-
2
-
-
27844583815
-
Streamlining product lifecycle processes: A survey of product lifecycle management implementations, directions, and challenges
-
DOI 10.1115/1.2031270
-
Rangan, R.M., S.M. Rohde, R. Peak, B. Chadha, and P. Bliznakov, Streamlining Product Lifecycle Processes: A Survey of Product Lifecycle Management Implementations, Directions, and Challenges. Journal of Computing and Information Science in Engineering, 2005. 5: p. 227-237. (Pubitemid 41639761)
-
(2005)
Journal of Computing and Information Science in Engineering
, vol.5
, Issue.3
, pp. 227-237
-
-
Rangan, R.M.1
Rohde, S.M.2
Peak, R.3
Chadha, B.4
Bliznakov, P.5
-
3
-
-
77956573772
-
Bridging Semantic Gaps between Stakeholders in the Production Automation Domain with Ontology Areas
-
Biffl, S., W.D. Sunindyo, and T. Moser, Bridging Semantic Gaps Between Stakeholders in the Production Automation Domain with Ontology Areas, in 21st International Conference on Software Engineering and Knowledge Engineering. 2009, KSI. p. 233-239.
-
21st International Conference on Software Engineering and Knowledge Engineering. 2009, KSI
, pp. 233-239
-
-
Biffl, S.1
Sunindyo, W.D.2
Moser, T.3
-
4
-
-
79960034463
-
logi.CAD Anwendungen in Wasserkraftanlagen
-
Presentation at Monheim, Germany
-
Schindele, A., logi.CAD Anwendungen in Wasserkraftanlagen. Presentation at logi.cals Powerdays, Monheim, Germany, 2009.
-
(2009)
logi.cals Powerdays
-
-
Schindele, A.1
-
6
-
-
25444510563
-
-
International Society for Pharmaceutical Engineering (ISPE)
-
GAMP 5 - Good Automated Manufacturing Practice. International Society for Pharmaceutical Engineering (ISPE), 2008.
-
(2008)
GAMP 5 - Good Automated Manufacturing Practice
-
-
-
8
-
-
84991575075
-
Making Sense of Revision-control Systems
-
O'Sullivan, B., Making Sense of Revision-control Systems. Queue, 2009. 7(7): p. 30-40.
-
(2009)
Queue
, vol.7
, Issue.7
, pp. 30-40
-
-
O'Sullivan, B.1
-
9
-
-
25844483711
-
Version control systems
-
DOI 10.1109/MS.2005.140
-
Spinellis, D., Version control systems. Software, IEEE, 2005. 22(5): p. 108-109. (Pubitemid 41398577)
-
(2005)
IEEE Software
, vol.22
, Issue.5
, pp. 108-109
-
-
Spinellis, D.1
-
10
-
-
80054972832
-
Engineering Project Management Using the Engineering Cockpit
-
Lisbon, Portugal. p. accepted for publication
-
Moser, T., R. Mordinyi, D. Winkler, and S. Biffl, Engineering Project Management Using The Engineering Cockpit, in IEEE 9th International Conference on. Industrial Informatics (INDIN'2011). 2011: Lisbon, Portugal. p. accepted for publication.
-
(2011)
IEEE 9th International Conference on. Industrial Informatics (INDIN'2011)
-
-
Moser, T.1
Mordinyi, R.2
Winkler, D.3
Biffl, S.4
-
11
-
-
80655137067
-
Engineering Object Change Management Process Observation in Distributed Automation Systems Projects
-
Denmark. p. accepted for publication
-
Winkler, D., T. Moser, R. Mordinyi, W.D. Sunindyo, and S. Biffl, Engineering Object Change Management Process Observation in Distributed Automation Systems Projects, in 18th European System & Software Process Improvement and Innovation (EuroSPI 2011). 2011: Denmark. p. accepted for publication.
-
(2011)
18th European System & Software Process Improvement and Innovation (EuroSPI 2011)
-
-
Winkler, D.1
Moser, T.2
Mordinyi, R.3
Sunindyo, W.D.4
Biffl, S.5
|