메뉴 건너뛰기




Volumn 16, Issue 2, 2005, Pages 197-210

Combining optimisation and simulation for steel production scheduling

Author keywords

Finland; Production metallurgy; Production scheduling; Simulation

Indexed keywords

ALGORITHMS; COMPUTER SIMULATION; CONSTRAINT THEORY; METALLURGY; OPTIMIZATION; PROBLEM SOLVING; PRODUCTION; SCHEDULING;

EID: 13844256138     PISSN: 1741038X     EISSN: None     Source Type: Journal    
DOI: 10.1108/17410380510576831     Document Type: Article
Times cited : (21)

References (29)
  • 2
    • 0032091676 scopus 로고    scopus 로고
    • An application of a planning and scheduling multi-model approach in the chemical industry
    • Artiba, A. and Riane, F. (1998), "An application of a planning and scheduling multi-model approach in the chemical industry", Computers in Industry, Vol. 36 No. 3, pp. 209-29.
    • (1998) Computers in Industry , vol.36 , Issue.3 , pp. 209-229
    • Artiba, A.1    Riane, F.2
  • 4
    • 0002381223 scopus 로고
    • Machine sequencing via disjunctive graphs: An implicit enumeration algorithm
    • Balas, E. (1969), "Machine sequencing via disjunctive graphs: an implicit enumeration algorithm", Operations Research, Vol. 17 No. 6, pp. 941-57.
    • (1969) Operations Research , vol.17 , Issue.6 , pp. 941-957
    • Balas, E.1
  • 6
    • 0030212629 scopus 로고    scopus 로고
    • The job shop-scheduling problem: Conventional and new solution techniques
    • Blazewicz, J., Domschke, W. and Pesch, E. (1996), "The job shop-scheduling problem: conventional and new solution techniques", European Journal of Operational Research, Vol. 93 No. 1, pp. 1-33.
    • (1996) European Journal of Operational Research , vol.93 , Issue.1 , pp. 1-33
    • Blazewicz, J.1    Domschke, W.2    Pesch, E.3
  • 7
    • 0023843528 scopus 로고
    • A scheduling model for LTV Steel's Cleveland works' twin strand continuous slab caster
    • Box, R.E. and Herbe, D.G. Jr (1988), "A scheduling model for LTV Steel's Cleveland works' twin strand continuous slab caster", Interfaces, Vol. 18 No. 1, pp. 42-57.
    • (1988) Interfaces , vol.18 , Issue.1 , pp. 42-57
    • Box, R.E.1    Herbe Jr., D.G.2
  • 8
    • 0009316353 scopus 로고
    • A dynamic scheduling and control system in an ENSIDESA steel plant
    • Diaz, A., Sancho, L., Garcia, R. and Larraneta, J. (1991), "A dynamic scheduling and control system in an ENSIDESA steel plant", Interfaces, VoL 21 No. 5, pp. 52-62.
    • (1991) Interfaces , vol.21 , Issue.5 , pp. 52-62
    • Diaz, A.1    Sancho, L.2    Garcia, R.3    Larraneta, J.4
  • 10
    • 0000131281 scopus 로고
    • Algorithms for solving production-scheduling problems
    • Giffler, B. and Thompson, G.L. (1960), "Algorithms for solving production-scheduling problems", Operations Research, Vol. 8 No. 4, pp. 487-503.
    • (1960) Operations Research , vol.8 , Issue.4 , pp. 487-503
    • Giffler, B.1    Thompson, G.L.2
  • 11
    • 0036927449 scopus 로고    scopus 로고
    • Simulation based multi-objective schedule optimization in semiconductor manufacturing
    • San Diego, CA, 8-11 December
    • Gupta, A.K. and Sivakumar, A.I. (2002), "Simulation based multi-objective schedule optimization in semiconductor manufacturing", Proceedings of the 2002 Winter Simulation Conference, San Diego, CA, 8-11 December, pp. 1862-70.
    • (2002) Proceedings of the 2002 Winter Simulation Conference , pp. 1862-1870
    • Gupta, A.K.1    Sivakumar, A.I.2
  • 13
    • 13844303107 scopus 로고    scopus 로고
    • World steel in figures
    • available at (accessed 20 August)
    • IISI (2002), "World steel in figures", Rio de Janeiro, available at www.worldsteel.org (accessed 20 August).
    • (2002) Rio De Janeiro
  • 14
    • 0033102020 scopus 로고    scopus 로고
    • Deterministic job-shop scheduling: Past, present and future
    • Jain, A.S. and Meeran, S. (1999), "Deterministic job-shop scheduling: past, present and future", European Journal of Operational Research, Vol. 113 No. 2, pp. 390-434.
    • (1999) European Journal of Operational Research , vol.113 , Issue.2 , pp. 390-434
    • Jain, A.S.1    Meeran, S.2
  • 15
    • 0030102183 scopus 로고    scopus 로고
    • Primary production scheduling at steel-making industries
    • Lee, H.S. and Murthy, S.S. (1996), "Primary production scheduling at steel-making industries", IBM Journal of Research & Development, VoL 40 No. 2, pp. 231-53.
    • (1996) IBM Journal of Research & Development , vol.40 , Issue.2 , pp. 231-253
    • Lee, H.S.1    Murthy, S.S.2
  • 18
    • 0036542527 scopus 로고    scopus 로고
    • An efficient scheduling algorithm for the hot coil making in the steel mini-mill
    • Park, H., Hong, Y. and Chang, S.Y. (2002), "An efficient scheduling algorithm for the hot coil making in the steel mini-mill", Production Planning & Control, Vol. 13 No. 3, pp. 298-306.
    • (2002) Production Planning & Control , vol.13 , Issue.3 , pp. 298-306
    • Park, H.1    Hong, Y.2    Chang, S.Y.3
  • 19
    • 13844301333 scopus 로고    scopus 로고
    • Vice President, Steel making, Rautaruukki Steel Oy, presentation at National Technology Agency of Finland, Steel Conference, Espoo, 26 October
    • Pisilä, E. (2001), Vice President, Steel making, Rautaruukki Steel Oy, presentation at National Technology Agency of Finland, Steel Conference, Espoo, 26 October.
    • (2001)
    • Pisilä, E.1
  • 20
    • 0035546054 scopus 로고    scopus 로고
    • An integrated production planning and scheduling system for hybrid flowshop organizations
    • Riane, F., Artiba, A. and Iassinovski, S. (2001), "An integrated production planning and scheduling system for hybrid flowshop organizations", International Journal of Production Economics, Vol. 74 No. 1-3, pp. 33-48.
    • (2001) International Journal of Production Economics , vol.74 , Issue.1-3 , pp. 33-48
    • Riane, F.1    Artiba, A.2    Iassinovski, S.3
  • 22
    • 0029406326 scopus 로고
    • The role of discrete event simulation techniques in finite capacity scheduling
    • Roy, R. and Meikle, S.E. (1995), "The role of discrete event simulation techniques in finite capacity scheduling", Journal of the Operational Research Society, Vol. 46 No. 11, pp. 1310-21.
    • (1995) Journal of the Operational Research Society , vol.46 , Issue.11 , pp. 1310-1321
    • Roy, R.1    Meikle, S.E.2
  • 23
    • 13844290469 scopus 로고    scopus 로고
    • CFO, Rautaruukki Group, presentation at Stockholm, 10 August
    • Sahlman, S. (2002), CFO, Rautaruukki Group, presentation at Nordic Basic Industry Seminar, Stockholm, 10 August.
    • (2002) Nordic Basic Industry Seminar
    • Sahlman, S.1
  • 24
    • 0029705887 scopus 로고    scopus 로고
    • A survey of approaches to the job shop scheduling problem
    • paper presented at the Baton Rouge, LA
    • Sellers, D.W. (1996), "A survey of approaches to the job shop scheduling problem", paper presented at the 28th Southeastern Symposium on System Theory, Baton Rouge, LA.
    • (1996) 28th Southeastern Symposium on System Theory
    • Sellers, D.W.1
  • 27
    • 13844295626 scopus 로고    scopus 로고
    • personal communication, 28 July
    • Sipola, M. (2003), personal communication, 28 July.
    • (2003)
    • Sipola, M.1
  • 28
    • 0026936702 scopus 로고
    • Knowledge-based production management approaches, results and prospects
    • Smith, S.F. (1992), "Knowledge-based production management approaches, results and prospects", Production Planning & Control, Vol. 3 No. 4, pp. 350-80.
    • (1992) Production Planning & Control , vol.3 , Issue.4 , pp. 350-380
    • Smith, S.F.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.