메뉴 건너뛰기




Volumn 27, Issue 4, 2011, Pages 229-235

Factors affecting engineering productivity

Author keywords

Bench marks; Engineering; Productivity; Project management; System analysis

Indexed keywords

BENCH MARKS; CONSTRUCTION INDUSTRY INSTITUTES; ENGINEERING PERFORMANCE; ENGINEERING PRODUCTIVITY; LABOR PRODUCTIVITY; MODULARIZATIONS; PROJECT OUTCOMES; PROJECT PHASIS; PROJECT SIZE; QUANTITATIVE ASSESSMENTS;

EID: 81855196019     PISSN: 0742597X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)ME.1943-5479.0000059     Document Type: Article
Times cited : (26)

References (18)
  • 2
    • 33646581663 scopus 로고    scopus 로고
    • System model for analyzing design productivity
    • 0742-597X 10.1061/(ASCE)0742-597X(2006)22:1(27)
    • Chang, A. S., and Ibbs, W. (2006). System model for analyzing design productivity. J. Manage. Eng., 22 (1), 27-34. 0742-597X 10.1061/(ASCE)0742- 597X(2006)22:1(27)
    • (2006) J. Manage. Eng. , vol.22 , Issue.1 , pp. 27-34
    • Chang, A.S.1    Ibbs, W.2
  • 3
    • 63049092049 scopus 로고
    • Construction Industry Institute (CII). RR113-11, Construction Industry Institute, Univ. of Texas at Austin, Austin, TX
    • Construction Industry Institute (CII). (1995). Project definition rating index (PDRI) for industrial projects. RR113-11, Construction Industry Institute, Univ. of Texas at Austin, Austin, TX
    • (1995) Project Definition Rating Index (PDRI) for Industrial Projects
  • 4
    • 15844399634 scopus 로고    scopus 로고
    • Construction Industry Institute (CII). RR156-11, Construction Industry Institute, Univ. of Texas at Austin, Austin, TX
    • Construction Industry Institute (CII). (2001). Engineering productivity measurement. RR156-11, Construction Industry Institute, Univ. of Texas at Austin, Austin, TX
    • (2001) Engineering Productivity Measurement
  • 5
    • 23044492493 scopus 로고    scopus 로고
    • Construction Industry Institute (CII). BMM2002-3, Univ. of Texas at Austin, Austin, TX
    • Construction Industry Institute (CII). (2002). Benchmarking and metrics-Summary rep. BMM2002-3, Univ. of Texas at Austin, Austin, TX
    • (2002) Benchmarking and Metrics-Summary Rep
  • 6
    • 15844399634 scopus 로고    scopus 로고
    • Construction Industry Institute (CII). RR192-11, Construction Industry Institute, Univ. of Texas at Austin, Austin, TX
    • Construction Industry Institute (CII). (2004). Engineering productivity measurements II. RR192-11, Construction Industry Institute, Univ. of Texas at Austin, Austin, TX
    • (2004) Engineering Productivity Measurements II
  • 7
    • 84954550551 scopus 로고    scopus 로고
    • Construction Industry Institute (CII). RS222-11, Construction Industry Institute, Univ. of Texas at Austin, Austin, TX
    • Construction Industry Institute (CII). (2007). Best modern practices for design in fast track projects. RS222-11, Construction Industry Institute, Univ. of Texas at Austin, Austin, TX
    • (2007) Best Modern Practices for Design in Fast Track Projects
  • 8
    • 65249125244 scopus 로고    scopus 로고
    • Modular assembly with postponement to improve health, safety, and productivity in construction
    • 1084-0680 10.1061/(ASCE)1084-0680(2009)14:2(81)
    • Court, P. F., Pasquire, C. L., Gibb, G. F., and Bower, D. (2009). Modular assembly with postponement to improve health, safety, and productivity in construction. Pract. Period. Struct. Des. Constr., 14 (2), 81-89. 1084-0680 10.1061/(ASCE)1084-0680(2009)14:2(81)
    • (2009) Pract. Period. Struct. Des. Constr. , vol.14 , Issue.2 , pp. 81-89
    • Court, P.F.1    Pasquire, C.L.2    Gibb, G.F.3    Bower, D.4
  • 10
    • 0004652780 scopus 로고    scopus 로고
    • Quantitative impacts of project change: Size issues
    • 0733-9364 10.1061/(ASCE)0733-9364(1997)123:3(308)
    • Ibbs, W. C. (1997). Quantitative impacts of project change: Size issues. J. Constr. Eng. Manage., 123 (3), 308-311. 0733-9364 10.1061/(ASCE)0733- 9364(1997)123:3(308)
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.3 , pp. 308-311
    • Ibbs, W.C.1
  • 11
    • 0004706464 scopus 로고    scopus 로고
    • Fast-tracking's impact on project change
    • 1052-3928 10.1061/(ASCE)1052-3928(2007)133:1(45)
    • Ibbs, C. W., Lee, S. A., and Li, M. I. (1998). Fast-tracking's impact on project change. Proj. Manage. J., 29 (4), 35-42. 1052-3928 10.1061/(ASCE)1052- 3928(2007)133:1(45)
    • (1998) Proj. Manage. J. , vol.29 , Issue.4 , pp. 35-42
    • Ibbs, C.W.1    Lee, S.A.2    Li, M.I.3
  • 13
    • 0033358240 scopus 로고    scopus 로고
    • Simulating project work processes and organizations: Toward a micro-contingency theory of organizational design
    • Levitt, R. E., Thomsen, J., Christiansen, T. R., Kunz, J. C., Jin, Y., and Nass, C. (1999). Simulating project work processes and organizations: Toward a micro-contingency theory of organizational design. Manage. Sci., 45 (11), 1479-1495. 0025-1909 10.1287/mnsc.45.11.1479 (Pubitemid 30523641)
    • (1999) Management Science , vol.45 , Issue.11 , pp. 1479-1495
    • Levitt, R.E.1    Thomsen, J.2    Christiansen, T.R.3    Kunz, J.C.4    Jin, Y.5    Nass, C.6
  • 15
    • 2542461920 scopus 로고    scopus 로고
    • Learning to Reduce Rework in Projects: Analysis of Firm's Organizational Learning and Quality Practices
    • Love, P. E. D., Irani, Z., and Edwards, D. J. (2003). Learning to reduce rework in projects: Analysis of firm's organizational learning and quality practices. Proj. Manage. J., 34 (3), 13-25. 0926-5805 10.1016/j.autcon.2007.08. 003 (Pubitemid 37053455)
    • (2003) Proj. Manage. J. , vol.34 , Issue.3 , pp. 13-25
    • Love, P.E.D.1    Irani, Z.2    Edwards, D.J.3
  • 17
    • 14544298864 scopus 로고    scopus 로고
    • Quantifying engineering project scope for productivity modeling
    • DOI 10.1061/(ASCE)0733-9364(2005)131:3(360)
    • Song, L., and AbouRizk, S. (2005). Quantifying engineering project scope for productivity modeling. J. Constr. Eng. Manage., 131 (3), 360-367. 0733-9364 10.1061/(ASCE)0733-9364(2005)131:3(360) (Pubitemid 40303944)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.3 , pp. 360-367
    • Song, L.1    AbouRizk, S.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.