-
1
-
-
0141638466
-
Green power: What is it and where can we find it?
-
Jan./Feb.
-
S. Rahman "Green Power: What is it and where can we find it?," IEEE Power and Energy Magazine, vol. 1, no. 1, pp. 30-37, Jan./Feb. 2003.
-
(2003)
IEEE Power and Energy Magazine
, vol.1
, Issue.1
, pp. 30-37
-
-
Rahman, S.1
-
2
-
-
49249127020
-
-
access through, May
-
Global Wind 2007 Report, (access through http://www.gwec.net/fileadmin/ documents/test2/gwec-08-update-FINAL.pdf), May 2008.
-
(2008)
Global Wind 2007 Report
-
-
-
4
-
-
0021388829
-
Reliability modeling of large wind farms and electric utility interface systems
-
Mar.
-
X. Wang, H. Dai, and R.J. Thomas, "Reliability modeling of large wind farms and electric utility interface systems," IEEE Trans. on PAS, vol. 103, no. 3, pp. 569-575, Mar. 1984.
-
(1984)
IEEE Trans. on PAS
, vol.103
, Issue.3
, pp. 569-575
-
-
Wang, X.1
Dai, H.2
Thomas, R.J.3
-
5
-
-
0022060780
-
Reliability modeling of generation systems including unconventional energy sources
-
May
-
C. Singh and A. Lago-Gonzalez, "Reliability modeling of generation systems including unconventional energy sources," IEEE Trans. on PAS, vol. 104, no. 5, pp. 1049-1056, May 1985.
-
IEEE Trans. on PAS
, vol.104
, Issue.5
, pp. 1049-1056
-
-
Singh, C.1
Lago-Gonzalez, A.2
-
6
-
-
0022862640
-
A monte carlo simulation for the economical assessment of the contribution of wind energy to power systems
-
Dec.
-
G. Desrochers, M. Blanchard, and S. Sud, "A Monte Carlo simulation for the economical assessment of the contribution of wind energy to power systems," IEEE Trans. on Energy Conv., vol. 1, no. 4, pp. 50-56, Dec. 1986.
-
(1986)
IEEE Trans. on Energy Conv.
, vol.1
, Issue.4
, pp. 50-56
-
-
Desrochers, G.1
Blanchard, M.2
Sud, S.3
-
7
-
-
0025889269
-
Frequency and duration method for reliability evaluation of large-scale hydrothermal generating systems
-
Jan.
-
A.M. Leite da Silva, A.C.G. Melo, and S.H.F. Cunha, "Frequency and duration method for reliability evaluation of large-scale hydrothermal generating systems," IEE Proc.-C, vol.138, no. 1, pp. 94-102, Jan. 1991.
-
(1991)
IEE Proc.-C
, vol.138
, Issue.1
, pp. 94-102
-
-
Da Silva, A.M.L.1
Melo, A.C.G.2
Cunha, S.H.F.3
-
8
-
-
0026682336
-
Incorporating of wind energy conversion systems in conventional generating capacity adequacy assessment
-
Jan.
-
R. Billinton and A.A. Chowdhury, "Incorporating of wind energy conversion systems in conventional generating capacity adequacy assessment," IEE Proc.-C, vol. 139, no. 1, pp. 45-56, Jan. 1992.
-
(1992)
IEE Proc.-C
, vol.139
, Issue.1
, pp. 45-56
-
-
Billinton, R.1
Chowdhury, A.A.2
-
9
-
-
0030385334
-
A sequential simulation technique for adequacy evaluation of generating systems including wind energy
-
Dec.
-
R. Billinton, H. Chen, and R. Ghajar, "A sequential simulation technique for adequacy evaluation of generating systems including wind energy," IEEE Trans. on Energy Conv., vol. 11, no. 4, pp. 728-734, Dec. 1996.
-
(1996)
IEEE Trans. on Energy Conv.
, vol.11
, Issue.4
, pp. 728-734
-
-
Billinton, R.1
Chen, H.2
Ghajar, R.3
-
10
-
-
0030233016
-
Generation availability assessment of wind farms
-
Sept.
-
F.C. Sayas and R.N. Allan, "Generation availability assessment of wind farms," IEE Proc.-GTD, vol. 143, no. 5, pp. 507-518, Sept. 1996.
-
(1996)
IEE Proc.-GTD
, vol.143
, Issue.5
, pp. 507-518
-
-
Sayas, F.C.1
Allan, R.N.2
-
11
-
-
34547683483
-
Application of monte carlo simulation to generating system well-being analysis considering renewable sources
-
Jul.-Aug.
-
A.M. Leite da Silva, L.A.F. Manso, W.S. Sales, L.C. Resende, M.J.Q. Aguiar, M.A. Matos, J.A. Peças Lopes, and V. Miranda, "Application of Monte Carlo simulation to generating system well-being analysis considering renewable sources," European Trans. on Electrical Power, vol. 17, no. 4, pp. 387-400, Jul.-Aug. 2007.
-
(2007)
European Trans. on Electrical Power
, vol.17
, Issue.4
, pp. 387-400
-
-
Silva, A.M.L.D.1
Manso, L.A.F.2
Sales, W.S.3
Resende, L.C.4
Aguiar, M.J.Q.5
Matos, M.A.6
Lopes, J.A.P.7
Miranda, V.8
-
12
-
-
76649092355
-
Dealing with intermittent generation in the long-term evaluation of system adequacy and operational reserve requirements in the iberian peninsula
-
Paris, France, Paper C1-304, Aug.
-
J.A. Peças Lopes, M. Matos, A.M. Leite da Silva, W.S. Sales et al., "Dealing with intermittent generation in the long-term evaluation of system adequacy and operational reserve requirements in the Iberian peninsula," Cigré Proceedings, Paris, France, Paper C1-304, Aug. 2008.
-
(2008)
Cigré Proceedings
-
-
Lopes, J.A.P.1
Matos, M.2
Da Silva, A.M.L.3
Sales, W.S.4
-
13
-
-
0000469059
-
Composite generation/transmission reliability evaluation
-
April
-
M.V.F. Pereira and N.J. Balu, "Composite generation/transmission reliability evaluation," Proceedings of the IEEE, vol. 80, no. 4, pp. 470- 491, April 1992.
-
(1992)
Proceedings of the IEEE
, vol.80
, Issue.4
, pp. 470-491
-
-
Pereira, M.V.F.1
Balu, N.J.2
-
16
-
-
0026866453
-
Frequency and duration calculations in composite generation and transmission reliability evaluation
-
May
-
A.C.G. Melo, M.V.F. Pereira, and A.M. Leite da Silva, "Frequency and duration calculations in composite generation and transmission reliability evaluation," IEEE Trans. on Power Syst., vol. 7, no. 2, pp. 469-476, May 1992.
-
(1992)
IEEE Trans. on Power Syst.
, vol.7
, Issue.2
, pp. 469-476
-
-
Melo, A.C.G.1
Pereira, M.V.F.2
Da Silva, A.M.L.3
-
17
-
-
9244223597
-
Well-being analysis for composite generation and transmission systems
-
Nov.
-
A.M. Leite da Silva, L.C. Resende, L.A.F. Manso, and R. Billinton, "Well-being analysis for composite generation and transmission systems," IEEE Trans. on Power Syst., vol. 19, no. 4, pp. 1763-1770, Nov. 2004.
-
(2004)
IEEE Trans. on Power Syst.
, vol.19
, Issue.4
, pp. 1763-1770
-
-
Da Silva, A.M.L.1
Resende, L.C.2
Manso, L.A.F.3
Billinton, R.4
-
18
-
-
0034138495
-
Pseudo-chronological simulation for composite reliability analysis with time varying loads
-
Feb.
-
A.M. Leite da Silva, L.A.F. Manso, J.C.O. Mello, and R. Billinton, "Pseudo-chronological simulation for composite reliability analysis with time varying loads," IEEE Trans. on Power Syst., vol. 15, no. 1, pp. 73- 80, Feb. 2000.
-
(2000)
IEEE Trans. on Power Syst.
, vol.15
, Issue.1
, pp. 73-80
-
-
Da Silva, A.M.L.1
Manso, L.A.F.2
Mello, J.C.O.3
Billinton, R.4
-
20
-
-
49249091610
-
Reliability assessment of the brazilian power system using enumeration and monte carlo
-
Aug.
-
M.Th. Schilling and A.M. Rei, "Reliability assessment of the Brazilian power system using enumeration and Monte Carlo," IEEE Trans. on Power Syst., vol. 23, no. 3, Aug. 2008.
-
(2008)
IEEE Trans. on Power Syst.
, vol.23
, Issue.3
-
-
Schilling, M.Th.1
Rei, A.M.2
-
21
-
-
49249086737
-
Population-based intelligent search in reliability evaluation of generation systems with wind power penetration
-
Aug.
-
L. Wang and C. Singh, "Population-based intelligent search in reliability evaluation of generation systems with wind power penetration," IEEE Trans. on Power Syst., vol. 23, no. 3, pp. 1336-1345, Aug. 2008.
-
(2008)
IEEE Trans. on Power Syst.
, vol.23
, Issue.3
, pp. 1336-1345
-
-
Wang, L.1
Singh, C.2
-
22
-
-
70350738355
-
Improving power system reliability calculation efficiency with ESPO variants
-
Nov.
-
V. Miranda, L.M. Carvalho, M.A. Rosa, A.M. Leite da Silva, and C. Singh, "Improving power system reliability calculation efficiency with EPSO variants," IEEE Trans. on Power Syst., vol. 24, no. 4, pp. 1772- 1779, Nov. 2009.
-
(2009)
IEEE Trans. on Power Syst.
, vol.24
, Issue.4
, pp. 1772-1779
-
-
Miranda, V.1
Carvalho, L.M.2
Rosa, M.A.3
Da Silva, A.M.L.4
Singh, C.5
-
23
-
-
76649107383
-
Generating capacity reliability evaluation based on monte carlo simulation and cross entropy methods
-
Feb.
-
A.M. Leite da Silva, R.A. González-Fernández, and C. Singh, "Generating capacity reliability evaluation based on Monte Carlo simulation and cross entropy methods," IEEE Trans. on Power Syst., vol. 25, no. 1, pp. 129-137, Feb. 2010.
-
(2010)
IEEE Trans. on Power Syst.
, vol.25
, Issue.1
, pp. 129-137
-
-
Da Silva, A.M.L.1
González-Fernández, R.A.2
Singh, C.3
-
24
-
-
0032592961
-
The IEEE reliability test system - 1996
-
APM Subcommittee, Aug.
-
APM Subcommittee, "The IEEE Reliability Test System - 1996," IEEE Trans. on Power Syst., vol. 14, no. 3, pp. 1010-1020, Aug. 1999.
-
(1999)
IEEE Trans. on Power Syst.
, vol.14
, Issue.3
, pp. 1010-1020
-
-
-
25
-
-
76649127720
-
Long-term probabilistic evaluation of operating reserve requirements with renewable sources
-
Feb.
-
A.M. Leite da Silva, W.S. Sales, L.A.F. Manso, and R. Billinton, "Long-term probabilistic evaluation of operating reserve requirements with renewable sources," IEEE Trans. on Power Syst., vol. 25, no. 1, pp. 106-116, Feb. 2010.
-
(2010)
IEEE Trans. on Power Syst.
, vol.25
, Issue.1
, pp. 106-116
-
-
Da Silva, A.M.L.1
Sales, W.S.2
Manso, L.A.F.3
Billinton, R.4
|