-
1
-
-
33751017964
-
Double-cycling strategies for container ships and their effect on ship loading and unloading operations
-
A.V. Goodchild, C.F. Daganzo, "Double-cycling strategies for container ships and their effect on ship loading and unloading operations,"Transportation Science 40 (4), 473-48, 2006.
-
(2006)
Transportation Science
, vol.40
, Issue.4
, pp. 473-548
-
-
Goodchild, A.V.1
Daganzo, C.F.2
-
2
-
-
0024686408
-
The crane scheduling problem
-
C.F. Daganzo, "The crane scheduling problem." Transportation Research Part B 23 (3), 159-175, 1989.
-
(1989)
Transportation Research Part B
, vol.23
, Issue.3
, pp. 159-175
-
-
Daganzo, C.F.1
-
3
-
-
0025436513
-
A branch and bound solution method for the crane scheduling problem
-
R.I. Peterkofsky, C.F. Daganzo, "A branch and bound solution method for the crane scheduling problem," Transportation Research Part B 24 (3), 159-172, 1990.
-
(1990)
Transportation Research Part B
, vol.24
, Issue.3
, pp. 159-172
-
-
Peterkofsky, R.I.1
Daganzo, C.F.2
-
4
-
-
1642618965
-
A crane scheduling method for port container terminals
-
K.H. Kim, Y.M. Park, "A crane scheduling method for port container terminals," European Journal of Operational Research 156 (3), 752-768, 2004.
-
(2004)
European Journal of Operational Research
, vol.156
, Issue.3
, pp. 752-768
-
-
Kim, K.H.1
Park, Y.M.2
-
5
-
-
34948884022
-
Quay crane scheduling with non-interference constraints in port container terminals
-
DOI 10.1016/j.tre.2006.08.001, PII S1366554506000846
-
D.H. Lee, H.Q. Wang, L. Miao, "Quay crane scheduling with noninterference constraints in port container terminals," Transportation Research Part E 44 (1), 124-135, 2008. (Pubitemid 47528130)
-
(2008)
Transportation Research Part E: Logistics and Transportation Review
, vol.44
, Issue.1
, pp. 124-135
-
-
Lee, D.-H.1
Wang, H.Q.2
Miao, L.3
-
6
-
-
1842611395
-
Crane scheduling with spatial constraints
-
A. Lim, B. Rodrigues, F., Xiao, Y. Zhu, "Crane scheduling with spatial constraints," Naval Research Logistics 51 (3), 386-406, 2004.
-
(2004)
Naval Research Logistics
, vol.51
, Issue.3
, pp. 386-406
-
-
Lim, A.1
Rodrigues, B.2
Xiao, F.3
Zhu, Y.4
-
7
-
-
33751071819
-
Crane scheduling with non-crossing constraint
-
Y. Zhu, A. Lim, "Crane scheduling with non-crossing constraint,"Journal of the Operational Research Society 57 (12), 1464-1471, 2006.
-
(2006)
Journal of the Operational Research Society
, vol.57
, Issue.12
, pp. 1464-1471
-
-
Zhu, Y.1
Lim, A.2
-
8
-
-
34250626149
-
Crane double cycling in container ports: Planning methods and evaluation
-
DOI 10.1016/j.trb.2007.02.006, PII S0191261507000203
-
A.V. Goodchild, C.F. Daganzo, "Crane double cycling in container ports: planning methods and evaluation," Transportation Research Part B 41 (8), 875-891, 2007. (Pubitemid 46930648)
-
(2007)
Transportation Research Part B: Methodological
, vol.41
, Issue.8
, pp. 875-891
-
-
Goodchild, A.V.1
Daganzo, C.F.2
-
9
-
-
77953540653
-
Container sequencing for quay cranes with internal reshuffles
-
F. Meisel, M. Wichmann, "Container sequencing for quay cranes with internal reshuffles," OR Spectrum,32, 569-591,2010.
-
(2010)
OR Spectrum
, vol.32
, pp. 569-591
-
-
Meisel, F.1
Wichmann, M.2
-
10
-
-
60549109062
-
Maximizing the number of dual-cycle operations of quay cranes in container terminals
-
H.P. Zhang, K.H. Kim," Maximizing the number of dual-cycle operations of quay cranes in container terminals," Computers and Industrial Engineering 56 (3), 979-992, 2009.
-
(2009)
Computers and Industrial Engineering
, vol.56
, Issue.3
, pp. 979-992
-
-
Zhang, H.P.1
Kim, K.H.2
-
11
-
-
0003075019
-
Optimal two- And three-stage production schedules with setup times
-
S. Johnson, "Optimal two- and three-stage production schedules with setup times," Naval Research Logistics Quarterly 1 (1), 61-68, 1954.
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, Issue.1
, pp. 61-68
-
-
Johnson, S.1
-
12
-
-
44849090921
-
Efficient Composite Heuristics for Total Flowtime Minimization in Permutation Flow Shops
-
X.P. Li, Q. Wang, C. Wu, "Efficient Composite Heuristics for Total Flowtime Minimization in Permutation Flow Shops," OMEGA, 37(1): 155- 164. 2009.
-
(2009)
OMEGA
, vol.37
, Issue.1
, pp. 155-164
-
-
Li, X.P.1
Wang, Q.2
Wu, C.3
|