|
Volumn 2, Issue , 2009, Pages 308-311
|
Cost control in the design stage of transmit electricity projects based on value engineering method
|
Author keywords
[No Author keywords available]
|
Indexed keywords
CONSTRUCTION PERIOD;
CONSTRUCTION QUALITY;
COST CONTROLS;
DESIGN PROPOSAL;
DESIGN STAGE;
INVESTMENT BENEFIT;
COST EFFECTIVENESS;
ELECTRIC NETWORK ANALYSIS;
INVESTMENTS;
KNOWLEDGE ACQUISITION;
VALUE ENGINEERING;
COST BENEFIT ANALYSIS;
|
EID: 77951156338
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: 10.1109/KAM.2009.95 Document Type: Conference Paper |
Times cited : (1)
|
References (8)
|