-
1
-
-
38149134544
-
State-of-the-art in product-service systems
-
Baines, T. S., Lightfoot, H. W., Evans, S., Neely, A., Greenough, R., Peppard, J., Roy, R., Shehab, E., Braganza, A., Tiwari, A., Alcock, J. R., Angus, J. P., Bastl, M., Cousens, A., Irving, P., Johnson, M., Kingston, J., Lockett, H., Martinez, V., Michele, P., Tranfield, D., Walton, I. M., and Wilson, H., 2007, "State-of-the-Art in Product-Service Systems," Proc IMechE Part B J. Eng. Manuf., 221, pp. 1543-1552.
-
(2007)
Proc IMechE Part B J. Eng. Manuf.
, vol.221
, pp. 1543-1552
-
-
Baines, T.S.1
Lightfoot, H.W.2
Evans, S.3
Neely, A.4
Greenough, R.5
Peppard, J.6
Roy, R.7
Shehab, E.8
Braganza, A.9
Tiwari, A.10
Alcock, J.R.11
Angus, J.P.12
Bastl, M.13
Cousens, A.14
Irving, P.15
Johnson, M.16
Kingston, J.17
Lockett, H.18
Martinez, V.19
Michele, P.20
Tranfield, D.21
Walton, I.M.22
Wilson, H.23
more..
-
3
-
-
35648934882
-
Guide for the verification and validation of computational fluid dynamics simulations
-
AIAA. AIAA G- 077-1998
-
AIAA, "Guide for the Verification and Validation of Computational Fluid Dynamics Simulations," 1998, American Inst. of Aero. and Astro. AIAA G-077-1998.
-
(1998)
American Inst. of Aero. and Astro
-
-
-
5
-
-
39149123528
-
Verification and validation benchmarks
-
Oberkampf, W. L. and Trucano, T. G., 2008, "Verification and Validation Benchmarks," Nucl. Eng. & Des., 238(3), pp. 716-743.
-
(2008)
Nucl. Eng. & Des.
, vol.238
, Issue.3
, pp. 716-743
-
-
Oberkampf, W.L.1
Trucano, T.G.2
-
6
-
-
84961877601
-
Guide for verification and validation in computational solid mechanics
-
ASME
-
ASME, "Guide for Verification and Validation in Computational Solid Mechanics," 2006, American Soc. of Mech. Eng. ASME V&V 10-2006.
-
(2006)
American Soc. of Mech. Eng. ASME v& v 10-2006
-
-
-
7
-
-
40549099789
-
-
The RAND Corp. Santa Monica
-
Arena, M. V., Younossi, O., Galway, L. A., Fox, B., Graser, J. C., Sollinger, J. M., Wu, F. and Wong, C., "Impossible Certainty Cost Risk Analysis for Air Force Systems," 2006, The RAND Corp. Santa Monica.
-
(2006)
Impossible Certainty Cost Risk Analysis for Air Force Systems
-
-
Arena, M.V.1
Younossi, O.2
Galway, L.A.3
Fox, B.4
Graser, J.C.5
Sollinger, J.M.6
Wu, F.7
Wong, C.8
-
8
-
-
0034562014
-
Can target costing and whole life costing be applied in the construction industry?: Evidence from two case studies
-
Nicolini, D., Tomkins, C, Holti, R, Oldman, A, Smalley, M, 2000, "Can Target Costing and Whole Life Costing Be Applied in the Construction Industry?: Evidence from Two Case Studies," Brit J of Mgt, 11(4), pp. 303-324.
-
(2000)
Brit J of Mgt
, vol.11
, Issue.4
, pp. 303-324
-
-
Nicolini, D.1
Tomkins, C.2
Holti, R.3
Oldman, A.4
Smalley, M.5
-
9
-
-
77953740996
-
-
[cited 2008 May 8]
-
BBC. MPs Criticise Rising 2012 Costs 2008 [cited 2008 May 8]; Available from: http://news.bbc.co.uk/1/hi/uk-politics/7373962.stm.
-
(2008)
MPs Criticise Rising 2012 Costs
-
-
-
10
-
-
77953742688
-
-
[cited 2008 May 8]
-
BBC. Airbus Hikes A380 Break-Even Mark. 2006 [cited 2008 May 8]; Available from: http://news.bbc.co.uk/1/hi/business/6067540.stm.
-
(2006)
Airbus Hikes A380 Break-Even Mark
-
-
-
12
-
-
82155169346
-
Cost assessment guide best practices for estimating and managing program costs
-
GAO, US Gov Accountability Office. GAO-07-1134SP. Washington DC
-
GAO, "Cost Assessment Guide Best Practices for Estimating and Managing Program Costs," Exposure Draft, 2007, US Gov Accountability Office. GAO-07-1134SP. Washington DC.
-
(2007)
Exposure Draft
-
-
-
14
-
-
77953735983
-
-
NAO, National Audit Office (NAO). Report by the Comptroller and Auditor General. London
-
NAO, "Through Life Management," 2003, National Audit Office (NAO). Report by the Comptroller and Auditor General. London.
-
(2003)
Through Life Management
-
-
-
16
-
-
33748074466
-
Datum project: Cost estimating environment for support of aerospace design decision making
-
Scanlan, J., Rao, A., Bru, C., Hale, P. and Marsh, R., 2006, "Datum Project: Cost Estimating Environment for Support of Aerospace Design Decision Making," J. Aircraft, 43(4), pp. 1022-1028.
-
(2006)
J. Aircraft
, vol.43
, Issue.4
, pp. 1022-1028
-
-
Scanlan, J.1
Rao, A.2
Bru, C.3
Hale, P.4
Marsh, R.5
-
17
-
-
77953776809
-
Cost estimating for low volume long life products in electronic defence systems
-
University of Bath. Bath
-
Cheung, W. M. and Marsh, R., "Cost Estimating for Low Volume Long Life Products in Electronic Defence Systems," Industrial Survey, Current Cost Estimation Systems and Evaluation, 2007, University of Bath. Bath.
-
(2007)
Industrial Survey, Current Cost Estimation Systems and Evaluation
-
-
Cheung, W.M.1
Marsh, R.2
-
18
-
-
0033874545
-
An application-oriented view of modeling uncertainty
-
Zimmermann, H.-J., 2000, "An Application-Oriented View of Modeling Uncertainty," Eur. J. Op. Res., 122, pp. 190-198.
-
(2000)
Eur. J. Op. Res.
, vol.122
, pp. 190-198
-
-
Zimmermann, H.-J.1
-
19
-
-
2642526953
-
From dissecting ignorance to solving algebraic problems
-
Ayyub, B. M., 2004, "From Dissecting Ignorance to Solving Algebraic Problems," Rel. Eng. & Sys. Safety, 85(1-3), pp. 223-238.
-
(2004)
Rel. Eng. & Sys. Safety
, vol.85
, Issue.1-3
, pp. 223-238
-
-
Ayyub, B.M.1
-
20
-
-
0030287619
-
Two methods for the structured assessment of model uncertainty by experts in performance assessments of radioactive waste repositories
-
Zio, E., 1996, "Two Methods for the Structured Assessment of Model Uncertainty by Experts in Performance Assessments of Radioactive Waste Repositories," Rel. Eng. & Sys. Safety, 54(2), pp. 225.
-
(1996)
Rel. Eng. & Sys. Safety
, vol.54
, Issue.2
, pp. 225
-
-
Zio, E.1
-
23
-
-
0030151608
-
Model uncertainty: Theory and practical implications
-
Laskey, K. B., 1996, "Model Uncertainty: Theory and Practical Implications," IEEE Trans. on Sys., Man, & Cybernetics - Part A: Sys. & Humans, 26(3), pp. 340-348.
-
(1996)
IEEE Trans. on Sys., Man, & Cybernetics - Part A: Sys. & Humans
, vol.26
, Issue.3
, pp. 340-348
-
-
Laskey, K.B.1
-
24
-
-
33244478026
-
-
Springer
-
Earl, C., Johnson, J. and Eckert, C., Complexity, in Design Process Improvement - a Review of Current Practice. 2005, Springer.
-
(2005)
Complexity, in Design Process Improvement - A Review of Current Practice
-
-
Earl, C.1
Johnson, J.2
Eckert, C.3
-
25
-
-
84862630175
-
A classification of uncertainty for early product and system design
-
Paris, France. Paper 480
-
de Weck, O., Eckert, C. and Clarkson, J., "A Classification of Uncertainty for Early Product and System Design," ICED'07, 2007. Paris, France. pp. Paper 480.
-
(2007)
ICED'07
-
-
De Weck, O.1
Eckert, C.2
Clarkson, J.3
-
26
-
-
0032277971
-
Verification and validation of simulation models
-
Washington, US
-
Sargent, R. G., 1998, "Verification and Validation of Simulation Models," Proc. 30th Winter Sim. Conf, Washington, US, 121-130.
-
(1998)
Proc. 30th Winter Sim. Conf
, pp. 121-130
-
-
Sargent, R.G.1
-
27
-
-
0036544606
-
Verification and validation in computational fluid dynamics
-
Oberkampf, W. L. and Trucano, T. G., 2002, "Verification and Validation in Computational Fluid Dynamics," Prog. in Aero. Sc., 38, pp. 209-272.
-
(2002)
Prog. in Aero. Sc.
, vol.38
, pp. 209-272
-
-
Oberkampf, W.L.1
Trucano, T.G.2
-
28
-
-
0037364907
-
Models and model uncertainty in the context of risk analysis
-
Nilsen, T., and Aven, T., 2003, "Models and Model Uncertainty in the Context of Risk Analysis," Rel. Eng. & Sys. Safety, 79, pp. 309-317.
-
(2003)
Rel. Eng. & Sys. Safety
, vol.79
, pp. 309-317
-
-
Nilsen, T.1
Aven, T.2
-
30
-
-
34548697562
-
Development and characterisation of error functions in design
-
Goh, Y., McMahon, C. and Booker, J., 2007, "Development and Characterisation of Error Functions in Design," Res. in Eng. Des., 18(3), pp. 129-148.
-
(2007)
Res. in Eng. Des.
, vol.18
, Issue.3
, pp. 129-148
-
-
Goh, Y.1
McMahon, C.2
Booker, J.3
-
31
-
-
84929025832
-
Cost model for assessing the transition to lead-free electronics
-
California, USA
-
Sandborn, P. and Jafreen, R., "Cost Model for Assessing the Transition to Lead-Free Electronics," Proc. 2007 Aging Aircraft Conference, 2007. California, USA.
-
(2007)
Proc. 2007 Aging Aircraft Conference
-
-
Sandborn, P.1
Jafreen, R.2
-
32
-
-
77953794631
-
Developing a risk- assessment methodology in the U.K. defence industry
-
Groom, H. and Gray, K. R., 1995, "Developing a Risk- Assessment Methodology in the U.K. Defence Industry," IMA J.of Maths App. in Bus. & Ind., 6, pp. 301-314.
-
(1995)
IMA J.Of Maths App. in Bus. & Ind.
, vol.6
, pp. 301-314
-
-
Groom, H.1
Gray, K.R.2
-
33
-
-
84879397169
-
Why correlation matters in cost estimating
-
Williamsburg, VA
-
Book, S. A., 1999, "Why Correlation Matters in Cost Estimating," 32nd Annual DOD Cost Analysis Symp., Williamsburg, VA.
-
(1999)
32nd Annual DOD Cost Analysis Symp.
-
-
Book, S.A.1
-
34
-
-
33745466672
-
Product cost estimation: Technique classification and methodology review
-
Niazi, A., Dai, J. S., Balabani, S. and Seneviratne, L., 2006, "Product Cost Estimation: Technique Classification and Methodology Review," J. of Manuf. Sc. & Eng., 128(2), pp. 563-575.
-
(2006)
J. of Manuf. Sc. & Eng.
, vol.128
, Issue.2
, pp. 563-575
-
-
Niazi, A.1
Dai, J.S.2
Balabani, S.3
Seneviratne, L.4
-
36
-
-
33847235384
-
On-screen real-time cost estimating
-
Newnes, L. B., Mileham, A. R. and Hosseini-Nasab, H., 2007, "On-Screen Real-Time Cost Estimating," Int. J. Prod. Res., 45, pp. 1577-1594.
-
(2007)
Int. J. Prod. Res.
, vol.45
, pp. 1577-1594
-
-
Newnes, L.B.1
Mileham, A.R.2
Hosseini-Nasab, H.3
-
37
-
-
0009009816
-
-
NASA, Nat. Aero. & Space Admin. (NASA)
-
NASA, "Parametric Cost Estimating Handbook," 1995, Nat. Aero. & Space Admin. (NASA).
-
(1995)
Parametric Cost Estimating Handbook
-
-
-
39
-
-
0030571406
-
Feature-based cost estimation for packaging products using neural networks
-
Zhang, Y. F., Fuh, J. Y. H. and Chan, W. T., 1996, "Feature-Based Cost Estimation for Packaging Products Using Neural Networks," Comp. in Ind., 32, pp. 95-113.
-
(1996)
Comp. in Ind.
, vol.32
, pp. 95-113
-
-
Zhang, Y.F.1
Fuh, J.Y.H.2
Chan, W.T.3
-
40
-
-
0037431955
-
Activity-based cost management for design and development stage
-
Ben-Arieh, D. and Qian, L., 2003, "Activity-Based Cost Management for Design and Development Stage," Int. J. Prod. Eco., 83(2), pp. 169-183.
-
(2003)
Int. J. Prod. Eco.
, vol.83
, Issue.2
, pp. 169-183
-
-
Ben-Arieh, D.1
Qian, L.2
-
41
-
-
0034808359
-
Use of parametric models in an economic evaluation step during the design phase
-
Farineau, T., Rabenasolo, B., Castelain, J. M., Meyer, Y. and Duverlie, P., 2001, "Use of Parametric Models in an Economic Evaluation Step During the Design Phase," Int. J. Adv. Manuf. Tech., 17(2), pp. 79-86.
-
(2001)
Int. J. Adv. Manuf. Tech.
, vol.17
, Issue.2
, pp. 79-86
-
-
Farineau, T.1
Rabenasolo, B.2
Castelain, J.M.3
Meyer, Y.4
Duverlie, P.5
-
42
-
-
77953796201
-
Methods and models for life cycle costing
-
NATO, NATO Res. & Tech. Org. RTO-TR-SAS-054. 5.1-5.10
-
NATO, "Methods and Models for Life Cycle Costing," Final Report of Task Group SAS-054, 2007, NATO Res. & Tech. Org. RTO-TR-SAS-054. pp. 5.1-5.10.
-
(2007)
Final Report of Task Group SAS-054
-
-
-
43
-
-
0036505614
-
Why nasa's management doesn't believe the cost estimate
-
Prince, F. A., 2002, "Why NASA's Management Doesn't Believe the Cost Estimate," Eng. Mgt. J.
-
(2002)
Eng. Mgt. J
-
-
Prince, F.A.1
-
45
-
-
77953766071
-
A product lifecycle costing system with imprecise end-of-life data
-
Kang, J.-G. and Brissaud, D., 2007, "A Product Lifecycle Costing System with Imprecise End-of-Life Data," Proc. 14th CIRP Conf. on LCE, Part 4, pp. 467-472.
-
(2007)
Proc. 14th CIRP Conf. on LCE
, Issue.PART 4
, pp. 467-472
-
-
Kang, J.-G.1
Brissaud, D.2
-
46
-
-
49349133217
-
Fuzzy sets as a basis for a theory of possibility
-
Zadeh, L. A., 1978, "Fuzzy Sets as a Basis for a Theory of Possibility," Fuzzy Sets & Sys., 1(3-28).
-
(1978)
Fuzzy Sets & Sys.
, vol.1
, Issue.3-28
-
-
Zadeh, L.A.1
-
47
-
-
0016458950
-
The concept of a linguistic variable and its application to approximate reasoning
-
Zadeh, L. A., 1975, "The Concept of a Linguistic Variable and Its Application to Approximate Reasoning " Info. Sc., 8, pp. 199-249.
-
(1975)
Info. Sc.
, vol.8
, pp. 199-249
-
-
Zadeh, L.A.1
-
48
-
-
0042129889
-
Testing the descriptive validity of possibility theory in human judgments of uncertainty
-
Raufaste, E., da Silva Neves, R. and Mariné, C., 2003, "Testing the Descriptive Validity of Possibility Theory in Human Judgments of Uncertainty," Artificial Intel., 148(1-2), pp. 197-218.
-
(2003)
Artificial Intel
, vol.148
, Issue.1-2
, pp. 197-218
-
-
Raufaste, E.1
Da Silva Neves, R.2
Mariné, C.3
-
49
-
-
2942635403
-
Combining various facets of uncertainty in whole-life cost modelling
-
Kishk, M., 2004, "Combining Various Facets of Uncertainty in Whole-Life Cost Modelling," Const. Mgt. & Eco., 22(4), pp. 429 - 435.
-
(2004)
Const. Mgt. & Eco.
, vol.22
, Issue.4
, pp. 429-435
-
-
Kishk, M.1
-
50
-
-
3042796443
-
Probability-possibility transformations, triangular fuzzy sets, and probabilistic inequalities
-
Dubois, D., Foulloy, L, Mauris, G, Prade, H, 2004, "Probability- Possibility Transformations, Triangular Fuzzy Sets, and Probabilistic Inequalities," Rel. Comp., 10, pp. 273-297.
-
(2004)
Rel. Comp.
, vol.10
, pp. 273-297
-
-
Dubois, D.1
Foulloy, L.2
Mauris, G.3
Prade, H.4
-
51
-
-
0035640594
-
On measuring uncertainty and uncertainty-based information: Recent developments
-
Klir, G. J. and Smith, R. M., 2001, "On Measuring Uncertainty and Uncertainty-Based Information: Recent Developments," Annals of Maths & Artificial Intel., 32, pp. 5-33.
-
(2001)
Annals of Maths & Artificial Intel.
, vol.32
, pp. 5-33
-
-
Klir, G.J.1
Smith, R.M.2
-
53
-
-
0346856880
-
Eliciting expert beliefs in substantial practical applications
-
O'Hagan, A., 1998, "Eliciting Expert Beliefs in Substantial Practical Applications," The Statistician, 47(1), pp. 21-35.
-
(1998)
The Statistician
, vol.47
, Issue.1
, pp. 21-35
-
-
O'Hagan, A.1
-
55
-
-
0000448462
-
Analysis of uncertain structural systems using interval analysis
-
Rao, S. S., and Berke, L., 1997, "Analysis of Uncertain Structural Systems Using Interval Analysis," AIAA J., 35(4), pp. 727-735.
-
(1997)
AIAA J.
, vol.35
, Issue.4
, pp. 727-735
-
-
Rao, S.S.1
Berke, L.2
-
57
-
-
2642523660
-
Probability is perfect, but we can't elicit it perfectly
-
O'Hagan, A. and Oakley, J. E., 2004, "Probability Is Perfect, but We Can't Elicit It Perfectly," Rel. Eng. & Sys. Safety, 85(1-3), pp. 239-248.
-
(2004)
Rel. Eng. & Sys. Safety
, vol.85
, Issue.1-3
, pp. 239-248
-
-
O'Hagan, A.1
Oakley, J.E.2
-
58
-
-
0030289763
-
Different methods are needed to propagate ignorance and variability
-
Ferson, S., Ginzburg, LR, 1996, "Different Methods Are Needed to Propagate Ignorance and Variability," Rel. Eng. & Sys. Safety, 54(2-3), pp. 133-144.
-
(1996)
Rel. Eng. & Sys. Safety
, vol.54
, Issue.2-3
, pp. 133-144
-
-
Ferson, S.1
Ginzburg, L.R.2
-
59
-
-
33746436657
-
The value of using imprecise probabilities in engineering design
-
Aughenbaugh, J. M. and Paredis, C. J. J., 2006, "The Value of Using Imprecise Probabilities in Engineering Design," J. Mech. Des., 128(4), pp. 969-979.
-
(2006)
J. Mech. Des.
, vol.128
, Issue.4
, pp. 969-979
-
-
Aughenbaugh, J.M.1
Paredis, C.J.J.2
-
62
-
-
34547113258
-
Life- cycle cost in a highly uncertain economic environment: The case of managing the U.S. Department of energy's nuclear waste legacy
-
Spring 2004
-
Greenberg, M., Mayer, H. and Lewis, D., 2004, "Life- Cycle Cost in a Highly Uncertain Economic Environment: The Case of Managing the U.S. Department of Energy's Nuclear Waste Legacy," Fed. Facilities Env. J., Spring 2004, pp. 67-82.
-
(2004)
Fed. Facilities Env. J.
, pp. 67-82
-
-
Greenberg, M.1
Mayer, H.2
Lewis, D.3
|