-
1
-
-
0002050141
-
Static scheduling algorithms for allocating directed task graphs to multiprocessors
-
Y.-K. Kwok and I. Ahmad, "Static Scheduling Algorithms for Allocating Directed Task Graphs to Multiprocessors," ACM Computing Surveys, vol. 31, no. 4, pp. 406-471, 1999.
-
(1999)
ACM Computing Surveys
, vol.31
, Issue.4
, pp. 406-471
-
-
Kwok, Y.-K.1
Ahmad, I.2
-
2
-
-
0024647955
-
Scheduling precedence graphs in systems with interprocessor communication times
-
J.-J. Hwang, Y.-C. Chow, F. D. Anger, and C.-Y. Lee, "Scheduling Precedence Graphs in Systems with Interprocessor Communication Times," SIAM J. Computing, vol. 18, no. 2, pp. 244-257, 1989.
-
(1989)
SIAM J. Computing
, vol.18
, Issue.2
, pp. 244-257
-
-
Hwang, J.-J.1
Chow, Y.-C.2
Anger, F.D.3
Lee, C.-Y.4
-
3
-
-
0030142084
-
Dynamic critical-path scheduling: An effective technique for allocating task graphs to multiprocessors
-
Y.-K. Kwok and I. Ahmad, "Dynamic Critical-Path Scheduling: An Effective Technique for Allocating Task Graphs to Multiprocessors," IEEE Trans. Parallel and Distributed Systems, vol. 7, no. 5, pp. 506-521, May 1996. (Pubitemid 126782383)
-
(1996)
IEEE Transactions on Parallel and Distributed Systems
, vol.7
, Issue.5
, pp. 506-521
-
-
Kwok, Y.-K.1
Ahmad, I.2
-
4
-
-
32544441155
-
Allocation and scheduling of conditional task graph in hardware/software co-synthesis
-
Y. Xie and W. Wolf, "Allocation and Scheduling of Conditional Task Graph in Hardware/Software Co-Synthesis," Proc. Conf. Design Automation and Test in Europe (DATE), pp. 620-625, 2001.
-
(2001)
Proc. Conf. Design Automation and Test in Europe (DATE)
, pp. 620-625
-
-
Xie, Y.1
Wolf, W.2
-
7
-
-
0025440941
-
Scheduling parallel program tasks onto arbitrary target machines
-
DOI 10.1016/0743-7315(90)90042-N
-
H. El-Rewini and T. G. Lewis, "Scheduling Parallel Program Tasks onto Arbitrary Target Machines," J. Parallel and Distributed Computing, vol. 9, no. 2, pp. 138-153, 1990. (Pubitemid 20729738)
-
(1990)
Journal of Parallel and Distributed Computing
, vol.9
, Issue.2
, pp. 138-153
-
-
El-Rewini Hesham1
Lewis, T.G.2
-
8
-
-
0032166239
-
On exploiting task duplication in parallel program scheduling
-
I. Ahmad and Y.-K. Kwok, "On Exploiting Task Duplication in Parallel Program Scheduling," IEEE Trans. Parallel and Distributed Systems, vol. 9, no. 9, pp. 872-892, Sept. 1998. (Pubitemid 128752026)
-
(1998)
IEEE Transactions on Parallel and Distributed Systems
, vol.9
, Issue.9
, pp. 872-892
-
-
Ahmad, I.1
Kwok, Y.-K.2
-
9
-
-
14944352998
-
Dealing with heterogeneity through limited duplication for scheduling precedence constrained task graphs
-
DOI 10.1016/j.jpdc.2004.11.006, PII S0743731504002229
-
S. Bansal, P. Kumar, and K. Singh, "Dealing with Heterogeneity through Limited Duplication for Scheduling Precedence Constrained Task Graphs," J. Parallel and Distributed Computing, vol. 65, no. 6, pp. 479-491, 2005. (Pubitemid 40370505)
-
(2005)
Journal of Parallel and Distributed Computing
, vol.65
, Issue.4
, pp. 479-491
-
-
Bansal, S.1
Kumar, P.2
Singh, K.3
-
10
-
-
46149101204
-
Task scheduling algorithm using minimized duplications in homogeneous systems
-
K. Shin, M. Cha, M. Jang, J. Jung, W. Yoon, and S. Choi, "Task Scheduling Algorithm Using Minimized Duplications in Homogeneous Systems," J. Parallel Distributed Computing, vol. 68, no. 8, pp. 1146-1156, 2008.
-
(2008)
J. Parallel Distributed Computing
, vol.68
, Issue.8
, pp. 1146-1156
-
-
Shin, K.1
Cha, M.2
Jang, M.3
Jung, J.4
Yoon, W.5
Choi, S.6
-
11
-
-
0036538070
-
An optimal scheduling algorithm based on task duplication
-
Apr.
-
C. I. Park and T. Y. Choe, "An Optimal Scheduling Algorithm Based on Task Duplication," IEEE Trans. Computers, vol. 51, no. 4, pp. 444-448, Apr. 2002.
-
(2002)
IEEE Trans. Computers
, vol.51
, Issue.4
, pp. 444-448
-
-
Park, C.I.1
Choe, T.Y.2
-
12
-
-
33745715052
-
Efficient techniques for clustering and scheduling onto embedded multiprocessors
-
DOI 10.1109/TPDS.2006.87
-
V. Kianzad and S. S. Bhattacharyya, "Efficient Techniques for Clustering and Scheduling onto Embedded Multiprocessors," IEEE Trans. Parallel Distributed System, vol. 17, no. 7, pp. 667-680, July 2006. (Pubitemid 43997189)
-
(2006)
IEEE Transactions on Parallel and Distributed Systems
, vol.17
, Issue.7
, pp. 667-680
-
-
Kianzad, V.1
Bhattacharyya, S.S.2
-
13
-
-
21244458140
-
Communication contention in task scheduling
-
DOI 10.1109/TPDS.2005.64
-
O. Sinnen and L. A. Sousa, "Communication Contention in Task Scheduling," IEEE Trans. Parallel Distributed Systems, vol. 16, no. 6, pp. 503-515, June 2005. (Pubitemid 40889855)
-
(2005)
IEEE Transactions on Parallel and Distributed Systems
, vol.16
, Issue.6
, pp. 503-515
-
-
Sinnen, O.1
Sousa, L.A.2
-
14
-
-
0031356812
-
Embedded program timing analysis based on path clustering and architecture classification
-
R. Ernst and W. Ye, "Embedded Program Timing Analysis Based on Path Clustering and Architecture Classification," Proc. IEEE/ACM Int'l Conf. Computer-Aided Design (ICCAD'97), pp. 598-604, 1997.
-
(1997)
Proc. IEEE/ACM Int'l Conf. Computer-aided Design (ICCAD'97)
, pp. 598-604
-
-
Ernst, R.1
Ye, W.2
-
15
-
-
46049096998
-
A static multiprocessor scheduling algorithm for arbitrary directed task graphs in uncertain environments
-
J. Yang, X. Ma, C. Hou, and Z. Yao, "A Static Multiprocessor Scheduling Algorithm for Arbitrary Directed Task Graphs in Uncertain Environments," Proc. Eighth Int'l Conf. Algorithms and Architectures for Parallel Processing (ICA3PP'08), pp. 18-29, 2008.
-
(2008)
Proc. Eighth Int'l Conf. Algorithms and Architectures for Parallel Processing (ICA3PP'08)
, pp. 18-29
-
-
Yang, J.1
Ma, X.2
Hou, C.3
Yao, Z.4
-
16
-
-
70349251537
-
Scheduling task dependence graphs with variable task execution times onto heterogeneous multiprocessors
-
N. R. Satish, K. Ravindran, and K. Keutzer, "Scheduling Task Dependence Graphs with Variable Task Execution Times onto Heterogeneous Multiprocessors," Proc. Eighth ACM Int'l Conf. Embedded Software (EMSOFT'08), pp. 149-158, 2008.
-
(2008)
Proc. Eighth ACM Int'l Conf. Embedded Software (EMSOFT'08)
, pp. 149-158
-
-
Satish, N.R.1
Ravindran, K.2
Keutzer, K.3
-
17
-
-
50249182387
-
Variation-aware task allocation and scheduling for MPSoC
-
F. Wang, C. Nicopoulos, X. Wu, Y. Xie, and N. Vijaykrishnan, "Variation-Aware Task Allocation and Scheduling for MPSoC," Proc. IEEE/ACM Int'l Conf. Computer-Aided Design, pp. 598-603, 2007.
-
(2007)
Proc. IEEE/ACM Int'l Conf. Computer-aided Design
, pp. 598-603
-
-
Wang, F.1
Nicopoulos, C.2
Wu, X.3
Xie, Y.4
Vijaykrishnan, N.5
-
19
-
-
0025682270
-
Low overhead parallel schedules for task graphs
-
R. Anderson, P. Beame, and W. Ruzzo, "Low Overhead Parallel Schedules for Task Graphs," Proc. Second Ann. ACM Symp. Parallel Algorithms and Architectures (SPAA'90), pp. 66-75, 1990.
-
(1990)
Proc. Second Ann. ACM Symp. Parallel Algorithms and Architectures (SPAA'90)
, pp. 66-75
-
-
Anderson, R.1
Beame, P.2
Ruzzo, W.3
-
20
-
-
0029702997
-
Real-time scheduling using compact task graphs
-
R. Gupta, D. Mosse, and R. Suchoza, "Real-Time Scheduling Using Compact Task Graphs," Proc. 16th Int'l Conf. Distributed Computing Systems (ICDCS'96), pp. 55-62, 1996.
-
(1996)
Proc. 16th Int'l Conf. Distributed Computing Systems (ICDCS'96)
, pp. 55-62
-
-
Gupta, R.1
Mosse, D.2
Suchoza, R.3
-
21
-
-
82555161741
-
-
"The TBB Task Scheduler," http://www.intel.com/technology/itj/ 2007/v11i4/5-foundations/4-tbb.htm, 2011.
-
(2011)
The TBB Task Scheduler
-
-
-
22
-
-
64349090871
-
Hybrid scheduling of dynamic task graphs with selective duplication for multiprocessors under memory and time constraints
-
P. Choudhury, R. Kumar, and P. P. Chakrabarti, "Hybrid Scheduling of Dynamic Task Graphs with Selective Duplication for Multiprocessors under Memory and Time Constraints," IEEE Trans. Parallel and Distributed Systems, pp. 967-980, 2008.
-
(2008)
IEEE Trans. Parallel and Distributed Systems
, pp. 967-980
-
-
Choudhury, P.1
Kumar, R.2
Chakrabarti, P.P.3
-
24
-
-
82555201547
-
-
"Task Graphs for Free 3.0," http://ziyang.eecs.umich.edu/ ~dickrp/tgff/download.html, 2011.
-
(2011)
Task Graphs for Free 3.0
-
-
|