메뉴 건너뛰기




Volumn , Issue , 2010, Pages

Reliability assessment of Active Distribution Networks

Author keywords

Active Distribution Networks; Distributed energy resources; Markov models; Reliability; Sequential Monte Carlo

Indexed keywords

ACTIVE DISTRIBUTION NETWORKS; DISTRIBUTED ENERGY RESOURCES; ELECTROMECHANICAL COMPONENTS; INTERMITTENT ENERGY SOURCE; MARKOV MODEL; QUANTITATIVE RISK EVALUATIONS; RELIABILITY ASSESSMENTS; SEQUENTIAL MONTE CARLO;

EID: 84876763419     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (9)

References (11)
  • 3
    • 70450200446 scopus 로고    scopus 로고
    • Optimal planning of active networks
    • Glasgow, Scotland, 14-18 July
    • G. Celli, et al. "Optimal planning of active networks", Proc. of PSCC Conference, Glasgow, Scotland, 14-18 July 2008
    • (2008) Proc. of PSCC Conference
    • Celli, G.1
  • 6
    • 0000469059 scopus 로고
    • Composite generation/transmission reliability evaluation
    • April
    • M.V.F Pereira and N Balu, Composite Generation/Transmission Reliability Evaluation, IEEE Proc., vol. 80, n. 4, April 1992, pp. 470-491.
    • (1992) IEEE Proc. , vol.80 , Issue.4 , pp. 470-491
    • Pereira, M.V.F.1    Balu, N.2
  • 7
    • 0025889269 scopus 로고
    • A frequency and duration method for reliability evaluation of large scale hydrothermal generating systems
    • Jan.
    • A.M. Leite da Silva et al., A Frequency and Duration Method for Reliability Evaluation of Large Scale Hydrothermal Generating Systems, IEE Proceedings, Part C, Vol. 138, no. 1, pp. 94-102, Jan. 1991.
    • (1991) IEE Proceedings, Part C , vol.138 , Issue.1 , pp. 94-102
    • Leite Da Silva, A.M.1
  • 9
    • 0028481002 scopus 로고
    • Evaluation of reliability worth in composite systems based on pseudo-sequential Monte Carlo simulation
    • August
    • J.C.O. Mello, et al., Evaluation of reliability worth in composite systems based on pseudo-sequential Monte Carlo simulation, IEEE Trans. on Power System, vol. 9, n. 3, August 1994, pp. 1318-1326.
    • (1994) IEEE Trans. on Power System , vol.9 , Issue.3 , pp. 1318-1326
    • Mello, J.C.O.1
  • 10
    • 84876776816 scopus 로고    scopus 로고
    • Probabilistic evaluation of static and operating reserve requirements of generating systems with renewable power sources: The portuguese and spanish cases
    • October
    • M. Matos, J.P. Lopes, et al., Probabilistic Evaluation of Static and Operating Reserve Requirements of Generating Systems with renewable Power Sources: The Portuguese and Spanish Cases, Intern Journal of Electrical Power and Energy Systems 2009; Vol. 29, n. 2, October 2009, pp. 155-162.
    • (2009) Intern Journal of Electrical Power and Energy Systems 2009 , vol.29 , Issue.2 , pp. 155-162
    • Matos, M.1    Lopes, J.P.2
  • 11
    • 16244381179 scopus 로고    scopus 로고
    • A failure to communicate: Next generation communication requirements, technologies and architecture for the electric power grid
    • C.H. Hauser, D.E. Bakken, A. Bose, A failure to communicate: next generation communication requirements, technologies and architecture for the electric power grid, IEEE Power and Energy Magazine vol. 3, 47-55, 2005.
    • (2005) IEEE Power and Energy Magazine , vol.3 , pp. 47-55
    • Hauser, C.H.1    Bakken, D.E.2    Bose, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.