Volumn 47, Issue 3, 2011, Pages 1507-1514

Probabilistic wind energy modeling in electric generation system reliability assessment

Author keywords

Cost; outage rate; planning; reliability; transmission availability; wind energy

Indexed keywords

COMMERCIAL FACILITIES; DEVELOPED MODEL; ELECTRIC GENERATION SYSTEMS; IEEE-RELIABILITY TEST SYSTEM; INTERMITTENCY; OUTAGE RATE; POWER GRIDS; PROBABILISTIC FRAMEWORK; PROBABILISTIC RELIABILITY ASSESSMENT; RELIABILITY ASSESSMENTS; RELIABILITY MODEL; RELIABILITY MODELING; RENEWABLE RESOURCE; RESOURCE AVAILABILITY; STOCHASTIC CHARACTERISTIC; SYSTEM RELIABILITY; TRANSMISSION LINE; WIND ENERGY; WIND ENERGY CONVERSION SYSTEM; WIND ENERGY INTEGRATION; WIND ENERGY SOURCES; WIND FARM; WIND GENERATION; WIND RESOURCES;

EID: 79956365865     PISSN: 00939994     EISSN: None     Source Type: Journal    
DOI: 10.1109/TIA.2011.2127435     Document Type: Article
Times cited : (54)

References (13)
  • 1
    • 67649493652 scopus 로고    scopus 로고
    • California Energy Commission, Sacramento, CA, CEC-100-2007-008-CMF
    • "2007 Integrated energy policy report," California Energy Commission, Sacramento, CA, CEC-100-2007-008-CMF, p. 101, 2007.
    • (2007) 2007 Integrated Energy Policy Report , pp. 101
  • 2
    • 79956354286 scopus 로고    scopus 로고
    • Practice of large wind generation interconnection study in CAISO
    • Calgary, AB, Canada, Jul. 26-30
    • A. A. Chowdhury, Y. Zhang, H. Liu, S. Zhu, and D. Le, "Practice of large wind generation interconnection study in CAISO," in Proc. IEEE PES Gen. Meeting, Calgary, AB, Canada, Jul. 26-30, 2009, pp. 1-7.
    • (2009) Proc. IEEE PES Gen. Meeting , pp. 1-7
    • Chowdhury, A.A.1    Zhang, Y.2    Liu, H.3    Zhu, S.4    Le, D.5
  • 5
    • 79956342844 scopus 로고    scopus 로고
    • Reliability assessment of wind generation in planning and operating phases in generation system
    • Calgary, AB, Canada, July 26-30
    • Y. Zhang and A. A. Chowdhury, "Reliability assessment of wind generation in planning and operating phases in generation system," in Proc. IEEE PES Gen. Meeting, Calgary, AB, Canada, July 26-30, 2009, pp. 1-7.
    • (2009) Proc. IEEE PES Gen. Meeting , pp. 1-7
    • Zhang, Y.1    Chowdhury, A.A.2
  • 7
    • 0018040081 scopus 로고
    • Reliability evaluation in energy limited generating capacity studies
    • R. Billionton and P. Harrington, "Reliability evaluation in energy limited generating capacity studies," IEEE Trans. Power App. Syst., vol. PAS-97, no. 6, pp. 2076-2085, Nov. 1978. (Pubitemid 9413495)
    • (1978) IEEE Trans Power Appar Syst , vol.PAS-97 , Issue.6 , pp. 2076-2085
    • Billinton Roy1    Harrington Patrick, G.2
  • 8
    • 0020497503 scopus 로고
    • Development of a new procedure for reliability modeling of wind turbine generators
    • P. Giorsetto and K. F. Utsurogi, "Development of a new procedure for reliability modeling of wind turbine generators," IEEE Trans. Power App. Syst., vol. PAS-102, no. 1, pp. 134-143, Jan. 1983. (Pubitemid 13493658)
    • (1983) IEEE transactions on power apparatus and systems , vol.PAS-102 , Issue.1 , pp. 134-143
    • Giorsetto Paul1    Utsurogi Kent, F.2
  • 9
    • 0021388829 scopus 로고
    • Reliability modeling of large wind farms and associated electric utility interface systems
    • X. Wang, H. Dai, and R. Thomas, "Reliability modeling of large wind farms and associated electric utility interface systems," IEEE Trans. Power App. Syst., vol. PAS-103, no. 3, pp. 569-575, Mar. 1984. (Pubitemid 14528772)
    • (1984) IEEE transactions on power apparatus and systems , vol.PAS-103 , Issue.3 , pp. 569-575
    • Xifan Wang1    Hui-Zhu Dai2    Thomas, R.J.3
  • 10
    • 27144467492 scopus 로고    scopus 로고
    • Reliability models for large wind farms in generation system planning
    • 2005 IEEE Power Engineering Society General Meeting
    • A. A. Chowdhury, "Reliability models for large wind farms in generation system planning," in Proc. IEEE PES Annu. Gen. Meeting, San Francisco, CA, Jun. 12-16, 2005, pp. 1926-1933. (Pubitemid 41497237)
    • (2005) 2005 IEEE Power Engineering Society General Meeting , vol.2 , pp. 1926-1933
    • Chowdhury, A.A.1
  • 11
    • 0030241740 scopus 로고    scopus 로고
    • Time-series models for reliability evaluation of power systems including wind energy
    • DOI 10.1016/0026-2714(95)00154-9
    • R. Billinton, H. Chen, and R. Ghajar, "Time-series models for reliability evaluation of power systems including wind energy," Microelectron. Reliab., vol. 36, no. 9, pp. 1253-1261, Sep. 1996. (Pubitemid 126378823)
    • (1996) Microelectronics Reliability , vol.36 , Issue.9 , pp. 1253-1261
    • Billinton, R.1    Chen, H.2    Ghajar, R.3
  • 13
    • 0018544097 scopus 로고
    • IEEE reliability test system
    • Nov.
    • "IEEE reliability test system," IEEE Trans. Power App. Syst., vol. PAS-98, no. 6, pp. 2047-2054, Nov. 1979.
    • (1979) IEEE Trans. Power App. Syst. , vol.PAS-98 , Issue.6 , pp. 2047-2054


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.