메뉴 건너뛰기




Volumn 172, Issue 1, 2006, Pages 213-229

Bucket brigades revisited: Are they always effective?

Author keywords

Bucket brigades; Dynamical analysis; Dynamics of production systems

Indexed keywords

INDUSTRIAL ENGINEERING; INDUSTRIAL MANAGEMENT; PARAMETER ESTIMATION;

EID: 32544435941     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2004.08.044     Document Type: Article
Times cited : (38)

References (7)
  • 2
    • 0002622989 scopus 로고    scopus 로고
    • A production line that balances itself
    • J.J. Bartholdi III, and D.D. Eisenstein A production line that balances itself Operations Research 44 1 1996 21 34
    • (1996) Operations Research , vol.44 , Issue.1 , pp. 21-34
    • Iii, J.B.J.1    Eisenstein, D.D.2
  • 3
    • 32544444434 scopus 로고    scopus 로고
    • A bucket brigade assembly line with walk-back and hand-off times
    • Dept. of Industrial Engineering, Georgia Institute of Technology, Atlanta, GA 30332
    • Bartholdi III, J.J., Eisenstein, D.D., 2002. A bucket brigade assembly line with walk-back and hand-off times, Technical report, Dept. of Industrial Engineering, Georgia Institute of Technology, Atlanta, GA 30332.
    • (2002) Technical Report
    • Bartholdi III, J.J.1    Eisenstein, D.D.2
  • 4
    • 0032631927 scopus 로고    scopus 로고
    • Dynamics of two- and three-worker "bucket Brigade" production lines
    • J.J. Bartholdi, L.A. Bunimovich, and D.D. Eisenstein Dynamics of two- and three-worker "Bucket Brigade" production lines Operations Research 47 3 1999 488 491
    • (1999) Operations Research , vol.47 , Issue.3 , pp. 488-491
    • Bartholdi, J.J.1    Bunimovich, L.A.2    Eisenstein, D.D.3
  • 5
    • 0035460936 scopus 로고    scopus 로고
    • Performance of bucket brigades when work is stochastic
    • J.J. Bartholdi, D.D. Eisenstein, and R.D. Foley Performance of bucket brigades when work is stochastic Operations Research 49 5 2001 710 719
    • (2001) Operations Research , vol.49 , Issue.5 , pp. 710-719
    • Bartholdi, J.J.1    Eisenstein, D.D.2    Foley, R.D.3
  • 6
    • 0030247852 scopus 로고    scopus 로고
    • Performance of a manufacturing module with moving workers
    • D.P. Bischak Performance of a manufacturing module with moving workers IIE Transactions 28 1996 723 733
    • (1996) IIE Transactions , vol.28 , pp. 723-733
    • Bischak, D.P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.