메뉴 건너뛰기




Volumn 17, Issue 4, 2011, Pages 351-370

Maintenance engineering in capital-intensive manufacturing systems

Author keywords

Asia; Capital intensive industry; Effectiveness; Losses; Maintenance; Steelmaking

Indexed keywords

ACCURATE ESTIMATION; ASIA; CAPITAL-INTENSIVE INDUSTRY; CHEMICAL COMPANIES; COMPREHENSIVE MODEL; DESIGN/METHODOLOGY/APPROACH; EFFECTIVENESS; EQUIPMENT EFFECTIVENESS; INTEGRATED EQUIPMENT; LOSS ANALYSIS; MANUFACTURING PROCESS; MULTIPLE-CASE STUDY; NEW MODEL; OVERALL EQUIPMENT EFFECTIVENESS; PROCESS CYCLES; STRATEGIC DECISIONS;

EID: 80455178833     PISSN: 13552511     EISSN: None     Source Type: Journal    
DOI: 10.1108/13552511111180177     Document Type: Article
Times cited : (6)

References (21)
  • 1
    • 0032657892 scopus 로고    scopus 로고
    • Economic criteria to select a cost-effective maintenance policy
    • Al-Najjar, B. (1999), "Economic criteria to select a cost-effective maintenance policy", Journal of Quality in Maintenance Engineering, Vol. 5 No. 3, pp. 236-48.
    • (1999) Journal of Quality in Maintenance Engineering , vol.5 , Issue.3 , pp. 236-48
    • Al-Najjar, B.1
  • 5
    • 13844256138 scopus 로고    scopus 로고
    • Combining optimisation and simulation for steel production scheduling
    • Appelqvist, P. and Lehtonen, J. (2005), "Combining optimisation and simulation for steel production scheduling", Journal of Manufacturing Technology Management, Vol. 16 No. 2, pp. 197-210.
    • (2005) Journal of Manufacturing Technology Management , vol.16 , Issue.2 , pp. 197-210
    • Appelqvist, P.1    Lehtonen, J.2
  • 10
    • 0030719319 scopus 로고    scopus 로고
    • Mathematical programming approaches for the management of maintenance planning and scheduling
    • Duffuaa, S.O. and Al-Sultan, K.S. (1997), "Mathematical programming approaches for the management of maintenance planning and scheduling", Journal of Quality in Maintenance Engineering, Vol. 3 No. 3, pp. 163-76.
    • (1997) Journal of Quality in Maintenance Engineering , vol.3 , Issue.3 , pp. 163-76
    • Duffuaa, S.O.1    Al-Sultan, K.S.2
  • 13
    • 0030102183 scopus 로고    scopus 로고
    • Primary production scheduling at steel-making industries
    • Lee, H.S. and Murthy, S.S. (1996), "Primary production scheduling at steel-making industries", IBM Journal of Research & Development, Vol. 40 No. 2, pp. 231-53.
    • (1996) IBM Journal of Research & Development , vol.40 , Issue.2 , pp. 231-53
    • Lee, H.S.1    Murthy, S.S.2
  • 16
  • 18
    • 0036542527 scopus 로고    scopus 로고
    • An efficient scheduling algorithm for the hot coil making in the steel mini-mill
    • Park, H., Hong, Y. and Chang, S.Y. (2002), "An efficient scheduling algorithm for the hot coil making in the steel mini-mill", Production Planning & Control, Vol. 13 No. 3, pp. 298-306.
    • (2002) Production Planning & Control , vol.13 , Issue.3 , pp. 298-306
    • Park, H.1    Hong, Y.2    Chang, S.Y.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.