-
1
-
-
58049139009
-
-
The Project management Institute, Inc Third Edition, ISBN 193069980-8
-
The Project management Institute, Inc., "A Guid to the Project Management Body of Knowledge", Third Edition, ISBN 193069980-8, 2004.
-
(2004)
A Guid to the Project Management Body of Knowledge
-
-
-
2
-
-
83755213973
-
Research on cost control methods of equipment engineering supervision
-
April
-
Juguang Peng, Quan Pan, "Research on Cost Control Methods of Equipment Engineering Supervision", Control Engineering, April.2006.
-
(2006)
Control Engineering
-
-
Peng, J.1
Pan, Q.2
-
3
-
-
83755223744
-
Research on cost control model of equipment engineering superivision
-
July
-
Juguang Peng, Quan Pan, "Research on Cost Control Model of Equipment Engineering Superivision", Computer Engineering and Application, July. 2006.
-
(2006)
Computer Engineering and Application
-
-
Peng, J.1
Pan, Q.2
-
4
-
-
83755217091
-
Discussion on investment ControI over construction project by phases
-
Sep.
-
Ying chen, "Discussion on Investment ControI over Construction Project by Phases", building construction, Vol. 31, Sep. 2009, pp.826-828.
-
(2009)
Building Construction
, vol.31
, pp. 826-828
-
-
Chen, Y.1
-
5
-
-
83755199450
-
The whole process covered cost control of construction project
-
Aihua Di, Yaolin Li, "The whole Process covered Cost Control of Construction project", Chinese hi-tech enterprises, Vol 134, No.23, 2009.
-
(2009)
Chinese Hi-tech Enterprises
, vol.134
, Issue.23
-
-
Di, A.1
Li, Y.2
-
6
-
-
83755217091
-
Discussion on investment ControI overConstruction project by phases
-
Cheng Ying, "Discussion on Investment ControI overConstruction Project by Phases", Building Construction, Vol.31 No.9, 2009. pp826-828.
-
(2009)
Building Construction
, vol.31
, Issue.9
, pp. 826-828
-
-
Ying, C.1
-
7
-
-
83755217089
-
Investment control of petrochemical projec
-
August
-
Wang Wenhui, "Investment Control of Petrochemical Projec", Contemporary Chemical Industry, Vol. 38 No.4, August, 2009. pp429-432
-
(2009)
Contemporary Chemical Industry
, vol.38
, Issue.4
, pp. 429-432
-
-
Wang, W.1
-
8
-
-
77951156338
-
Cost control in the design stage of transmit electricity projects based on value engineering method
-
IEEE Press, 978-0-7695-3888-4/09, DOI 10.1109/KAM.2009.95
-
Yi Huang, Wenjie Huang, Yumin Shang, "Cost Control in the Design Stage of Transmit Electricity Projects based on Value Engineering Method," Proc. IEEE 2009 Second International Symposium on Knowledge Acquisition and Modeling, IEEE Press, 978-0-7695-3888-4/09, DOI 10.1109/KAM.2009.95.
-
Proc. IEEE 2009 Second International Symposium on Knowledge Acquisition and Modeling
-
-
Yi, H.1
Huang, W.2
Shang, Y.3
-
9
-
-
77649296144
-
Application research on the investment control of construction project with value engineering at design stage
-
IEEE Press. 978-0-7695-3876-1/09, DOI 10.1109/ICIII.2009.408
-
Xu Bing, "Application Research on the Investment Control of Construction Project with Value Engineering at Design Stage" Proc. 2009 International Conference on Information Management, Innovation Management and Industrial Engineering, IEEE Press. 978-0-7695-3876-1/09, DOI 10.1109/ICIII.2009.408.
-
Proc. 2009 International Conference on Information Management, Innovation Management and Industrial Engineering
-
-
Xu, B.1
|