Volumn 17, Issue 3, 2011, Pages 357-370

Construction material supply chain process analysis and optimization

Author keywords

Construction project; Simulation; Supply Chain Operations Reference Model

Indexed keywords

ANALYSIS AND DESIGN; BRIDGE SUPERSTRUCTURE; CONSTRUCTION PROCESS; CONSTRUCTION PROJECTS; CONSTRUCTION SUPPLY CHAIN; HIERARCHICAL MODEL; PERFORMANCE EVALUATION; RESEARCH STUDIES; SCOR MODELS; SIMULATION; SUPPLY AND DEMAND; SUPPLY CHAIN OPERATION; SUPPLY CHAIN OPERATIONS REFERENCE MODEL; SUPPLY CHAIN OPERATIONS REFERENCE MODELS;

EID: 81255142713     PISSN: 13923730     EISSN: 18223605     Source Type: Journal    
DOI: 10.3846/13923730.2011.594221     Document Type: Article
Times cited : (25)

References (18)
  • 1
    • 40649099182 scopus 로고    scopus 로고
    • CACI Products Company
    • CACI Products Company. 2004. SIMPROCESS Getting Started, 16-19.
    • (2004) SIMPROCESS Getting Started , pp. 16-19
  • 2
    • 81255207453 scopus 로고    scopus 로고
    • Insights of FPLM for long-viaduct construction in Taiwan High- Speed Railway Project: Overcoming the interfaces
    • Taipei, Taiwan
    • Chiu, S.-L.; Kang, W.-B.; Chiu, P.-C.; Chou, J. 2000. Insights of FPLM for long-viaduct construction in Taiwan High- Speed Railway Project: overcoming the interfaces, in Proc. of the 17th ISARC Symposium, Taipei, Taiwan, 323-328.
    • (2000) Proc. of the 17th ISARC Symposium , pp. 323-328
    • Chiu, S.-L.1    Kang, W.-B.2    Chiu, P.-C.3    Chou, J.4
  • 3
    • 0000545232 scopus 로고    scopus 로고
    • Tests for building confidence in system dynamics models
    • North-Holland Publishing company New York, USA
    • Forrester, J. W.; Senge, P. M. 2001. Tests for Building Confidence in System Dynamics Models, in TIMS Studies in the Management Sciences 14. North-Holland Publishing company. New York, USA, 155-164.
    • (2001) TIMS Studies in the Management Sciences , vol.14 , pp. 155-164
    • Forrester, J.W.1    Senge, P.M.2
  • 5
    • 2342594456 scopus 로고    scopus 로고
    • A review and analysis of supply chain operation reference (SCOR) model, supply chain management
    • Huan, S. H.; Sheoran, S. K.; Wang, G. 2004. A Review and Analysis of Supply Chain Operation Reference (SCOR) Model, Supply Chain Management: An International Journal 9(1): 23-29.
    • (2004) An International Journal , vol.9 , Issue.1 , pp. 23-29
    • Huan, S.H.1    Sheoran, S.K.2    Wang, G.3
  • 6
    • 73949153020 scopus 로고    scopus 로고
    • A two-phase method for the capacitated facility problem of compact customer subsets
    • doi:10.3846/1648-4142.2009.24.274-282
    • Janácek, J.; Gábrišová, L. 2009. A Two-phase Method for the Capacitated Facility Problem of Compact Customer Subsets, Transport 24(4): 274-282. doi:10.3846/1648-4142.2009.24.274-282
    • (2009) Transport , vol.24 , Issue.4 , pp. 274-282
    • Janácek, J.1    Gábrišová, L.2
  • 7
    • 33751096716 scopus 로고    scopus 로고
    • Supply chain simulation modeling for the manufactured housing industry
    • doi:10.1061/(ASCE)0733-9488(2006)132:4(217
    • Jeong, J. G.; Hastak, M.; Syal, M. 2006. Supply Chain Simulation Modeling for the Manufactured Housing Industry, Journal of Urban Planning and Development ASCE 132(4): 217-225. doi:10.1061/(ASCE)0733-9488(2006)132:4(217)
    • (2006) Journal of Urban Planning and Development ASCE , vol.132 , Issue.4 , pp. 217-225
    • Jeong, J.G.1    Hastak, M.2    Syal, M.3
  • 8
    • 53349176790 scopus 로고    scopus 로고
    • Simulation model for supply chain reliability evaluation
    • doi:10.3846/1392-8619.2008.14.300-311
    • Klimov, R.; Merkuryev, Y. 2008. Simulation model for supply chain reliability evaluation, Technological and Economic Development of Economy 14(3): 300-311. doi:10.3846/1392-8619.2008.14.300-311
    • (2008) Technological and Economic Development of Economy , vol.14 , Issue.3 , pp. 300-311
    • Klimov, R.1    Merkuryev, Y.2
  • 9
    • 12444305434 scopus 로고    scopus 로고
    • Linking SCOR planning practices to supply chain performance: An exploratory study
    • doi:10.1108/01443570410569010
    • Lockamy III, A.; McCormack, K. 2004. Linking SCOR planning practices to supply chain performance: An exploratory study, International Journal of Operations & Production Management 24(12): 1192-1218. doi:10.1108/ 01443570410569010
    • (2004) International Journal of Operations & Production Management , vol.24 , Issue.12 , pp. 1192-1218
    • Lockamy Iii, A.1    McCormack, K.2
  • 10
    • 41549130358 scopus 로고    scopus 로고
    • Agile forecasting of dynamic logistics demand
    • doi:10.3846/1648-4142.2008.23.26-30
    • Miao, X.; Xi, B. 2008. Agile forecasting of dynamic logistics demand, Transport 23(1): 26-30. doi:10.3846/1648-4142.2008.23.26-30
    • (2008) Transport , vol.23 , Issue.1 , pp. 26-30
    • Miao, X.1    Xi, B.2
  • 11
    • 73949125297 scopus 로고    scopus 로고
    • The uncertainty evaluation method of supply chain reliability
    • doi:10.3846/1648-4142.2009.24.296-300
    • Miao, X.; Yu, B.; Xi, B. 2009. The uncertainty evaluation method of supply chain reliability, Transport 24(4): 296-300. doi:10.3846/1648-4142.2009. 24.296-300
    • (2009) Transport , vol.24 , Issue.4 , pp. 296-300
    • Miao, X.1    Yu, B.2    Xi, B.3
  • 12
    • 33645150497 scopus 로고    scopus 로고
    • Developing a resource supply chain planning system for construction projects
    • doi:10.1061/(ASCE)0733-9364(2006)132:4(393
    • Pserng, H. P.; Yin, S. Y. L.; Li, S. 2006. Developing a Resource Supply Chain Planning System for Construction Projects, Journal of Construction Engineering & Management ASCE 132(4): 393-407. doi:10.1061/(ASCE)0733- 9364(2006)132:4(393)
    • (2006) Journal of Construction Engineering & Management ASCE , vol.132 , Issue.4 , pp. 393-407
    • Pserng, H.P.1    Yin, S.Y.L.2    Li, S.3
  • 14
    • 55349135773 scopus 로고    scopus 로고
    • Keeping SCOR on your supply chain: Basic operations reference model updates with the times, information strategy
    • Schultz, G. J. 2003. Keeping SCOR on your supply chain: Basic Operations Reference Model Updates with the Times, Information Strategy: The Executive's Journal 9(4): 12-20.
    • (2003) The Executive's Journal , vol.9 , Issue.4 , pp. 12-20
    • Schultz, G.J.1
  • 15
    • 16244380766 scopus 로고    scopus 로고
    • Analysis of supply system models for planning construction project logistics
    • Supply Chain Council 2009 [online], [cited 15 March 2009]
    • Sobotka, A.; Czarnigowska, A. 2005. Analysis of Supply System Models for Planning Construction Project Logistics, Journal of Civil Engineering and Management 11(1): 73-82. Supply Chain Council. 2009 [online], [cited 15 March 2009]. Available from Internet: .
    • (2005) Journal of Civil Engineering and Management , vol.11 , Issue.1 , pp. 73-82
    • Sobotka, A.1    Czarnigowska, A.2
  • 16
    • 13244251277 scopus 로고    scopus 로고
    • Towards an agent-based construction supply network modelling and simulation platform
    • doi:10.1016/j.autcon.2004.08.003
    • Tah, J. H. M. 2005. Towards an agent-based construction supply network modelling and simulation platform, Automation in Construction 14(3): 353-359. doi:10.1016/j.autcon.2004.08.003
    • (2005) Automation in Construction , vol.14 , Issue.3 , pp. 353-359
    • Tah, J.H.M.1
  • 17
    • 0012258582 scopus 로고    scopus 로고
    • Roles of supply chain management in construction
    • 26-28 July, 1999 University of California, Berkeley, CA, USA
    • Vrijhoef, R.; Koskela, L. 1999. Roles of supply chain management in construction, in Proc. of the Roles of Supply Chain Management in Construction, 26-28 July, 1999, University of California, Berkeley, CA, USA, 133-146.
    • (1999) Proc. of the Roles of Supply Chain Management in Construction , pp. 133-146
    • Vrijhoef, R.1    Koskela, L.2
  • 18
    • 13944254414 scopus 로고    scopus 로고
    • Strategic positioning of inventory to match demand in a capital projects supply chain
    • doi:10.1061/(ASCE)0733-9364(2004)130:6(818
    • Walsh, K. D.; Hershauer, J. C.; Tommelein, I. D.; Walsh, T. A. 2004. Strategic Positioning of Inventory to Match Demand in a Capital Projects Supply Chain, Journal of Construction Engineering & Management 130(6): 818-826. doi:10.1061/(ASCE)0733-9364(2004)130:6(818)
    • (2004) Journal of Construction Engineering & Management , vol.130 , Issue.6 , pp. 818-826
    • Walsh, K.D.1    Hershauer, J.C.2    Tommelein, I.D.3    Walsh, T.A.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.