메뉴 건너뛰기




Volumn , Issue , 2011, Pages

Active distribution network reliability assessment with a pseudo sequential Monte Carlo method

Author keywords

Active Distribution Networks; IT infrastructure; power system operation and control; Reliability

Indexed keywords

CONTROL STRATEGIES; DISTRIBUTION AUTOMATION; DISTRIBUTION NETWORK; DISTRIBUTION SYSTEMS; IT INFRASTRUCTURES; MANAGEMENT SYSTEMS; POWER SYSTEM OPERATIONS; SEQUENTIAL MONTE CARLO METHODS; SYSTEM OPERATOR;

EID: 80053381061     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/PTC.2011.6019417     Document Type: Conference Paper
Times cited : (25)

References (16)
  • 1
    • 80053343908 scopus 로고    scopus 로고
    • Active Distribution Networks: General features, present status of implementation and operation practices
    • Oct. ISSN: 1286-1146
    • C. Abbey, F. Pilo et al., "Active Distribution Networks: general features, present status of implementation and operation practices", ELECTRA, n. 2 4 6, Oct. 2009, ISSN: 1286-1146.
    • (2009) ELECTRA , Issue.246
    • Abbey, C.1    Pilo, F.2
  • 3
    • 0028481002 scopus 로고
    • Evaluation of reliability worth in composite system based on pseudo-sequential Monte Carlo simulation
    • Aug.
    • J.C.O. Mello. M.V.F, Pereira and A.M. Leite da Silva, "Evaluation of reliability worth in composite system based on pseudo-sequential Monte Carlo simulation," IEEE Trans. Power Systems, vol. 9, n. 3, pp. 1318- 1326, Aug. 1994.
    • (1994) IEEE Trans. Power Systems , vol.9 , Issue.3 , pp. 1318-1326
    • Mello, J.C.O.1    Pereira, M.V.F.2    Leite Da Silva, A.M.3
  • 4
    • 0034138495 scopus 로고    scopus 로고
    • Pseudo-Chronological Simulation for composite reliability analysis with time varying loads
    • Feb.
    • A.M. Leite da Silva, L.A.F. Manso, J.C.O. Mello and R. Billinton, "Pseudo-Chronological Simulation for composite reliability analysis with time varying loads", IEEE Trans. Power Systems, vol. 15, n. 1, pp. 73-80, Feb. 2000.
    • (2000) IEEE Trans. Power Systems , vol.15 , Issue.1 , pp. 73-80
    • Leite Da Silva, A.M.1    Manso, L.A.F.2    Mello, J.C.O.3    Billinton, R.4
  • 6
    • 0032204324 scopus 로고    scopus 로고
    • Distribution system reliability cost/worth analysis using analytical and sequential simulation techniques
    • R. Billinton and P. Wang, "Distribution system reliability cost/worth analysis using analytical and sequential simulation techniques", IEEE Trans. Power Systems, vol. 13, n. 14, pp. 1245-1250, Nov. 1998. (Pubitemid 128749006)
    • (1998) IEEE Transactions on Power Systems , vol.13 , Issue.4 , pp. 1245-1250
    • Billinton, R.1    Wang, P.2
  • 7
    • 0036124732 scopus 로고    scopus 로고
    • Reliability cost/worth assessment of distribution systems incorporating time-varying weather conditions and restoration resources
    • DOI 10.1109/61.974216, PII S0885897702005794
    • R. Billinton and P. Wang, "Reliability cost/worth assessment of distribution systems incorporating time-varying weather conditions and restorations resources", IEEE Trans. Power Delivery, vol. 17, n. 1, pp. 260-265, Jan. 2002. (Pubitemid 34221347)
    • (2002) IEEE Transactions on Power Delivery , vol.17 , Issue.1 , pp. 260-265
    • Wang, P.1    Billinton, R.2
  • 8
    • 24944433165 scopus 로고    scopus 로고
    • Analytical and Monte Carlo approaches to evaluate probability distributions of interruption duration
    • DOI 10.1109/TPWRS.2005.851944
    • A.M. Leite da Silva, W.F. Schmitt, A.M. Cassula and C.E. Sacramento, "Analytical and Monte Carlo approaches to evaluate probability distributions of interruption duration", IEEE Trans. Power Systems, vol. 20, n. 3, pp.1341-1348, Aug. 2005. (Pubitemid 41300946)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.3 , pp. 1341-1348
    • Leite, DaS.A.M.1    Schmitt, W.F.2    Cassula, A.M.3    Sacramento, C.E.4
  • 9
    • 84872107661 scopus 로고    scopus 로고
    • Reliability assessment of a distributed system with dispersed generation including fault location and restoration processes
    • session 4, paper 74.
    • M. Megdiche, Y. Bésanger, J. Aupied and N. Hadjsaïd, "Reliability assessment of a distributed system with dispersed generation including fault location and restoration processes", in Proc. of 2003 CIRED Conf., session 4, paper 74.
    • Proc. of 2003 CIRED Conf.
    • Megdiche, M.1    Bésanger, Y.2    Aupied, J.3    Hadjsaïd, N.4
  • 10
    • 46149105230 scopus 로고    scopus 로고
    • Probabilistic reliability evaluation for distribution systems with der and microgrids
    • Y. Sun, M.H.J. Bollen and G.W. Ault, "Probabilistic reliability evaluation for distribution systems with DER and microgrids", in Proc. of 2006 PMAPS Conf..
    • Proc. of 2006 PMAPS Conf.
    • Sun, Y.1    Bollen, M.H.J.2    Ault, G.W.3
  • 12
    • 80053366776 scopus 로고    scopus 로고
    • Update to Strategic Plan for ADA/Smarter Distribution Systems
    • January
    • F. Goodman et al., "Update to Strategic Plan for ADA/Smarter Distribution Systems", EPRI Technical Report 1016031, January 2009.
    • (2009) EPRI Technical Report 1016031
    • Goodman, F.1
  • 13
    • 85009963937 scopus 로고    scopus 로고
    • Technical and system requirements for advanced distribution automation
    • session 5
    • M. McGranaghan, F. Goodman, "Technical and system requirements for advanced distribution automation", in Proc. of 2005 CIRED Conf., session 5.
    • Proc. of 2005 CIRED Conf.
    • McGranaghan, M.1    Goodman, F.2
  • 14
    • 33645156923 scopus 로고    scopus 로고
    • A Survey on Communication Networks for Electric System Automation
    • V.C. Gungor, F.C. Lambert, "A Survey on Communication Networks for Electric System Automation", Computer Network Journal (Elsevier), vol. 50, pp. 877-897, 2006.
    • (2006) Computer Network Journal (Elsevier) , vol.50 , pp. 877-897
    • Gungor, V.C.1    Lambert, F.C.2
  • 15
    • 80052349131 scopus 로고    scopus 로고
    • Optimal coordination of Energy Resources with a two-stage on-line Active Management
    • to be published
    • F. Pilo, G. Pisano, G.G. Soma, "Optimal coordination of Energy Resources with a two-stage on-line Active Management", IEEE Trans. Industrial Electronics, to be published.
    • IEEE Trans. Industrial Electronics
    • Pilo, F.1    Pisano, G.2    Soma, G.G.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.