-
2
-
-
33646581663
-
System model for analyzing design productivity
-
0742-597X 10.1061/(ASCE)0742-597X(2006)22:1(27)
-
Chang, A. S., and Ibbs, W. (2006). System model for analyzing design productivity. J. Manage. Eng., 22 (1), 27-34. 0742-597X 10.1061/(ASCE)0742- 597X(2006)22:1(27)
-
(2006)
J. Manage. Eng.
, vol.22
, Issue.1
, pp. 27-34
-
-
Chang, A.S.1
Ibbs, W.2
-
3
-
-
63049092049
-
-
Construction Industry Institute (CII). RR113-11, Construction Industry Institute, Univ. of Texas at Austin, Austin, TX
-
Construction Industry Institute (CII). (1995). Project definition rating index (PDRI) for industrial projects. RR113-11, Construction Industry Institute, Univ. of Texas at Austin, Austin, TX
-
(1995)
Project Definition Rating Index (PDRI) for Industrial Projects
-
-
-
4
-
-
15844399634
-
-
Construction Industry Institute (CII). RR156-11, Construction Industry Institute, Univ. of Texas at Austin, Austin, TX
-
Construction Industry Institute (CII). (2001). Engineering productivity measurement. RR156-11, Construction Industry Institute, Univ. of Texas at Austin, Austin, TX
-
(2001)
Engineering Productivity Measurement
-
-
-
5
-
-
23044492493
-
-
Construction Industry Institute (CII). BMM2002-3, Univ. of Texas at Austin, Austin, TX
-
Construction Industry Institute (CII). (2002). Benchmarking and metrics-Summary rep. BMM2002-3, Univ. of Texas at Austin, Austin, TX
-
(2002)
Benchmarking and Metrics-Summary Rep
-
-
-
6
-
-
15844399634
-
-
Construction Industry Institute (CII). RR192-11, Construction Industry Institute, Univ. of Texas at Austin, Austin, TX
-
Construction Industry Institute (CII). (2004). Engineering productivity measurements II. RR192-11, Construction Industry Institute, Univ. of Texas at Austin, Austin, TX
-
(2004)
Engineering Productivity Measurements II
-
-
-
7
-
-
84954550551
-
-
Construction Industry Institute (CII). RS222-11, Construction Industry Institute, Univ. of Texas at Austin, Austin, TX
-
Construction Industry Institute (CII). (2007). Best modern practices for design in fast track projects. RS222-11, Construction Industry Institute, Univ. of Texas at Austin, Austin, TX
-
(2007)
Best Modern Practices for Design in Fast Track Projects
-
-
-
8
-
-
65249125244
-
Modular assembly with postponement to improve health, safety, and productivity in construction
-
1084-0680 10.1061/(ASCE)1084-0680(2009)14:2(81)
-
Court, P. F., Pasquire, C. L., Gibb, G. F., and Bower, D. (2009). Modular assembly with postponement to improve health, safety, and productivity in construction. Pract. Period. Struct. Des. Constr., 14 (2), 81-89. 1084-0680 10.1061/(ASCE)1084-0680(2009)14:2(81)
-
(2009)
Pract. Period. Struct. Des. Constr.
, vol.14
, Issue.2
, pp. 81-89
-
-
Court, P.F.1
Pasquire, C.L.2
Gibb, G.F.3
Bower, D.4
-
9
-
-
18744415235
-
Engineering performance in industrial construction
-
, ASCE, Orlando, FL
-
Georgy, M. E., Chang, L. M., and Walsh, K. D. (2000). Engineering performance in industrial construction. Construction Congress VI: Building Together for a Better Tomorrow in an Increasingly Complex World, ASCE, Orlando, FL, 917-927.
-
(2000)
Construction Congress VI: Building Together for A Better Tomorrow in An Increasingly Complex World
, pp. 917-927
-
-
Georgy, M.E.1
Chang, L.M.2
Walsh, K.D.3
-
10
-
-
0004652780
-
Quantitative impacts of project change: Size issues
-
0733-9364 10.1061/(ASCE)0733-9364(1997)123:3(308)
-
Ibbs, W. C. (1997). Quantitative impacts of project change: Size issues. J. Constr. Eng. Manage., 123 (3), 308-311. 0733-9364 10.1061/(ASCE)0733- 9364(1997)123:3(308)
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.3
, pp. 308-311
-
-
Ibbs, W.C.1
-
11
-
-
0004706464
-
Fast-tracking's impact on project change
-
1052-3928 10.1061/(ASCE)1052-3928(2007)133:1(45)
-
Ibbs, C. W., Lee, S. A., and Li, M. I. (1998). Fast-tracking's impact on project change. Proj. Manage. J., 29 (4), 35-42. 1052-3928 10.1061/(ASCE)1052- 3928(2007)133:1(45)
-
(1998)
Proj. Manage. J.
, vol.29
, Issue.4
, pp. 35-42
-
-
Ibbs, C.W.1
Lee, S.A.2
Li, M.I.3
-
13
-
-
0033358240
-
Simulating project work processes and organizations: Toward a micro-contingency theory of organizational design
-
Levitt, R. E., Thomsen, J., Christiansen, T. R., Kunz, J. C., Jin, Y., and Nass, C. (1999). Simulating project work processes and organizations: Toward a micro-contingency theory of organizational design. Manage. Sci., 45 (11), 1479-1495. 0025-1909 10.1287/mnsc.45.11.1479 (Pubitemid 30523641)
-
(1999)
Management Science
, vol.45
, Issue.11
, pp. 1479-1495
-
-
Levitt, R.E.1
Thomsen, J.2
Christiansen, T.R.3
Kunz, J.C.4
Jin, Y.5
Nass, C.6
-
15
-
-
2542461920
-
Learning to Reduce Rework in Projects: Analysis of Firm's Organizational Learning and Quality Practices
-
Love, P. E. D., Irani, Z., and Edwards, D. J. (2003). Learning to reduce rework in projects: Analysis of firm's organizational learning and quality practices. Proj. Manage. J., 34 (3), 13-25. 0926-5805 10.1016/j.autcon.2007.08. 003 (Pubitemid 37053455)
-
(2003)
Proj. Manage. J.
, vol.34
, Issue.3
, pp. 13-25
-
-
Love, P.E.D.1
Irani, Z.2
Edwards, D.J.3
-
17
-
-
14544298864
-
Quantifying engineering project scope for productivity modeling
-
DOI 10.1061/(ASCE)0733-9364(2005)131:3(360)
-
Song, L., and AbouRizk, S. (2005). Quantifying engineering project scope for productivity modeling. J. Constr. Eng. Manage., 131 (3), 360-367. 0733-9364 10.1061/(ASCE)0733-9364(2005)131:3(360) (Pubitemid 40303944)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.3
, pp. 360-367
-
-
Song, L.1
AbouRizk, S.M.2
-
18
-
-
2342441594
-
-
ASCE, Honolulu
-
Song, L., Allouche, M., and Abourizk, S. (2003). Measuring and estimating steel drafting productivity. ASCE, Honolulu, 67-75.
-
(2003)
Measuring and Estimating Steel Drafting Productivity
, pp. 67-75
-
-
Song, L.1
Allouche, M.2
Abourizk, S.3
|