Volumn 47, Issue 2, 2011, Pages 212-226

Flexible open-pit mine design under uncertainty

Author keywords

Flexibility; Mine design; Real options; Robust design; Stochastic simulation; Uncertainty

Indexed keywords

DECISION MAKING; INTEGER PROGRAMMING; STOCHASTIC MODELS; STOCHASTIC SYSTEMS;

EID: 80855124340     PISSN: 10627391     EISSN: None     Source Type: Journal    
DOI: 10.1134/S1062739147020080     Document Type: Article
Times cited : (58)

References (21)
  • 1
    • 80052237398 scopus 로고    scopus 로고
    • Evaluation of a mining project using discounted cash flow analysis, decision tree analysis, Monte Carlo simulation and real options using an example
    • E. Topal, "Evaluation of a mining project using discounted cash flow analysis, decision tree analysis, Monte Carlo simulation and real options using an example," International Journal of Mining and Mineral Engineering, 1, No. 1 (2008).
    • (2008) International Journal of Mining and Mineral Engineering , vol.1 , Issue.1
    • Topal, E.1
  • 2
    • 0002931897 scopus 로고    scopus 로고
    • Risk in minerals industry projects: Perception, analysis and management
    • P. A. Dowd, "Risk in minerals industry projects: perception, analysis and management," Transactions of the Institute of Mining and Metallurgy, 106, No. A (1997).
    • (1997) Transactions of the Institute of Mining and Metallurgy , vol.106 , Issue.A
    • Dowd, P.A.1
  • 3
    • 34250173438 scopus 로고    scopus 로고
    • A maximum upside/minimum downside approach to the traditional optimization of open pit mine design
    • R. Dimitrakopoulos, L. S. Martinez, and S. Ramazan, "A maximum upside/minimum downside approach to the traditional optimization of open pit mine design," Journal of Mining Science, 43 (2007).
    • (2007) Journal of Mining Science , vol.43
    • Dimitrakopoulos, R.1    Martinez, L.S.2    Ramazan, S.3
  • 4
    • 80855131397 scopus 로고    scopus 로고
    • Integrated open pit pushback selection and production capacity optimization
    • T. Elkington and R. Durham "Integrated open pit pushback selection and production capacity optimization," Journal of Mining Science, 47, No. 2 (2011).
    • (2011) Journal of Mining Science , vol.47 , Issue.2
    • Elkington, T.1    Durham, R.2
  • 5
    • 77952886476 scopus 로고    scopus 로고
    • High-order stochastic simulations for complex non-Gaussian and non-linear geological patterns
    • H. Mustapha and R. Dimitrakopoulos "High-order stochastic simulations for complex non-Gaussian and non-linear geological patterns," Mathematical Geosciences, 42, No. 5 (2010).
    • (2010) Mathematical Geosciences , vol.42 , Issue.5
    • Mustapha, H.1    Dimitrakopoulos, R.2
  • 6
    • 59649089555 scopus 로고    scopus 로고
    • Block-support simulation of multiple correlated variables
    • A. Boucher and R. Dimitrakopoulos, "Block-support simulation of multiple correlated variables," Mathematical Geosciences, 41 (2009).
    • (2009) Mathematical Geosciences , vol.41
    • Boucher, A.1    Dimitrakopoulos, R.2
  • 7
    • 33750463822 scopus 로고    scopus 로고
    • Managing risk and waste mining in long-term production scheduling
    • M. Godoy and R. Dimitrakopoulos, "Managing risk and waste mining in long-term production scheduling," SME Transactions, 316 (2004).
    • (2004) SME Transactions , vol.316
    • Godoy, M.1    Dimitrakopoulos, R.2
  • 10
    • 80855141241 scopus 로고    scopus 로고
    • Production scheduling under metal uncertainty-application of stochastic mathematical programming at an open pit copper mine and comparison to conventional scheduling
    • A. Leite and R. Dimitrakopoulos, "Production scheduling under metal uncertainty-application of stochastic mathematical programming at an open pit copper mine and comparison to conventional scheduling," in: Orebody Modelling and Strategic Mine Planning, Spectrum Series AusIMM, 2nd Edition (2009).
    • (2009) Orebody Modelling and Strategic Mine Planning, Spectrum Series AusIMM, 2nd Edition
    • Leite, A.1    Dimitrakopoulos, R.2
  • 19
    • 35448937145 scopus 로고    scopus 로고
    • Evaluating mine plans under uncertainty: Can the real options make a difference?
    • R. Dimitrakopoulos and S. A. Abdel Sabour, "Evaluating mine plans under uncertainty: Can the real options make a difference?" Resources Policy, 32, No. 3 (2007).
    • (2007) Resources Policy , vol.32 , Issue.3
    • Dimitrakopoulos, R.1    Abdel Sabour, S.A.2
  • 20
    • 33750081068 scopus 로고    scopus 로고
    • Estimating the volatility of mining projects considering price and operating cost uncertainties
    • G. A. C. Lima and S. B. Suslick, "Estimating the volatility of mining projects considering price and operating cost uncertainties," Resources Policy, No. 3 (2006).
    • (2006) Resources Policy , Issue.3
    • Lima, G.A.C.1    Suslick, S.B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.