-
1
-
-
27844479532
-
Fuzzy goal-programming model with an artificial immune system (AIS) approach for a machine tool selection and operation allocation problem in a flexible manufacturing system
-
Chan, F.T.S., Swarnkar, R., and Tiwari, M.K., 2005. Fuzzy goal-programming model with an artificial immune system (AIS) approach for a machine tool selection and operation allocation problem in a flexible manufacturing system. International Journal of Production Research, 43 (19), 4147-4163.
-
(2005)
International Journal of Production Research
, vol.43
, Issue.19
, pp. 4147-4163
-
-
Chan, F.T.S.1
Swarnkar, R.2
Tiwari, M.K.3
-
2
-
-
33947162394
-
Generator maintenance scheduling in power systems using metaheuristic-based hybrid approaches
-
Dahal, K.P. and Chakpitak, N., 2007. Generator maintenance scheduling in power systems using metaheuristic-based hybrid approaches. Electric Power Systems Research, 77, 771-779.
-
(2007)
Electric Power Systems Research
, vol.77
, pp. 771-779
-
-
Dahal, K.P.1
Chakpitak, N.2
-
4
-
-
30844470014
-
A reallocation-based heuristic to solve a machine loading problem with material handling constraint in a flexible manufacturing system
-
Goswami, M. and Tiwari, M.K., 2006. A reallocation-based heuristic to solve a machine loading problem with material handling constraint in a flexible manufacturing system. International Journal of Production Research, 44 (3), 569-588.
-
(2006)
International Journal of Production Research
, vol.44
, Issue.3
, pp. 569-588
-
-
Goswami, M.1
Tiwari, M.K.2
-
5
-
-
0002773716
-
Incorporating problem specific knowledge into genetic algorithms
-
L. Davis, ed. Los Altos, CA: Kaufman
-
Grefenstette, J., 1987. Incorporating problem specific knowledge into genetic algorithms. In: L. Davis, ed. Genetic algorithms and simulated annealing. Los Altos, CA: Kaufman, 42-60.
-
(1987)
Genetic Algorithms and Simulated Annealing
, pp. 42-60
-
-
Grefenstette, J.1
-
6
-
-
0025843905
-
A parallel heuristic for quadratic assignment problems
-
Huntley, C.L. and Brown, D.E., 1991. A parallel heuristic for quadratic assignment problems. Computing Operations Research, 18, 275-289.
-
(1991)
Computing Operations Research
, vol.18
, pp. 275-289
-
-
Huntley, C.L.1
Brown, D.E.2
-
7
-
-
0024770085
-
Optimisation by simulated annealing: An experimental evaluation: Part 1 Graph partitioning
-
Johnson, D.S., Aragon, C.R., McGeoch, L.A., and Schevon, C., 1989. Optimisation by simulated annealing: an experimental evaluation: Part 1. Graph partitioning. Operations Research, 37, 865-891.
-
(1989)
Operations Research
, vol.37
, pp. 865-891
-
-
Johnson, D.S.1
Aragon, C.R.2
McGeoch, L.A.3
Schevon, C.4
-
8
-
-
0033078591
-
Some new results on simulated annealing applied to the job shop scheduling problem
-
Kolonko, M., 1999. Some new results on simulated annealing applied to the job shop scheduling problem. European Journal of Operational Research, 113, 123-136.
-
(1999)
European Journal of Operational Research
, vol.113
, pp. 123-136
-
-
Kolonko, M.1
-
9
-
-
1942505878
-
A fuzzy based algorithm to solve the machineloading problems of a FMS and its neuro fuzzy Petri net model
-
Kumar, R.R., Singh, A.K., and Tiwari, M.K., 2004. A fuzzy based algorithm to solve the machineloading problems of a FMS and its neuro fuzzy Petri net model. International Journal of Advanced Manufacturing Technology, 23 (5/6), 318-341.
-
(2004)
International Journal of Advanced Manufacturing Technology
, vol.23
, Issue.5-6
, pp. 318-341
-
-
Kumar, R.R.1
Singh, A.K.2
Tiwari, M.K.3
-
10
-
-
33748437416
-
Solving machine-loading problem of a flexible manufacturing system with constrained-based genetic algorithm
-
Kumar, A., Prakash Tiwari, M.K., Shankar, R., and Baveja, A., 2006. Solving machine-loading problem of a flexible manufacturing system with constrained-based genetic algorithm. European Journal of Operational Research, 175 (2), 1043-1069.
-
(2006)
European Journal of Operational Research
, vol.175
, Issue.2
, pp. 1043-1069
-
-
Kumar, A.1
Prakash Tiwari, M.K.2
Shankar, R.3
Baveja, A.4
-
11
-
-
4344664498
-
Fuzzy reliability evaluation of captive power plant maintenance scheduling incorporating uncertain forced outage rate and load representation
-
Mohanta, D.K., Sadhu, P.K., and Chakrabarti, R., 2004. Fuzzy reliability evaluation of captive power plant maintenance scheduling incorporating uncertain forced outage rate and load representation. Electric Power Systems Research, 72, 73-84.
-
(2004)
Electric Power Systems Research
, vol.72
, pp. 73-84
-
-
Mohanta, D.K.1
Sadhu, P.K.2
Chakrabarti, R.3
-
12
-
-
33750358079
-
Deterministic and stochastic approach for safety and reliability optimisation of captive power plant maintenance scheduling using GA/SA-based hybrid techniques: A comparison of results
-
Mohanta, D.K., Sadhu, P.K., and Chakrabarti, R., 2007. Deterministic and stochastic approach for safety and reliability optimisation of captive power plant maintenance scheduling using GA/SA-based hybrid techniques: a comparison of results. Reliability Engineering and System Safety, 92, 187-199.
-
(2007)
Reliability Engineering and System Safety
, vol.92
, pp. 187-199
-
-
Mohanta, D.K.1
Sadhu, P.K.2
Chakrabarti, R.3
-
14
-
-
0026239447
-
Heuristic solution to the scheduling problems in flexible manufacturing system
-
Mukhopadhyay, S.K., Maiti, B., and Garg, S., 1991. Heuristic solution to the scheduling problems in flexible manufacturing system. Journal of Production Research, 29 (10), 2003-2024.
-
(1991)
Journal of Production Research
, vol.29
, Issue.10
, pp. 2003-2024
-
-
Mukhopadhyay, S.K.1
Maiti, B.2
Garg, S.3
-
15
-
-
0026914581
-
A heuristic procedure for loading problem in flexible manufacturing systems
-
Mukhopadhyay, S.K., Midha, S., and Murlikrishna, V., 1992. A heuristic procedure for loading problem in flexible manufacturing systems. International Journal of Production Research, 30 (9), 2213-2228
-
(1992)
International Journal of Production Research
, vol.30
, Issue.9
, pp. 2213-2228
-
-
Mukhopadhyay, S.K.1
Midha, S.2
Murlikrishna, V.3
-
17
-
-
0032098662
-
FMS loading: A simulated annealing approach
-
Mukhopadhyay, S.K., Singh, M.K., and Srivastava, R., 1998. FMS loading: a simulated annealing approach. International Journal of Production Research, 36 (6), 1529-1547.
-
(1998)
International Journal of Production Research
, vol.36
, Issue.6
, pp. 1529-1547
-
-
Mukhopadhyay, S.K.1
Singh, M.K.2
Srivastava, R.3
-
18
-
-
33644772055
-
A heuristic based on multi-stage programming approach for machine loading problem in a flexible manufacturing system
-
Nagarjuna, N., Mahesh, O., and Rajagopal, K., 2006. A heuristic based on multi-stage programming approach for machine loading problem in a flexible manufacturing system. Robotics and Computer Integrated Manufacturing, 22 (4), 342-352.
-
(2006)
Robotics and Computer Integrated Manufacturing
, vol.22
, Issue.4
, pp. 342-352
-
-
Nagarjuna, N.1
Mahesh, O.2
Rajagopal, K.3
-
19
-
-
2942589074
-
A novel metaheuristic approach for the flow shop scheduling problem
-
Nearchou, A.C., 2004. A novel metaheuristic approach for the flow shop scheduling problem. Engineering Applications of Artificial Intelligence, 17, 289-300.
-
(2004)
Engineering Applications of Artificial Intelligence
, vol.17
, pp. 289-300
-
-
Nearchou, A.C.1
-
20
-
-
36749027726
-
Modified immune algorithm for job selection and operation allocation problem in flexible manufacturing systems
-
Prakash, A., Khilwani, N., Tiwari, M.K., and Cohen, Y., 2008. Modified immune algorithm for job selection and operation allocation problem in flexible manufacturing systems. Advances in Engineering Software, 39 (3), 219-232.
-
(2008)
Advances in Engineering Software
, vol.39
, Issue.3
, pp. 219-232
-
-
Prakash, A.1
Khilwani, N.2
Tiwari, M.K.3
Cohen, Y.4
-
21
-
-
0030241635
-
A hybrid ga-sa algorithm for just-in-time scheduling of multi-level assemblies
-
Roach, A. and Nagi, R., 1996. A hybrid ga-sa algorithm for just-in-time scheduling of multi-level assemblies. Computers and Industrial Engineering, 30 (4), 1047-1060.
-
(1996)
Computers and Industrial Engineering
, vol.30
, Issue.4
, pp. 1047-1060
-
-
Roach, A.1
Nagi, R.2
-
22
-
-
1842864950
-
Modeling machine loading problem of FMSs and its solution methodology using a hybrid tabu search and simulated annealing based heuristic approach
-
Swarnkar, R. and Tiwari, M.K., 2004. Modeling machine loading problem of FMSs and its solution methodology using a hybrid tabu search and simulated annealing based heuristic approach. Robotics and Computer Integrated Manufacturing, 20, 199-209.
-
(2004)
Robotics and Computer Integrated Manufacturing
, vol.20
, pp. 199-209
-
-
Swarnkar, R.1
Tiwari, M.K.2
-
23
-
-
0024673709
-
Some solution methodologies for loading problems in flexible manufacturing system
-
Shankar, K. and Srinivasulu, A., 1989. Some solution methodologies for loading problems in flexible manufacturing system. International Journal of Production Research, 27 (6), 1019-1034.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.6
, pp. 1019-1034
-
-
Shankar, K.1
Srinivasulu, A.2
-
24
-
-
0027814376
-
Scheduling in cellular manufacturing system: A simulated annealing approach
-
Sridhar, K. and Rajendran, C., 1993. Scheduling in cellular manufacturing system: a simulated annealing approach. International Journal of Production Research, 31 (12), 2927-2945.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.12
, pp. 2927-2945
-
-
Sridhar, K.1
Rajendran, C.2
-
25
-
-
1942472532
-
Solving the machine loading problem in a flexible manufacturing system using a combinatorial auction-based approach
-
Srinivas, Tiwari, M.K., and Allada, V., 2004. Solving the machine loading problem in a flexible manufacturing system using a combinatorial auction-based approach. International Journal of Production Research, 42 (9), 1879-1893.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.9
, pp. 1879-1893
-
-
Srinivas Tiwari, M.K.1
Allada, V.2
-
26
-
-
0031197478
-
A heuristic solution to machine loading problem of a FMS and its Petri net model
-
Tiwari, M.K., Hazarika, B., Vidyarthi, N.K., Jaggi, P., and Mukhopadhyay, S.K., 1997. A heuristic solution to machine loading problem of a FMS and its Petri net model. International Journal of Production Research, 35 (8), 2269-2284.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.8
, pp. 2269-2284
-
-
Tiwari, M.K.1
Hazarika, B.2
Vidyarthi, N.K.3
Jaggi, P.4
Mukhopadhyay, S.K.5
-
27
-
-
0034692672
-
Solving machine loading problem in flexible manufacturing system using genetic algorithm based heuristic approach
-
Tiwari, M.K. and Vidyarthi, N.K., 2000. Solving machine loading problem in flexible manufacturing system using genetic algorithm based heuristic approach. International Journal of Production Research, 38 (14), 3357-3384
-
(2000)
International Journal of Production Research
, vol.38
, Issue.14
, pp. 3357-3384
-
-
Tiwari, M.K.1
Vidyarthi, N.K.2
-
28
-
-
27744532970
-
Multi-agent-based approach to solve part section and task allocation problem in flexible manufacturing systems
-
Tripathi, A.K., Tiwari, M.K., and Chan, F.T.S., 2005. Multi-agent-based approach to solve part section and task allocation problem in flexible manufacturing systems. International Journal of Production Research, 43 (7), 1313-1335.
-
(2005)
International Journal of Production Research
, vol.43
, Issue.7
, pp. 1313-1335
-
-
Tripathi, A.K.1
Tiwari, M.K.2
Chan, F.T.S.3
-
29
-
-
0035917218
-
Machine loading problem of FMS: A fuzzy-based heuristic approach
-
Vidyarthi, N.K. and Tiwari, M.K., 2001. Machine loading problem of FMS: a fuzzy-based heuristic approach. International Journal of Production Research, 39 (5), 953-979.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.5
, pp. 953-979
-
-
Vidyarthi, N.K.1
Tiwari, M.K.2
-
30
-
-
0035324670
-
An effective hybrid optimisation strategy for job-shop scheduling problems
-
Wang, L. and Zheng, D.-Z., 2001. An effective hybrid optimisation strategy for job-shop scheduling problems. Computers & Operations Research, 28, 585-596.
-
(2001)
Computers & Operations Research
, vol.28
, pp. 585-596
-
-
Wang, L.1
Zheng, D.-Z.2
-
31
-
-
0001868119
-
Scheduling problems and the traveling salesman: The genetic edge recombination operator
-
December 1989, George Mason University, USA. San Francisco, CA: Morgan Kaufmann Publisher
-
Whitley, D., Starkweather, T., and Fuquay, D., 1989. Scheduling problems and the traveling salesman: the genetic edge recombination operator. In: Proceedings of the 3rd international conference on genetic algorithms and their applications, December 1989, George Mason University, USA. San Francisco, CA: Morgan Kaufmann Publisher, 133-140.
-
(1989)
Proceedings of the 3rd International Conference on Genetic Algorithms and Their Applications
, pp. 133-140
-
-
Whitley, D.1
Starkweather, T.2
Fuquay, D.3
-
32
-
-
33847685240
-
Scheduling algorithm for real-time tasks using multiobjective hybrid genetic algorithm in heterogeneous multiprocessors system
-
Yoo, M. and Gen, M., 2007. Scheduling algorithm for real-time tasks using multiobjective hybrid genetic algorithm in heterogeneous multiprocessors system. Computers & Operations Research, 34, 3084-3098.
-
(2007)
Computers & Operations Research
, vol.34
, pp. 3084-3098
-
-
Yoo, M.1
Gen, M.2
|