메뉴 건너뛰기




Volumn , Issue , 2011, Pages 26-31

Harmony search algorithm for flexible manufacturing system (FMS) machine loading problem

Author keywords

Flexible manufacturing system; Harmony Search algorithm; Machine loading; System unbalance; Throughput

Indexed keywords

CAPACITY PLANNING; DOMAIN PROBLEMS; FEASIBLE SOLUTION; HARMONY SEARCH ALGORITHMS; MACHINE LOADING; MACHINE LOADING PROBLEMS; MACHINE TIME; MANUFACTURING INDUSTRIES; PART SELECTION; PROBLEM SIZE; PRODUCT LIFE CYCLES; PRODUCT VARIETY; PRODUCTION FLOOR; RESOURCE OPTIMIZATION; SOLUTION METHODS; SYSTEM UNBALANCE; TECHNOLOGICAL CONSTRAINTS;

EID: 80055053062     PISSN: 21556938     EISSN: 21556946     Source Type: Conference Proceeding    
DOI: 10.1109/DMO.2011.5976500     Document Type: Conference Paper
Times cited : (11)

References (13)
  • 2
    • 0020718128 scopus 로고
    • Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems
    • K. E. Stecke, "Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems," Management Science, vol. 29, no. 3, pp. 273-288, 1983.
    • (1983) Management Science , vol.29 , Issue.3 , pp. 273-288
    • Stecke, K.E.1
  • 3
    • 33748437416 scopus 로고    scopus 로고
    • Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm
    • A. Kumar, Prakash, M. Tiwari, R. Shankar, and A. Baveja, "Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm," European Journal of Operational Research, vol. 175, no. 2, pp. 1043 - 1069, 2006.
    • (2006) European Journal of Operational Research , vol.175 , Issue.2 , pp. 1043-1069
    • Kumar, A.1    Tiwari, P.M.2    Shankar, R.3    Baveja, A.4
  • 4
    • 1942472532 scopus 로고    scopus 로고
    • Solving the machine-loading problem in a flexible manufacturing system using a combinatorial auction-based approach
    • Srinivas, M. K. Tiwari, and V. Allada, "Solving the machine-loading problem in a flexible manufacturing system using a combinatorial auction-based approach," International Journal of Production Research , vol. 42, no. 9, pp. 1879 - 1893, 2004.
    • (2004) International Journal of Production Research , vol.42 , Issue.9 , pp. 1879-1893
    • Tiwari, S.K.M.1    Allada, V.2
  • 5
    • 1842864950 scopus 로고    scopus 로고
    • Modeling machine loading problem of fmss and its solution methodology using a hybrid tabu search and sim- ulated annealing-based heuristic approach
    • R. Swarnkar and M. K. Tiwari, "Modeling machine loading problem of fmss and its solution methodology using a hybrid tabu search and sim- ulated annealing-based heuristic approach," Robotics and Computer- Integrated Manufacturing, vol. 20, no. 3, pp. 199-209, 2004.
    • (2004) Robotics and Computer- Integrated Manufacturing , vol.20 , Issue.3 , pp. 199-209
    • Swarnkar, R.1    Tiwari, M.K.2
  • 6
    • 0034974417 scopus 로고    scopus 로고
    • A new heuristic opti- mization algorithm: Harmony search
    • Z. W. Geem, J. H. Kim, and G. Loganathan, "A new heuristic opti- mization algorithm: Harmony search," SIMULATION, vol. 76, no. 2, pp. 60-68, 2001.
    • (2001) Simulation , vol.76 , Issue.2 , pp. 60-68
    • Geem, Z.W.1    Kim, J.H.2    Loganathan, G.3
  • 8
    • 33750695940 scopus 로고    scopus 로고
    • ser. Lecture Notes in Computer Science, B. Gabrys, R. Howlett, and L. Jain, Eds. Springer Berlin / Heidelberg
    • Z. Geem, Improved Harmony Search from Ensemble of Music Players, ser. Lecture Notes in Computer Science, B. Gabrys, R. Howlett, and L. Jain, Eds. Springer Berlin / Heidelberg, 2006, vol. 4251.
    • (2006) Improved Harmony Search from Ensemble of Music Players , vol.4251
    • Geem, Z.1
  • 9
    • 79952188914 scopus 로고    scopus 로고
    • A harmony search algorithm for uni- versity course timetabling
    • M. Al-Betar and A. Khader, "A harmony search algorithm for uni- versity course timetabling," Annals of Operations Research, pp. 1-29, 2010.
    • (2010) Annals of Operations Research , pp. 1-29
    • Al-Betar, M.1    Khader, A.2
  • 10
    • 0026914581 scopus 로고
    • A heuristic procedure for loading problems in flexible manufacturing systems
    • S. K. Mukhopadhyay, S. Midha, and V. M. Krishna, "A heuristic procedure for loading problems in flexible manufacturing systems," International Journal of Production Research, vol. 30, no. 9, pp. 2213 - 2228, 1992.
    • (1992) International Journal of Production Research , vol.30 , Issue.9 , pp. 2213-2228
    • Mukhopadhyay, S.K.1    Midha, S.2    Krishna, V.M.3
  • 11
    • 0024673709 scopus 로고
    • Some solution methodologies for loading problems in a flexible manufacturing system
    • K. Shanker and A. Srinivasulu, "Some solution methodologies for loading problems in a flexible manufacturing system," International Journal of Production Research, vol. 27, no. 6, pp. 1019 - 1034, 1989.
    • (1989) International Journal of Production Research , vol.27 , Issue.6 , pp. 1019-1034
    • Shanker, K.1    Srinivasulu, A.2
  • 12
    • 33644772055 scopus 로고    scopus 로고
    • A heuristic based on multi-stage programming approach for machine-loading problem in a flexible manufacturing system
    • N. Nagarjuna, O. Mahesh, and K. Rajagopal, "A heuristic based on multi-stage programming approach for machine-loading problem in a flexible manufacturing system," Robotics and Computer-Integrated Manufacturing, vol. 22, no. 4, pp. 342-352, 2006.
    • (2006) Robotics and Computer-Integrated Manufacturing , vol.22 , Issue.4 , pp. 342-352
    • Nagarjuna, N.1    Mahesh, O.2    Rajagopal, K.3
  • 13
    • 70449560996 scopus 로고    scopus 로고
    • An efficient hybrid evolutionary heuristic using genetic algorithm and simulated annealing algorithm to solve machine loading problem in fms
    • M. Yogeswaran, S. G. Ponnambalam, and M. K. Tiwari, "An efficient hybrid evolutionary heuristic using genetic algorithm and simulated annealing algorithm to solve machine loading problem in fms," International Journal of Production Research, vol. 47, no. 19, pp. 5421 - 5448, 2009.
    • (2009) International Journal of Production Research , vol.47 , Issue.19 , pp. 5421-5448
    • Yogeswaran, M.1    Ponnambalam, S.G.2    Tiwari, M.K.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.