-
2
-
-
32544435941
-
Bucket brigades revisited: Are they always effective?
-
DOI 10.1016/j.ejor.2004.08.044, PII S0377221704007829
-
Armbruster, D., E. S. Gel. 2006. Bucket brigades revisited: Are they always effective? Eur. J. Oper. Res. 172(1) 213-229. (Pubitemid 43234030)
-
(2006)
European Journal of Operational Research
, vol.172
, Issue.1
, pp. 213-229
-
-
Armbruster, D.1
Gel, E.S.2
-
3
-
-
33748982365
-
Bucket brigades with worker learning
-
DOI 10.1016/j.ejor.2005.06.052, PII S0377221705005886
-
Armbruster, D., E. S. Gel, J. Murakami. 2007. Bucket brigades with worker learning. Eur. J. Oper. Res. 176(1) 264-274. (Pubitemid 44442707)
-
(2007)
European Journal of Operational Research
, vol.176
, Issue.1
, pp. 264-274
-
-
Armbruster, D.1
Gel, E.S.2
Murakami, J.3
-
4
-
-
0002622989
-
A production line that balances itself
-
Bartholdi, J. J., III, D. D. Eisenstein. 1996a. A production line that balances itself. Oper. Res. 44(1) 21-34.
-
(1996)
Oper. Res.
, vol.44
, Issue.1
, pp. 21-34
-
-
Bartholdi, J.J.1
Eisenstein III, D.D.2
-
5
-
-
84855338710
-
-
The bucket brigade Web page
-
Bartholdi, J. J., III, D. D. Eisenstein. 1996b. The bucket brigade Web page. http://www.BucketBrigades.com.
-
(1996)
-
-
Bartholdi, J.J.1
Eisenstein III, D.D.2
-
6
-
-
25444529283
-
Using bucket brigades to migrate from craft manufacturing to assembly lines
-
Bartholdi, J. J., III, D. D. Eisenstein. 2005. Using bucket brigades to migrate from craft manufacturing to assembly lines. Manufacturing Service Oper. Management 7(2) 121-129.
-
(2005)
Manufacturing Service Oper. Management
, vol.7
, Issue.2
, pp. 121-129
-
-
Bartholdi, J.J.1
Eisenstein III, D.D.2
-
7
-
-
0032631927
-
Dynamics of two- and three-worker bucket brigade production lines
-
Bartholdi, J. J., III, L. A. Bunimovich, D. D. Eisenstein. 1999. Dynamics of two- and three-worker bucket brigade production lines. Oper. Res. 47(3) 488-491.
-
(1999)
Oper. Res.
, vol.47
, Issue.3
, pp. 488-491
-
-
Bartholdi, J.J.1
Bunimovich III, L.A.2
Eisenstein, D.D.3
-
8
-
-
0035460936
-
Performance of bucket brigades when work is stochastic
-
Bartholdi, J. J., III, D. D. Eisenstein, R. D. Foley. 2001. Performance of bucket brigades when work is stochastic. Oper. Res. 49(5) 710-719. (Pubitemid 34011322)
-
(2001)
Operations Research
, vol.49
, Issue.5
, pp. 710-719
-
-
Bartholdi III, J.J.1
Eisenstein, D.D.2
Foley, R.D.3
-
9
-
-
25144499288
-
Bucket brigades on in-tree assembly networks
-
DOI 10.1016/j.ejor.2004.07.034, PII S0377221704004916, Balancing Assembly and Transfer Lines
-
Bartholdi, J. J., III, D. D. Eisenstein, Y. F. Lim. 2006. Bucket brigades on in-tree assembly networks. Eur. J. Oper. Res. 168(3) 870-879. (Pubitemid 41336598)
-
(2006)
European Journal of Operational Research
, vol.168
, Issue.3
, pp. 870-879
-
-
Bartholdi III, J.J.1
Eisenstein, D.D.2
Lim, Y.F.3
-
10
-
-
67649802973
-
Deterministic chaos in a model of discrete manufacturing
-
Bartholdi, J. J., III, D. D. Eisenstein, Y. F. Lim. 2009. Deterministic chaos in a model of discrete manufacturing. Naval Res. Logist. 56(4) 293-299.
-
(2009)
Naval Res. Logist
, vol.56
, Issue.4
, pp. 293-299
-
-
Bartholdi, J.J.1
Eisenstein III, D.D.2
Lim, Y.F.3
-
11
-
-
25144487120
-
Recovering cyclic schedules using dynamic produce-up-to policies
-
DOI 10.1287/opre.1040.0201
-
Eisenstein, D. D. 2005. Recovering cyclic schedules using dynamic produce-up-to policies. Oper. Res. 53(4) 675-688. (Pubitemid 41344630)
-
(2005)
Operations Research
, vol.53
, Issue.4
, pp. 675-688
-
-
Eisenstein, D.D.1
-
12
-
-
63849230552
-
Maximizing throughput of bucket brigades on discrete work stations
-
Lim, Y. F., K. K. Yang. 2009. Maximizing throughput of bucket brigades on discrete work stations. Production Oper. Management 18(1) 48-59.
-
(2009)
Production Oper. Management
, vol.18
, Issue.1
, pp. 48-59
-
-
Lim, Y.F.1
Yang, K.K.2
-
13
-
-
25444439735
-
Assembly line designs that reduce the impact of personnel turnover
-
Phoenix, AZ
-
Villalobos, J. R., L. F. Muñoz, L. Mar. 1999a. Assembly line designs that reduce the impact of personnel turnover. Proc. IIE Solutions Conf., Phoenix, AZ.
-
(1999)
Proc. IIE Solutions Conf.
-
-
Villalobos, J.R.1
Munoz, L.F.2
Mar, L.3
-
14
-
-
63849215071
-
Bucket brigade: A new way to boost production
-
Villalobos, J. R., F. Estrada, L. F. Muñoz, L. Mar. 1999b. Bucket brigade: A new way to boost production. Twin Plant News 14(12) 57-61.
-
(1999)
Twin Plant News
, vol.14
, Issue.12
, pp. 57-61
-
-
Villalobos, J.R.1
Estrada, F.2
Munoz, L.F.3
Mar, L.4
|