메뉴 건너뛰기




Volumn 12, Issue 3, 2005, Pages 256-265

Computerized production layout of deterministic demand through resource utilization

Author keywords

Deterministic demand; Layout; Multi production line system; Production time interval

Indexed keywords

COMBINATORIAL MATHEMATICS; COMPUTER PROGRAMMING; NUMERICAL ANALYSIS; OPTIMIZATION; RESOURCE ALLOCATION; SENSITIVITY ANALYSIS;

EID: 33749465070     PISSN: 10724761     EISSN: 1943670X     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (2)

References (11)
  • 1
    • 0035277173 scopus 로고    scopus 로고
    • The maximal profit flow model in designing multiple-production-line system with obtainable resource capacity
    • Chen, M.S. and Lan, C.H. (2001). The maximal profit flow model in designing multiple-production-line system with obtainable resource capacity. International Journal of Production Economics, 70(2): 176-184.
    • (2001) International Journal of Production Economics , vol.70 , Issue.2 , pp. 176-184
    • Chen, M.S.1    Lan, C.H.2
  • 2
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • Cheng, T.C.E. and Gupta, M.C. (1989). Survey of scheduling research involving due date determination decisions. European Journal of Operational Research, 38: 156-166.
    • (1989) European Journal of Operational Research , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 3
    • 0028445470 scopus 로고
    • Parallel-machine scheduling problems with earliness and tardiness penalties
    • Cheng, T.C.E. and Chen, Z.L. (1994). Parallel-machine scheduling problems with earliness and tardiness penalties. Journal of the Operational Research Society, 45: 685-695.
    • (1994) Journal of the Operational Research Society , vol.45 , pp. 685-695
    • Cheng, T.C.E.1    Chen, Z.L.2
  • 4
    • 0042855279 scopus 로고    scopus 로고
    • Comments on: A comparative analysis for determining optimal price and order quantity when a sale increases demand
    • Joglekar P. and Lee, P. (1998). Comments on: A comparative analysis for determining optimal price and order quantity when a sale increases demand. European Journal of Operational Research, 109: 228-241.
    • (1998) European Journal of Operational Research , vol.109 , pp. 228-241
    • Joglekar, P.1    Lee, P.2
  • 5
    • 0023362311 scopus 로고
    • A linear programming approach to capacity estimation of automated production lines with finite buffers
    • John, P.K. (1987). A linear programming approach to capacity estimation of automated production lines with finite buffers. International Journal of Production Research, 25(6): 851-866.
    • (1987) International Journal of Production Research , vol.25 , Issue.6 , pp. 851-866
    • John, P.K.1
  • 6
    • 0031162742 scopus 로고    scopus 로고
    • Automated production line design with flexible unreliable machines for profit maximization
    • Kalir, A. and Arzi, Y. (1997). Automated production line design with flexible unreliable machines for profit maximization. International Journal of Production Research, 35(6): 165-1664.
    • (1997) International Journal of Production Research , vol.35 , Issue.6 , pp. 165-1664
    • Kalir, A.1    Arzi, Y.2
  • 7
    • 0032046750 scopus 로고    scopus 로고
    • Optimal design of flexible production lines with unreliable machines and infinite buffers
    • Kalir, A. and Arzi, Y. (1998). Optimal design of flexible production lines with unreliable machines and infinite buffers. IIE Transactions, 30: 391-399.
    • (1998) IIE Transactions , vol.30 , pp. 391-399
    • Kalir, A.1    Arzi, Y.2
  • 8
    • 0000505456 scopus 로고    scopus 로고
    • On a comparison of objective function in optimal design of flexible production line with the unreliable machines
    • Lan, T. S. and Lan, C. H. (2000). On a comparison of objective function in optimal design of flexible production line with the unreliable machines. Journal of Information & Optimization Sciences, 21(2): 221-231.
    • (2000) Journal of Information & Optimization Sciences , vol.21 , Issue.2 , pp. 221-231
    • Lan, T.S.1    Lan, C.H.2
  • 9
    • 33749498993 scopus 로고
    • Common due-date assignment to minimize total penalty for the one machine scheduling problem
    • Panwalker, S.S., Smith, M.L., and Seidman, A. (1994). Common due-date assignment to minimize total penalty for the one machine scheduling problem. Operations Research, 41: 33-46.
    • (1994) Operations Research , vol.41 , pp. 33-46
    • Panwalker, S.S.1    Smith, M.L.2    Seidman, A.3
  • 10
    • 0031145351 scopus 로고    scopus 로고
    • Manufacturing setup cost reduction under variable lead times and finite opportunities for investment
    • Sarker, B.R., and Coates, E.R. (1997). Manufacturing setup cost reduction under variable lead times and finite opportunities for investment. International Journal of Production Economics 49(3): 237-247.
    • (1997) International Journal of Production Economics , vol.49 , Issue.3 , pp. 237-247
    • Sarker, B.R.1    Coates, E.R.2
  • 11
    • 0027640712 scopus 로고
    • A line-balance-based capacity planning procedure for series-type robotic assembly line
    • Tzai, D.M. and Yao, M.J. (1993). A line-balance-based capacity planning procedure for series-type robotic assembly line. International Journal of Production Research, 31(8): 1901-1920.
    • (1993) International Journal of Production Research , vol.31 , Issue.8 , pp. 1901-1920
    • Tzai, D.M.1    Yao, M.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.