Volumn 26, Issue 4, 2011, Pages 2381-2389

Reliability assessment of time-dependent systems via sequential cross-entropy Monte Carlo simulation

Author keywords

Cross entropy method; Monte Carlo simulation; rare events; reliability assessment; renewable energy sources; risk analysis

Indexed keywords

CROSS-ENTROPY METHOD; MONTE CARLO SIMULATION; RARE EVENT; RELIABILITY ASSESSMENT; RENEWABLE ENERGY SOURCE;

EID: 80054934050     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2011.2112785     Document Type: Article
Times cited : (101)

References (21)
  • 3
    • 0004940548 scopus 로고
    • Incorporating of wind energy conversion systems in conventional generating capacity adequacy assessment
    • Jan.
    • R. Billinton and A. A. Chowdhury, "Incorporating of wind energy conversion systems in conventional generating capacity adequacy assessment", Proc. Inst. Elect. Eng. C, vol. 139, no. 1, pp. 45-56, Jan. 1992.
    • (1992) Proc. Inst. Elect. Eng. C , vol.139 , Issue.1 , pp. 45-56
    • Billinton, R.1    Chowdhury, A.A.2
  • 5
    • 0030385334 scopus 로고    scopus 로고
    • A sequential simulation technique for adequacy evaluation of generating systems including wind energy
    • R. Billinton, H. Chen, and R. Ghajar, "A sequential simulation technique for adequacy evaluation of generating systems including wind energy", IEEE Trans. Energy Convers., vol. 11, no. 4, pp. 728-734, Dec. 1996. (Pubitemid 126771427)
    • (1996) IEEE Transactions on Energy Conversion , vol.11 , Issue.4 , pp. 728-734
    • Billinton, R.1    Chen, H.2    Ghajar, R.3
  • 7
    • 80054955195 scopus 로고    scopus 로고
    • Dealing with intermittent generation in the long-term evaluation of system adequacy and operational reserve requirements in the Iberian peninsula
    • Paris, France, Aug.
    • J. A. Peças Lopes et al., "Dealing with intermittent generation in the long-term evaluation of system adequacy and operational reserve requirements in the Iberian peninsula", in Proc. Cigré, Paper C1-304, Paris, France, Aug. 2008.
    • (2008) Proc. Cigré, Paper C1-304
    • Peças Lopes, J.A.1
  • 8
    • 0034138495 scopus 로고    scopus 로고
    • Pseudo-chronological simulation for composite reliability analysis with time varying loads
    • Feb.
    • A. M. Leite da Silva, L. A. F. Manso, J. C. O. Mello, and R. Billinton, "Pseudo-chronological simulation for composite reliability analysis with time varying loads", IEEE Trans. Power Syst., vol. 15, no. 1, pp. 73-80, Feb. 2000.
    • (2000) IEEE Trans. Power Syst. , vol.15 , Issue.1 , pp. 73-80
    • Leite Da Silva, A.M.1    Manso, L.A.F.2    Mello, J.C.O.3    Billinton, R.4
  • 10
    • 49249086737 scopus 로고    scopus 로고
    • Population-based intelligent search in reliability evaluation of generation systems with wind power penetration
    • Aug.
    • L. Wang and C. Singh, "Population-based intelligent search in reliability evaluation of generation systems with wind power penetration", IEEE Trans. Power Syst., vol. 23, no. 3, pp. 1336-1345, Aug. 2008.
    • (2008) IEEE Trans. Power Syst. , vol.23 , Issue.3 , pp. 1336-1345
    • Wang, L.1    Singh, C.2
  • 11
    • 70350738355 scopus 로고    scopus 로고
    • Improving power system reliability calculation efficiency with EPSO variants
    • Nov.
    • V. Miranda, L. M. Carvalho, M. A. Rosa, A. M. Leite da Silva, and C. Singh, "Improving power system reliability calculation efficiency with EPSO variants", IEEE Trans. Power Syst., vol. 24, no. 4, pp. 1772-1779, Nov. 2009.
    • (2009) IEEE Trans. Power Syst. , vol.24 , Issue.4 , pp. 1772-1779
    • Miranda, V.1    Carvalho, L.M.2    Rosa, M.A.3    Leite Da Silva, A.M.4    Singh, C.5
  • 12
    • 0009956915 scopus 로고
    • Fast Monte Carlo simulation techniques for power system reliability studies
    • Paris, France
    • G. J. Anders, J. Endrenyi, M. V. F. Pereira, and L. M. V. G. Pinto, "Fast Monte Carlo simulation techniques for power system reliability studies", in Proc. CIGRE Symp., Paris, France, 1990, pp. 38-205.
    • (1990) Proc. CIGRE Symp. , pp. 38-205
    • Anders, G.J.1    Endrenyi, J.2    Pereira, M.V.F.3    Pinto, L.M.V.G.4
  • 13
    • 0030644191 scopus 로고    scopus 로고
    • Composite system adequacy assessment using sequential Monte Carlo simulation with variance reduction techniques
    • R. Billinton and A. Jonnavithula, "Composite system adequacy assessment using sequential Monte Carlo simulation with variance reduction techniques", Proc. Inst. Elect. Eng., Gen., Transm., Distrib., vol. 144, no. 1, pp. 1-6, Jan. 1997. (Pubitemid 127758226)
    • (1997) IEE Proceedings: Generation, Transmission and Distribution , vol.144 , Issue.1 , pp. 1-6
    • Billinton, R.1    Jonnavithula, A.2
  • 14
    • 0036683624 scopus 로고    scopus 로고
    • Studies on variance reduction technique of Monte Carlo simulation in composite system reliability evaluation
    • DOI 10.1016/S0378-7796(02)00089-5, PII S0378779602000895
    • B. Zhaohong and W. Xifan, "Studies on variance reduction technique of Monte Carlo simulation in composite system reliability evaluation", Elect. Power Syst. Res., vol. 63, no. 1, pp. 59-64, Aug. 2002. (Pubitemid 34862976)
    • (2002) Electric Power Systems Research , vol.63 , Issue.1 , pp. 59-64
    • Zhaohong, B.1    Xifan, W.2
  • 17
    • 50849114479 scopus 로고    scopus 로고
    • The cross-entropy method for power system combinatorial optimization problems
    • Lausanne, Switzerland, Jul. 1-5
    • D. Ernst, M. Glavic, G. B. Stan, S. Mannor, and L. Wehenkel, "The cross-entropy method for power system combinatorial optimization problems", in Proc. IEEE Power Tech Conf., Lausanne, Switzerland, Jul. 1-5, 2007.
    • (2007) Proc. IEEE Power Tech Conf.
    • Ernst, D.1    Glavic, M.2    Stan, G.B.3    Mannor, S.4    Wehenkel, L.5
  • 18
    • 76649107383 scopus 로고    scopus 로고
    • Generation capacity reliability evaluation based on Monte Carlo simulation and cross-entropy methods
    • Feb.
    • A. M. Leite da Silva, R. A. González-Fernández, and C. Singh, "Generation capacity reliability evaluation based on Monte Carlo simulation and cross-entropy methods", IEEE Trans. Power Syst., vol. 25, no. 1, pp. 129-137, Feb. 2010.
    • (2010) IEEE Trans. Power Syst. , vol.25 , Issue.1 , pp. 129-137
    • Leite Da Silva, A.M.1    González-Fernández, R.A.2    Singh, C.3
  • 19
    • 0028481002 scopus 로고
    • Evaluation of reliability worth in composite systems based on pseudo-sequential Monte Carlo simulation
    • Aug.
    • J. C. O. Mello, M. V. F. Pereira, and A. M. Leite da Silva, "Evaluation of reliability worth in composite systems based on pseudo-sequential Monte Carlo simulation", IEEE Trans. Power Syst., vol. 9, no. 3, pp. 1318-1326, Aug. 1994.
    • (1994) IEEE Trans. Power Syst. , vol.9 , Issue.3 , pp. 1318-1326
    • Mello, J.C.O.1    Pereira, M.V.F.2    Leite Da Silva, A.M.3
  • 20
    • 76649127720 scopus 로고    scopus 로고
    • Long-term probabilistic evaluation of operating reserve requirements with renewable sources
    • Feb.
    • A. M. Leite da Silva, W. S. Sales, L. A. F. Manso, and R. Billinton, "Long-term probabilistic evaluation of operating reserve requirements with renewable sources", IEEE Trans. Power Syst., vol. 25, no. 1, pp. 106-116, Feb. 2010.
    • (2010) IEEE Trans. Power Syst. , vol.25 , Issue.1 , pp. 106-116
    • Leite Da Silva, A.M.1    Sales, W.S.2    Manso, L.A.F.3    Billinton, R.4
  • 21
    • 0032592961 scopus 로고    scopus 로고
    • The IEEE reliability test system-1996
    • IEEE APM subcommittee, Aug.
    • IEEE APM subcommittee, "The IEEE reliability test system-1996", IEEE Trans. Power Syst., vol. 14, no. 3, pp. 1010-1020, Aug. 1999.
    • (1999) IEEE Trans. Power Syst. , vol.14 , Issue.3 , pp. 1010-1020


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.