Huang, G.H.2    He, L.3    Li, Y.P.4
  • 30
    • 0010680207 scopus 로고
    • Convex Programming with Set-Inclusive Constraints and Applications to Inexact Linear-Programming
    • Soyster, A.L. Convex Programming with Set-Inclusive Constraints and Applications to Inexact Linear-Programming; Operat. Res. 1973, 21, 1154-1157.
    • (1973) Operat. Res. , vol.21 , pp. 1154-1157
    • Soyster, A.L.1
  • 31
    • 67349094507 scopus 로고    scopus 로고
    • Inexact de Novo Programming for Water Resources Systems Planning
    • Zhang, Y.M.; Huang, G.H.; Zhang, X.D. Inexact De Novo Programming for Water Resources Systems Planning; Eur. J. Operat. Res. 2009, 199, 531-541.
    • (2009) Eur. J. Operat. Res. , vol.199 , pp. 531-541
    • Zhang, Y.M.1    Huang, G.H.2    Zhang, X.D.3
  • 32
    • 33847014539 scopus 로고    scopus 로고
    • A chance-constrained approach to stochastic line balancing problem
    • DOI 10.1016/j.ejor.2006.04.042, PII S0377221706003456
    • Agpak, K.; Gokcen, H. A Chance-Constrained Approach to Stochastic Line Balancing Problem; Eur. J. Operat. Res. 2007, 180, 1098-1115. (Pubitemid 46275293)
    • (2007) European Journal of Operational Research , vol.180 , Issue.3 , pp. 1098-1115
    • Agpak, K.1    Gokcen, H.2
  • 33
    • 45349092153 scopus 로고    scopus 로고
    • A Goal Programming Based Multi-Time Step Optimal Material Flow Analysis Model for Integrated Computer Waste Management
    • Ahluwalia, P.K.; Nema, A.K. A Goal Programming Based Multi-Time Step Optimal Material Flow Analysis Model for Integrated Computer Waste Management; J. Environ. Inform. 2007, 10, 82-98.
    • (2007) J. Environ. Inform. , vol.10 , pp. 82-98
    • Ahluwalia, P.K.1    Nema, A.K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.