메뉴 건너뛰기




Volumn 3, Issue , 2011, Pages 2318-2327

Estimating productivity of earthmoving operations using spatial technologies

Author keywords

[No Author keywords available]

Indexed keywords

CORRECTIVE ACTIONS; CYCLE TIME; DATA FITTINGS; EARTHMOVING OPERATIONS; JOB SITES; REMOTE MONITORING; SIMULATION SOFTWARE; SOFTWARE SYSTEMS; SPATIAL DATA; SPATIAL TECHNOLOGIES; SPREADSHEET APPLICATIONS;

EID: 84855761907     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (14)

References (17)
  • 1
    • 0024082533 scopus 로고
    • EXPERT SYSTEM FOR EARTHMOVING EQUIPMENT SELECTION IN ROAD CONSTRUCTION
    • Alkass, S., and Harris, F. 1988. Expert system for Earthmoving Equipment Selection in Road Construction. Journal of Construction Engineering and Management, ASCE, 114(3), 426-440. (Pubitemid 18655301)
    • (1988) Journal of Construction Engineering and Management , vol.114 , Issue.3 , pp. 426-440
    • Alkass, S.1    Harris, F.2
  • 2
    • 0034830440 scopus 로고    scopus 로고
    • A real-time localization system for compactors
    • Caterpillar Handbook, Caterpillar Inc., Peoria, II, edition 40
    • Bouvat, D., Froumentin, M., and Garcia, G. 2001. A real-time localization system for compactors. Autom. Constr., 10(4), 417-428. Caterpillar Handbook, Caterpillar Inc., Peoria, II, edition 40.
    • (2001) Autom. Constr. , vol.10 , Issue.4 , pp. 417-428
    • Bouvat, D.1    Froumentin, M.2    Garcia, G.3
  • 5
    • 33846660491 scopus 로고    scopus 로고
    • Simulation analysis of productivity variation by global positioning system (GPS) implementation in earthmoving operations
    • DOI 10.1139/L05-124
    • Han, S., Lee, S., Hong, T., and Chang, H. 2006. Simulation Analysis of Productivity Variation by Global Positioning System Implementation in Earthmoving Operations. Canadian Journal of Civil Engineering, 33(9): 1105-1114. doi: 10.1139/L05-124 (Pubitemid 46189980)
    • (2006) Canadian Journal of Civil Engineering , vol.33 , Issue.9 , pp. 1105-1114
    • Han, S.1    Lee, S.2    Hong, T.3    Chang, H.4
  • 16
    • 0033707986 scopus 로고    scopus 로고
    • The Computer Integrated Road Construction Project
    • Peyret, F., Jurasz, J., Carrel, A., Zekri, E., and Gorham, B. 2000. The Computer Integrated Road Construction Project. Auto. Constr., 9(3), 447-461.
    • (2000) Auto. Constr. , vol.9 , Issue.3 , pp. 447-461
    • Peyret, F.1    Jurasz, J.2    Carrel, A.3    Zekri, E.4    Gorham, B.5
  • 17
    • 84855815911 scopus 로고    scopus 로고
    • Monitoring Construction Equipment for Automated Project Performance Control
    • International Symposium on Automation and Robotics in Construction. Volvo Inc, edition 26
    • Sacks, R., Navon, R., Shapira, A. and Brodetzky, I. 2002. Monitoring Construction Equipment for Automated Project Performance Control. International Symposium on Automation and Robotics in Construction. Volvo Performance Handbook, Volvo Inc, edition 26.
    • (2002) Volvo Performance Handbook
    • Sacks, R.1    Navon, R.2    Shapira, A.3    Brodetzky, I.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.