-
1
-
-
80052237398
-
Evaluation of a mining project using discounted cash flow analysis, decision tree analysis, Monte Carlo simulation and real options using an example
-
E. Topal, "Evaluation of a mining project using discounted cash flow analysis, decision tree analysis, Monte Carlo simulation and real options using an example," International Journal of Mining and Mineral Engineering, 1, No. 1 (2008).
-
(2008)
International Journal of Mining and Mineral Engineering
, vol.1
, Issue.1
-
-
Topal, E.1
-
2
-
-
0002931897
-
Risk in minerals industry projects: Perception, analysis and management
-
P. A. Dowd, "Risk in minerals industry projects: perception, analysis and management," Transactions of the Institute of Mining and Metallurgy, 106, No. A (1997).
-
(1997)
Transactions of the Institute of Mining and Metallurgy
, vol.106
, Issue.A
-
-
Dowd, P.A.1
-
3
-
-
34250173438
-
A maximum upside/minimum downside approach to the traditional optimization of open pit mine design
-
R. Dimitrakopoulos, L. S. Martinez, and S. Ramazan, "A maximum upside/minimum downside approach to the traditional optimization of open pit mine design," Journal of Mining Science, 43 (2007).
-
(2007)
Journal of Mining Science
, vol.43
-
-
Dimitrakopoulos, R.1
Martinez, L.S.2
Ramazan, S.3
-
4
-
-
80855131397
-
Integrated open pit pushback selection and production capacity optimization
-
T. Elkington and R. Durham "Integrated open pit pushback selection and production capacity optimization," Journal of Mining Science, 47, No. 2 (2011).
-
(2011)
Journal of Mining Science
, vol.47
, Issue.2
-
-
Elkington, T.1
Durham, R.2
-
5
-
-
77952886476
-
High-order stochastic simulations for complex non-Gaussian and non-linear geological patterns
-
H. Mustapha and R. Dimitrakopoulos "High-order stochastic simulations for complex non-Gaussian and non-linear geological patterns," Mathematical Geosciences, 42, No. 5 (2010).
-
(2010)
Mathematical Geosciences
, vol.42
, Issue.5
-
-
Mustapha, H.1
Dimitrakopoulos, R.2
-
7
-
-
33750463822
-
Managing risk and waste mining in long-term production scheduling
-
M. Godoy and R. Dimitrakopoulos, "Managing risk and waste mining in long-term production scheduling," SME Transactions, 316 (2004).
-
(2004)
SME Transactions
, vol.316
-
-
Godoy, M.1
Dimitrakopoulos, R.2
-
8
-
-
37249062755
-
A stochastic optimization model for open pit mine planning: Application and risk analysis at a copper deposit
-
A. Leite, and R. Dimitrakopoulos, "A stochastic optimization model for open pit mine planning: Application and risk analysis at a copper deposit," in: Mining Technology, Transactions of the Institute of Materials, Minerals and Mining, 116, No. 3 (2007).
-
(2007)
Mining Technology, Transactions of the Institute of Materials, Minerals and Mining
, vol.116
, Issue.3
-
-
Leite, A.1
Dimitrakopoulos, R.2
-
10
-
-
80855141241
-
Production scheduling under metal uncertainty-application of stochastic mathematical programming at an open pit copper mine and comparison to conventional scheduling
-
A. Leite and R. Dimitrakopoulos, "Production scheduling under metal uncertainty-application of stochastic mathematical programming at an open pit copper mine and comparison to conventional scheduling," in: Orebody Modelling and Strategic Mine Planning, Spectrum Series AusIMM, 2nd Edition (2009).
-
(2009)
Orebody Modelling and Strategic Mine Planning, Spectrum Series AusIMM, 2nd Edition
-
-
Leite, A.1
Dimitrakopoulos, R.2
-
11
-
-
80855164933
-
Pushback design of open pit mines under geological and market uncertainties
-
C. Meagher, S. A. A. Sabour, and R. Dimitrakopoulos, "Pushback design of open pit mines under geological and market uncertainties," in: Orebody Modelling and Strategic Mine Planning, Spectrum Series AusIMM, 2nd Edition (2009).
-
(2009)
Orebody Modelling and Strategic Mine Planning, Spectrum Series AusIMM, 2nd Edition
-
-
Meagher, C.1
Sabour, S.A.A.2
Dimitrakopoulos, R.3
-
12
-
-
33646685418
-
Real options by spreadsheet: Parking garage case example
-
R. de Neufville, S. Scholtes, and T. Wang, "Real options by spreadsheet: parking garage case example," Journal of Infrastructure Systems, 12, No. 2 (2005).
-
(2005)
Journal of Infrastructure Systems
, vol.12
, Issue.2
-
-
De Neufville, R.1
Scholtes, S.2
Wang, T.3
-
17
-
-
56349131246
-
A process to improve expected value of mining operations
-
M. A. Cardin, R.de Neufville, and V. Kazakidis, "A process to improve expected value of mining operations," in: Mining Technology, Transactions of the Institute of Materials, Minerals and Mining, 117, No. 2 (2008).
-
(2008)
Mining Technology, Transactions of the Institute of Materials, Minerals and Mining
, vol.117
, Issue.2
-
-
Cardin, M.A.1
De Neufville, R.2
Kazakidis, V.3
-
19
-
-
35448937145
-
Evaluating mine plans under uncertainty: Can the real options make a difference?
-
R. Dimitrakopoulos and S. A. Abdel Sabour, "Evaluating mine plans under uncertainty: Can the real options make a difference?" Resources Policy, 32, No. 3 (2007).
-
(2007)
Resources Policy
, vol.32
, Issue.3
-
-
Dimitrakopoulos, R.1
Abdel Sabour, S.A.2
-
20
-
-
33750081068
-
Estimating the volatility of mining projects considering price and operating cost uncertainties
-
G. A. C. Lima and S. B. Suslick, "Estimating the volatility of mining projects considering price and operating cost uncertainties," Resources Policy, No. 3 (2006).
-
(2006)
Resources Policy
, Issue.3
-
-
Lima, G.A.C.1
Suslick, S.B.2
|