메뉴 건너뛰기




Volumn , Issue , 2011, Pages 462-469

Preparation of constraints for construction simulation

Author keywords

Constraints; Construction management; Simulation

Indexed keywords

BUILDING INFORMATION MODEL - BIM; CONSTRAINTS; CONSTRUCTION MANAGEMENT; CONSTRUCTION PROCESS; CONSTRUCTION PROJECTS; CONSTRUCTION SCHEDULING; CONSTRUCTION SIMULATION; CONSTRUCTION SITES; DATA AGGREGATION; DATA PREPARATION; DISCRETE EVENTS; DURING CONSTRUCTION; EFFICIENT CONSTRUCTION; PROCESS INFORMATION; SIMULATION; TEMPORAL CONSTRAINTS;

EID: 80053157325     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1061/41182(416)57     Document Type: Conference Paper
Times cited : (11)

References (11)
  • 1
    • 0032104987 scopus 로고    scopus 로고
    • A framework for applying simulation in construction
    • Abou Rizk, S.M, and Hajjar, D. (1998). "A framework for applying simulation in construction." Can. J. Civ. Eng. 25(3): 604-617.
    • (1998) Can. J. Civ. Eng. , vol.25 , Issue.3 , pp. 604-617
    • Abou Rizk, S.M.1    Hajjar, D.2
  • 2
    • 0043253368 scopus 로고    scopus 로고
    • Formalization and automation of time-space conflict analysis
    • Akinci, B., Fischer, M., Levitt, R., and Carlson, R., (2002). "Formalization and automation of time-space conflict analysis." J. Comp. in Civ. Engrg. Volume 16, Issue 2, pp. 124-134.
    • (2002) J. Comp. in Civ. Engrg. , vol.16 , Issue.2 , pp. 124-134
    • Akinci, B.1    Fischer, M.2    Levitt, R.3    Carlson, R.4
  • 4
    • 0041304359 scopus 로고    scopus 로고
    • Unified modeling methodology for construction simulation
    • Hajjar, D., and AbouRizk, S.M, (2002) "Unified Modeling Methodology for Construction Simulation" J. Constr. Engrg. and Mgmt. Volume 128, Issue 2, pp. 174-185.
    • (2002) J. Constr. Engrg. And Mgmt. , vol.128 , Issue.2 , pp. 174-185
    • Hajjar, D.1    AbouRizk, S.M.2
  • 5
    • 0017539255 scopus 로고
    • CYCLONE-method for modeling of job site processes
    • Halpin, D. W. (1977). "CYCLONE-Method for modeling of job site processes." Journal of the Construction Division, Vol. 103, No. 3, pp. 489-499.
    • (1977) Journal of the Construction Division , vol.103 , Issue.3 , pp. 489-499
    • Halpin, D.W.1
  • 6
    • 80053141672 scopus 로고    scopus 로고
    • Constraint-based multi-objective optimization of construction schedules
    • W. TIZANI (Editor), 30 June-2 July, Nottingham, UK, Nottingham University Press, Paper 122 ISBN 978-1-907284-60-1
    • Hamm, M. and König, M. (2010). "Constraint-based multi-objective optimization of construction schedules." In Computing in Civil and Building Engineering, Proceedings of the International Conference, W. TIZANI (Editor), 30 June-2 July, Nottingham, UK, Nottingham University Press, Paper 122, p. 243, ISBN 978-1-907284-60-1.
    • (2010) Computing in Civil and Building Engineering, Proceedings of the International Conference , pp. 243
    • Hamm, M.1    König, M.2
  • 8
    • 6344232286 scopus 로고    scopus 로고
    • Simplified discrete-event simulation approach for construction simulation
    • Lu, M. (2003). "Simplified discrete-event simulation approach for construction simulation." J. Constr. Engrg. and Mgmt. Volume 129, Issue 5, pp. 537-546.
    • (2003) J. Constr. Engrg. And Mgmt. , vol.129 , Issue.5 , pp. 537-546
    • Lu, M.1
  • 9
    • 80053158386 scopus 로고    scopus 로고
    • Simulation of construction processes considering spatial constraints of crane operations
    • W. TIZANI (Editor), 30 June-2 July, Nottingham, UK, Nottingham University Press, Paper 17 ISBN 978-1-907284-60-1
    • Marx, A., Erlemann, K., and König, M. (2010). "Simulation of Construction Processes considering Spatial Constraints of Crane Operations." In Computing in Civil and Building Engineering, Proceedings of the International Conference, W. TIZANI (Editor), 30 June-2 July, Nottingham, UK, Nottingham University Press, Paper 17, p. 33, ISBN 978-1-907284-60-1.
    • (2010) Computing in Civil and Building Engineering, Proceedings of the International Conference , pp. 33
    • Marx, A.1    Erlemann, K.2    König, M.3
  • 11
    • 23244452222 scopus 로고    scopus 로고
    • Activity object-oriented simulation strategy for modeling construction operations
    • Zhang, H., Tam, C. M., and Li, H. (2005). "Activity object-oriented simulation strategy for modeling construction operations." J. Comp. in Civ. Engrg. Volume 19, Issue 3, pp. 313-322.
    • (2005) J. Comp. in Civ. Engrg. , vol.19 , Issue.3 , pp. 313-322
    • Zhang, H.1    Tam, C.M.2    Li, H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.